SchoolGeo DistrictProject Description$Estimated RangeProject Advertised DateConstruction CategoryStatus
BRONX
D022029 A SCHOOL WITHOUT WALLS PLAYGROUNDS
A SCHOOL WITHOUT WALLS 08OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT$1M - $4M2024/01PLAYGROUNDSDesign
D022250 A SCHOOL WITHOUT WALLS ACCESSIBILITY
A SCHOOL WITHOUT WALLS 08PATH OF TRAVEL-OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT$250K - $500K2024/02ACCESSIBILITYDesign
D021669 ALFRED E. SMITH HS - X EXT. WORK
ALFRED E. SMITH HS - X 07STRUCTURAL CONCRETE FAILURE @ X600$750K - $1M2023/11EXT. WORKDesign
D022216 BRONX CNTR FOR SCIENCE & MATH - X WALK-IN REFRIGERATORS AND FREEZERS
BRONX CNTR FOR SCIENCE & MATH - X 09WALK-IN REFRIGERATORS AND FREEZERS$250K - $500K2024/03WALK-IN REFRIGERATORS AND FREEZERSDesign
D021848 BRONX HEALTH SCIENCES HS - X ROOM CONVERSIONS/UPGRADES
BRONX HEALTH SCIENCES HS - X 11RESO A CAFETERIA UPGRADE$500K - $750K2024/01ROOM CONVERSIONS/UPGRADESDesign
D021047 BRONX INTERNATIONAL - BRONX PLAYGROUNDS
BRONX INTERNATIONAL - BRONX 09TCU REMOVAL/PLAYGROUND REDEVELOPMENT$1M - $4M2023/12PLAYGROUNDSDesign
D021238 BRONX INTERNATIONAL - BRONX ACCESSIBILITY
BRONX INTERNATIONAL - BRONX 09PATH OF TRAVEL TCU REMOVAL/PLAYGROUND REDEVELOPMENT$0 - $250K2023/12ACCESSIBILITYDesign
D022072 BRONX INTERNATIONAL - BRONX ACCESSIBILITY
BRONX INTERNATIONAL - BRONX 09PATH OF TRAVEL SCIENCE LAB UPGRADES$0 - $250K2024/01ACCESSIBILITYDesign
D021042 BRONX LEADERSHIP ACADEMY II HS - BRONX INTERIOR
BRONX LEADERSHIP ACADEMY II HS - BRONX 07IDA INTERIOR SPACES$1M - $4M2023/11INTERIORDesign
X188 SPED - BRONX 07IDA FLOOD ELIMINATION$1M - $4M2023/11EXT. WORKDesign
D021844 BRONX SCHOOL FOR LAW, GOVERNMENT AND JUSTICE GYMNASIUM
BRONX SCHOOL FOR LAW, GOVERNMENT AND JUSTICE 09RESO A GYMNASIUM UPGRADE$250K - $500K2023/12GYMNASIUMDesign
D021826 CROTONA INTERNATIONAL HIGH SCHOOL - BRONX PLAYGROUNDS
CROTONA INTERNATIONAL HIGH SCHOOL - BRONX 10RESO A PLAYGROUND UPGRADE$1M - $4M2024/02PLAYGROUNDSDesign
D021270 FAIRMONT NEIGHBORHOOD SCHOOL EXT. WORK
FAIRMONT NEIGHBORHOOD SCHOOL 12EXTERIOR MASONRY$4M OVER2023/11EXT. WORKDesign
FAIRMONT NEIGHBORHOOD SCHOOL 12ROOFS$4M OVER2023/11EXT. WORKDesign
FAIRMONT NEIGHBORHOOD SCHOOL 12FLOOD ELIMINATION$4M OVER2023/11EXT. WORKDesign
D020065 FORDHAM HS FOR THE ARTS - BRONX MISCELLANEOUS
FORDHAM HS FOR THE ARTS - BRONX 10STRUCTURAL ELEMENTS UNDER POOL$4M OVER2023/12MISCELLANEOUSDesign
D021064 FORDHAM HS FOR THE ARTS - BRONX ACCESSIBILITY
FORDHAM HS FOR THE ARTS - BRONX 10PATH OF TRAVEL STRUCTURAL ELEMENTS UNDER POOL$1M - $4M2023/12ACCESSIBILITYDesign
D021604 GARDEN OF LEARNING AND DISCOVERY PRE-K CENTER EXT. WORK
GARDEN OF LEARNING AND DISCOVERY PRE-K CENTER 09PARAPETS$1M - $4M2024/03EXT. WORKDesign
GARDEN OF LEARNING AND DISCOVERY PRE-K CENTER 09WINDOWS$1M - $4M2024/03EXT. WORKDesign
GARDEN OF LEARNING AND DISCOVERY PRE-K CENTER 09EXTERIOR MASONRY$1M - $4M2024/03EXT. WORKDesign
D021181 HARRY S. TRUMAN HS - X ACCESSIBILITY
HARRY S. TRUMAN HS - X 11PATH OF TRAVEL RESO A ATHLETIC FIELD$4M OVER2024/02ACCESSIBILITYDesign
HARRY S. TRUMAN HS - X 11RESO A ATHLETIC FIELD UPGRADE$4M OVER2024/02ATHLETIC FIELDSDesign
D020591 HERBERT H. LEHMAN HS - X BUILDING SYSTEMS
HERBERT H. LEHMAN HS - X 08VENTILATION @ X405$4M OVER2023/11BUILDING SYSTEMSDesign
D018566 HOLCOMBE L. RUCKER SCHOOLOF COMMUNITY RESEARCH - BRONX BOILER ELECTRIFICATION
HOLCOMBE L. RUCKER SCHOOLOF COMMUNITY RESEARCH - BRONX 08ELECTRIFICATION/HEAT PUMP SYSTEMS$4M OVER2023/12BOILER ELECTRIFICATIONDesign
LONGWOOD PREPARATORY ACADEMY 08FIRE ALARM SYSTEM REPLACEMENT$4M OVER2023/12ELECTRICALDesign
LONGWOOD PREPARATORY ACADEMY 08ELECTRICAL SERVICE UPGRADE$4M OVER2023/12ELECTRICALDesign
D021653 I.S. 118 - BRONX PLAYGROUNDS
I.S. 118 - BRONX 10OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT$1M - $4M2024/04PLAYGROUNDSDesign
D022033 I.S. 215 - BRONX PLAYGROUNDS
I.S. 215 - BRONX 09RESO A PLAYGROUND UPGRADE$250K - $500K2024/05PLAYGROUNDSScope
D021798 I.S. 303 - BRONX LIBRARY UPGRADES
I.S. 303 - BRONX 09RESO A LIBRARY UPGRADE$250K - $500K2023/11LIBRARY UPGRADESDesign
D022218 I.S. 339 - BRONX WALK-IN REFRIGERATORS AND FREEZERS
I.S. 339 - BRONX 09WALK-IN REFRIGERATORS AND FREEZERS$250K - $500K2024/03WALK-IN REFRIGERATORS AND FREEZERSDesign
D021915 I.S. 390 - BRONX ELECTRICAL
I.S. 390 - BRONX 10FIRE ALARM SYSTEM REPLACEMENT$1M - $4M2024/03ELECTRICALDesign
D021829 I.S. 391 - BRONX PLAYGROUNDS
I.S. 391 - BRONX 10RESO A PLAYGROUND UPGRADE$4M OVER2024/01PLAYGROUNDSDesign
P026375 I.S. 391 - BRONX ELECTRICAL
I.S. 391 - BRONX 10RESO A IPDVS CAMERA INSTALLATION$250K - $500K2023/11ELECTRICALDesign
P.S. 68 - BRONX 11IPDVS CAMERA INSTALLATION$250K - $500K2023/11ELECTRICALDesign
D021633 I.S. 424 - BRONX AUDITORIUM UPGRADES
I.S. 424 - BRONX 08RESO A AUDITORIUM UPGRADE$750K - $1M2024/03AUDITORIUM UPGRADESDesign
D021797 I.S. 562 - BRONX AUDITORIUM UPGRADES
I.S. 562 - BRONX 08RESO A AUDITORIUM UPGRADE$500K - $750K2023/11AUDITORIUM UPGRADESDesign
D021991 I.S. 562 - BRONX ACCESSIBILITY
I.S. 562 - BRONX 08PATH OF TRAVEL RESO A AUDITORIUM UPGRADE$0 - $250K2023/11ACCESSIBILITYDesign
D020997 M.S. 363 - BRONX MISCELLANEOUS
M.S. 363 - BRONX 10SWIMMING POOL$1M - $4M2023/11MISCELLANEOUSDesign
D021085 M.S. 363 - BRONX EXT. WORK
M.S. 363 - BRONX 10EXTERIOR MASONRY @ X115$1M - $4M2023/11EXT. WORKDesign
M.S. 363 - BRONX 10WINDOWS$1M - $4M2023/11EXT. WORKDesign
D022044 M.S. 363 - BRONX FLOORS
M.S. 363 - BRONX 10GYM FLOOR REPLACEMENT$1M - $4M2023/12FLOORSDesign
D021476 M.S./H.S. 225 - BRONX ROOM CONVERSIONS/UPGRADES
M.S./H.S. 225 - BRONX 10RESO A ROOM CONVERSION$750K - $1M2024/01ROOM CONVERSIONS/UPGRADESDesign
D022282 M.S./H.S. 225 - BRONX ACCESSIBILITY
M.S./H.S. 225 - BRONX 10PATH OF TRAVEL RESO A ROOM CONVERSION$0 - $250K2024/03ACCESSIBILITYDesign
D021474 M.S./H.S. 368 - BRONX ATHLETIC FIELDS
M.S./H.S. 368 - BRONX 10RESO A ATHLETIC FIELD UPGRADE$750K - $1M2023/12ATHLETIC FIELDSDesign
D021079 MORRIS COLLAB HS TECH & HUMAN - X SCIENCE LAB UPGRADES
MORRIS COLLAB HS TECH & HUMAN - X 09SCIENCE LAB UPGRADES$1M - $4M2023/11SCIENCE LAB UPGRADESDesign
D021454 P.S. 105 - BRONX ACCESSIBILITY
P.S. 105 - BRONX 11EXISTING BUILDING-AUDITORIUM$4M OVER2024/04ACCESSIBILITYDesign
P.S. 105 - BRONX 11EXISTING BUILDING-INTERIOR RENOVATIONS$4M OVER2024/04MISCELLANEOUSDesign
P.S. 105 - BRONX 11EXISTING BUILDING-IPDVS WORK$4M OVER2024/04ELECTRICALDesign
P.S. 105 - BRONX 11EXISTING BUILDING-FIRE ALARM WORK$4M OVER2024/04ELECTRICALDesign
P.S. 105 - BRONX 11EXISTING BUILDING-ELECTRICAL SYSTEMS$4M OVER2024/04ELECTRICALDesign
P.S. 105 - BRONX 11PARAPETS$4M OVER2024/04EXT. WORKDesign
P.S. 105 - BRONX 11EXTERIOR MASONRY$4M OVER2024/04EXT. WORKDesign
D021660 P.S. 105 - BRONX ACCESSIBILITY
P.S. 105 - BRONX 11EXISTING BUILDING-GYMNASIUM$500K - $750K2023/12ACCESSIBILITYDesign
D021629 P.S. 107 - BRONX EXT. WORK
P.S. 107 - BRONX 08EXTERIOR MASONRY$1M - $4M2023/11EXT. WORKDesign
P.S. 107 - BRONX 08PARAPETS$1M - $4M2023/11EXT. WORKDesign
P.S. 107 - BRONX 08ROOFS$1M - $4M2023/11EXT. WORKDesign
P.S. 107 - BRONX 08FLOOD ELIMINATION$1M - $4M2023/11EXT. WORKDesign
D022217 P.S. 11 - BRONX WALK-IN REFRIGERATORS AND FREEZERS
P.S. 11 - BRONX 09WALK-IN REFRIGERATORS AND FREEZERS$250K - $500K2024/03WALK-IN REFRIGERATORS AND FREEZERSDesign
D018712 P.S. 110 - BRONX EXT. WORK
P.S. 110 - BRONX 09REPAIR RETAINING WALLS$1M - $4M2023/11EXT. WORKDesign
P026369 P.S. 110 - BRONX ELECTRICAL
P.S. 110 - BRONX 09IPDVS CAMERA INSTALLATION$250K - $500K2023/11ELECTRICALDesign
P.S. 114 - BRONX 09IPDVS CAMERA INSTALLATION$250K - $500K2023/11ELECTRICALDesign
D021889 P.S. 112 - BRONX PLAYGROUNDS
P.S. 112 - BRONX 11RESO A PLAYGROUND UPGRADE$1M - $4M2024/05PLAYGROUNDSDesign
D021065 P.S. 126 - BRONX ACCESSIBILITY
P.S. 126 - BRONX 09FULL PROGRAM ACCESSIBILITY$4M OVER2023/12ACCESSIBILITYDesign
P.S. 126 - BRONX 09LOW VOLTAGE ELECTRICAL SYSTEMS$4M OVER2023/12ELECTRICALDesign
D020055 P.S. 138 - BRONX BOILER/HEAT PUMP
P.S. 138 - BRONX 08PLANYC BOILER CONVERSION$4M OVER2023/11BOILER/HEAT PUMPDesign
D020056 P.S. 138 - BRONX BOILER/HEAT PUMP
P.S. 138 - BRONX 08PLANYC CLIMATE CONTROL$1M - $4M2023/12BOILER/HEAT PUMPDesign
D021767 P.S. 138 - BRONX MISCELLANEOUS
P.S. 138 - BRONX 08EXISTING BUILDING-INTERIOR RENOVATIONS$1M - $4M2024/05MISCELLANEOUSScope
D022255 P.S. 15 - BRONX GYMNASIUM
P.S. 15 - BRONX 10RESO A GYMNASIUM UPGRADE$500K - $750K2024/04GYMNASIUMScope
D020239 P.S. 150 - BRONX AUDITORIUM UPGRADES
P.S. 150 - BRONX 12RESO A AUDITORIUM UPGRADE$750K - $1M2023/11AUDITORIUM UPGRADESDesign
D019502 P.S. 152 - BRONX EXT. WORK
P.S. 152 - BRONX 08PARAPETS$4M OVER2023/11EXT. WORKDesign
P.S. 152 - BRONX 08ROOFS$4M OVER2023/11EXT. WORKDesign
P.S. 152 - BRONX 08EXTERIOR MASONRY$4M OVER2023/11EXT. WORKDesign
P.S. 152 - BRONX 08CHILLER PLANT UPGRADE$4M OVER2023/11BUILDING SYSTEMSDesign
P.S. 152 - BRONX 08FLOOD ELIMINATION$4M OVER2023/11EXT. WORKDesign
D020917 P.S. 154 - BRONX AUDITORIUM UPGRADES
P.S. 154 - BRONX 07RESO A AUDITORIUM UPGRADE$250K - $500K2023/12AUDITORIUM UPGRADESDesign
D021752 P.S. 195 - BRONX PLAYGROUNDS
P.S. 195 - BRONX 12OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT$1M - $4M2024/01PLAYGROUNDSDesign
D021073 P.S. 199 - BRONX ACCESSIBILITY
P.S. 199 - BRONX 09FULL PROGRAM ACCESSIBILITY$4M OVER2024/01ACCESSIBILITYDesign
D021619 P.S. 199 - BRONX EXT. WORK
P.S. 199 - BRONX 09ROOFS$4M OVER2024/03EXT. WORKDesign
P.S. 199 - BRONX 09PARAPETS$4M OVER2024/03EXT. WORKDesign
P.S. 199 - BRONX 09EXTERIOR MASONRY$4M OVER2024/03EXT. WORKDesign
P.S. 199 - BRONX 09WINDOWS$4M OVER2024/03EXT. WORKDesign
D021256 P.S. 20 - BRONX BOILER/HEAT PUMP
P.S. 20 - BRONX 10HVAC AND BMS UPGRADE$4M OVER2023/11BOILER/HEAT PUMPDesign
P.S. 20 - BRONX 10RTU REPLACEMENT$4M OVER2023/11BUILDING SYSTEMSDesign
P.S. 20 - BRONX 10FIRE ALARM SYSTEM REPLACEMENT$4M OVER2023/11ELECTRICALDesign
D022219 P.S. 214 - BRONX WALK-IN REFRIGERATORS AND FREEZERS
P.S. 214 - BRONX 12WALK-IN REFRIGERATORS AND FREEZERS$250K - $500K2024/03WALK-IN REFRIGERATORS AND FREEZERSDesign
P026368 P.S. 23 - BRONX ELECTRICAL
P.S. 23 - BRONX 10IPDVS CAMERA INSTALLATION$250K - $500K2023/11ELECTRICALDesign
P.S. 54 - BRONX 10RESO A IPDVS CAMERA INSTALLATION$250K - $500K2023/11ELECTRICALDesign
D022139 P.S. 25 - BRONX ELECTRICAL
P.S. 25 - BRONX 07IPDVS CAMERA INSTALLATION$0 - $250K2024/02ELECTRICALDesign
D021110 P.S. 279 - BRONX PLAYGROUNDS
P.S. 279 - BRONX 10PLAYGROUND UPGRADE$4M OVER2024/02PLAYGROUNDSDesign
D021654 P.S. 32 - BRONX PLAYGROUNDS
P.S. 32 - BRONX 10OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT:$1M - $4M2024/05PLAYGROUNDSScope
D021621 P.S. 54 - BRONX EXT. WORK
P.S. 54 - BRONX 10PARAPETS$1M - $4M2024/02EXT. WORKDesign
P.S. 54 - BRONX 10EXTERIOR MASONRY$1M - $4M2024/02EXT. WORKDesign
P.S. 54 - BRONX 10ROOFS$1M - $4M2024/02EXT. WORKDesign
D022140 P.S. 57 - BRONX ELECTRICAL
P.S. 57 - BRONX 12IPDVS CAMERA INSTALLATION$0 - $250K2024/02ELECTRICALDesign
D020016 P.S. 67 - BRONX SCHOOL SAFETY
P.S. 67 - BRONX 12KITCHEN ANSUL SYSTEM$500K - $750K2023/11SCHOOL SAFETYDesign
D021648 P.S. 70 - BRONX PLAYGROUNDS
P.S. 70 - BRONX 09OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT$1M - $4M2024/03PLAYGROUNDSDesign
P.S. 70 - BRONX 09PATH OF TRAVEL-OTHER TEMP STRUCTURE REMOVAL$1M - $4M2024/03ACCESSIBILITYDesign
D021272 P.S. 72 - BRONX EXT. WORK
P.S. 72 - BRONX 08EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
P.S. 72 - BRONX 08WINDOWS$4M OVER2024/01EXT. WORKDesign
P.S. 72 - BRONX 08PARAPETS$4M OVER2024/01EXT. WORKDesign
D022145 P.S. 73 - BRONX PLAYGROUNDS
P.S. 73 - BRONX 09OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT$1M - $4M2024/05PLAYGROUNDSScope
D022023 P.S. 85 - BRONX PLAYGROUNDS
P.S. 85 - BRONX 10OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT$4M OVER2024/02PLAYGROUNDSDesign
D022244 P.S. 85 - BRONX ACCESSIBILITY
P.S. 85 - BRONX 10PATH OF TRAVEL- OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDELOPMENT$0 - $250K2024/01ACCESSIBILITYDesign
D020893 P.S. 86 - BRONX EXT. WORK
P.S. 86 - BRONX 10EXTERIOR WALLS$1M - $4M2023/12EXT. WORKDesign
P.S. 86 - BRONX 10WINDOWS$1M - $4M2023/12EXT. WORKDesign
P.S. 86 - BRONX 10ROOFS$1M - $4M2023/12EXT. WORKDesign
D021190 P.S. 91 - BRONX PLAYGROUNDS
P.S. 91 - BRONX 10RESO A PLAYGROUND UPGRADE$1M - $4M2024/02PLAYGROUNDSDesign
D021712 SCHOOL OF DIPLOMACY AUDITORIUM UPGRADES
SCHOOL OF DIPLOMACY 11AUDITORIUM UPGRADE$1M - $4M2023/12AUDITORIUM UPGRADESDesign
D022020 SCHOOL OF DIPLOMACY ACCESSIBILITY
SCHOOL OF DIPLOMACY 11PATH OF TRAVEL AUDITORIUM UPGRADE$250K - $500K2023/11ACCESSIBILITYDesign
P026325 SCHOOL OF DIPLOMACY SCIENCE LAB UPGRADES
SCHOOL OF DIPLOMACY 11RESO A SCIENCE LAB UPGRADE$1M - $4M2023/11SCIENCE LAB UPGRADESDesign
SCHOOL OF DIPLOMACY 11PATH OF TRAVEL RESO A SCIENCE LAB UPGRADE$1M - $4M2023/11ACCESSIBILITYDesign
D022057 THE WALTON AVENUE SCHOOL PLAYGROUNDS
THE WALTON AVENUE SCHOOL 09TCU REMOVAL/PLAYGROUND REDEVELOPMENT$1M - $4M2024/05PLAYGROUNDSScope
D021743 X721 SPED - BRONX EXT. WORK
X721 SPED - BRONX 11ROOF REPLACEMENT$1M - $4M2024/05EXT. WORKScope
BROOKLYN
D020782 200 CENTRAL AVENUE DAY CARE CENTER LEASES
200 CENTRAL AVENUE DAY CARE CENTER 32ACS EARLY LEARN LEASE RENEWAL$0 - $250K2023/11LEASESDesign
D022064 ABRAHAM LINCOLN HS - BROOKLYN ADMIN/CODE COMP
ABRAHAM LINCOLN HS - BROOKLYN 21ATHLETIC FIELD BLEACHERS C OF O$500K - $750K2024/04ADMIN/CODE COMPDesign
D022069 ACHIEVEMENT FIRST EAST NEW YORK CHARTER SCHOOL - K EXT. WORK
ACHIEVEMENT FIRST EAST NEW YORK CHARTER SCHOOL - K 19PERM FIX- EXTERIOR MASONRY @ K065$4M OVER2024/03EXT. WORKDesign
D021756 BOYS & GIRLS HS - BROOKLYN GYMNASIUM
BOYS & GIRLS HS - BROOKLYN 16GYM UPGRADE$1M - $4M2023/12GYMNASIUMDesign
D022055 BOYS & GIRLS HS - BROOKLYN ACCESSIBILITY
BOYS & GIRLS HS - BROOKLYN 16PATH OF TRAVEL GYM UPGRADE$250K - $500K2023/12ACCESSIBILITYDesign
D022210 BROOKLYN ACADEMY HS - BROOKLYN WALK-IN REFRIGERATORS AND FREEZERS
BROOKLYN ACADEMY HS - BROOKLYN 13WALK-IN REFRIGERATORS AND FREEZERS$750K - $1M2024/03WALK-IN REFRIGERATORS AND FREEZERSDesign
D022100 BROOKLYN LANDMARK ELEMENTARY SCHOOL ELECTRICAL
BROOKLYN LANDMARK ELEMENTARY SCHOOL 23IPDVS INSTALLATION$250K - $500K2023/11ELECTRICALDesign
D021850 BROOKLYN SCIENCE AND ENGINEERING ACADEMY GYMNASIUM
BROOKLYN SCIENCE AND ENGINEERING ACADEMY 18RESO A GYMNASIUM UPGRADE$1M - $4M2023/12GYMNASIUMDesign
D019572 CHRISTOPHER AVENUE COMMUNITY SCHOOL EXT. WORK
CHRISTOPHER AVENUE COMMUNITY SCHOOL 23ROOFS$4M OVER2023/11EXT. WORKDesign
CHRISTOPHER AVENUE COMMUNITY SCHOOL 23PARAPETS$4M OVER2023/11EXT. WORKDesign
CHRISTOPHER AVENUE COMMUNITY SCHOOL 23EXTERIOR MASONRY$4M OVER2023/11EXT. WORKDesign
CHRISTOPHER AVENUE COMMUNITY SCHOOL 23ROOF TOP UNIT$4M OVER2023/11BUILDING SYSTEMSDesign
CHRISTOPHER AVENUE COMMUNITY SCHOOL 23PAVED AREAS- CONCRETE$4M OVER2023/11SITEDesign
D021584 COBBLE HILL SCHL OF AMER. STUD-K EXT. WORK
COBBLE HILL SCHL OF AMER. STUD-K 15ROOFS$4M OVER2023/11EXT. WORKDesign
COBBLE HILL SCHL OF AMER. STUD-K 15PARAPETS$4M OVER2023/11EXT. WORKDesign
COBBLE HILL SCHL OF AMER. STUD-K 15EXTERIOR MASONRY$4M OVER2023/11EXT. WORKDesign
COBBLE HILL SCHL OF AMER. STUD-K 15FLOOD ELIMINATION$4M OVER2023/11EXT. WORKDesign
D020672 CULT ACAD ARTS AND SCI - BROOKLYN ROOM CONVERSIONS/UPGRADES
CULT ACAD ARTS AND SCI - BROOKLYN 18RESO A- CULINARY ARTS KITCHEN$1M - $4M2024/02ROOM CONVERSIONS/UPGRADESDesign
D021038 EDWARD R. MURROW HS - K EXT. WORK
EDWARD R. MURROW HS - K 21IDA FLOOD ELIMINATION$1M - $4M2023/11EXT. WORKDesign
EDWARD R. MURROW HS - K 21IDA GYM PARTITION REPLACEMENT$1M - $4M2023/11GYMNASIUMDesign
P026371 FORT GREENE PREPARATORY ACADEMY - BROOKLYN ELECTRICAL
FORT GREENE PREPARATORY ACADEMY - BROOKLYN 13IPDVS INSTALLATION$500K - $750K2023/11ELECTRICALDesign
P.S. 56 - BROOKLYN 13IPDVS INSTALLATION$500K - $750K2023/11ELECTRICALDesign
D019498 FORT HAMILTON HS - K ELECTRICAL
FORT HAMILTON HS - K 20REPLACE 6' FIRE DOMESTIC WATER MAIN VALVES$250K - $500K2023/11ELECTRICALDesign
D021215 FORT HAMILTON HS - K EXT. WORK
FORT HAMILTON HS - K 20IDA FLOOD ELIMINATION$4M OVER2023/12EXT. WORKDesign
FORT HAMILTON HS - K 20IDA HEATING PLANT UPGRADE$4M OVER2023/12BOILER/HEAT PUMPDesign
FORT HAMILTON HS - K 20IDA CLIMATE CONTROL$4M OVER2023/12BOILER/HEAT PUMPDesign
FORT HAMILTON HS - K 20NON-IDA CLIMATE CONTROL$4M OVER2023/12BOILER/HEAT PUMPDesign
FORT HAMILTON HS - K 20IDA INTERIOR SPACES$4M OVER2023/12INTERIORDesign
FORT HAMILTON HS - K 20IDA POOL BOILER$4M OVER2023/12BOILER/HEAT PUMPDesign
FORT HAMILTON HS - K 20IDA ELECTRICAL SYSTEMS$4M OVER2023/12ELECTRICALDesign
D021565 FRANKLIN D. ROOSEVELT HS - K EXT. WORK
FRANKLIN D. ROOSEVELT HS - K 20ROOFS$4M OVER2023/12EXT. WORKDesign
FRANKLIN D. ROOSEVELT HS - K 20PARAPETS$4M OVER2023/12EXT. WORKDesign
FRANKLIN D. ROOSEVELT HS - K 20EXTERIOR MASONRY$4M OVER2023/12EXT. WORKDesign
FRANKLIN D. ROOSEVELT HS - K 20WINDOWS$4M OVER2023/12EXT. WORKDesign
D022340 HIGH SCHOOL FOR CIVIL RIGHTS - K ATHLETIC FIELDS
HIGH SCHOOL FOR CIVIL RIGHTS - K 19EARLY DEMO PACKAGE$4M OVER2024/02ATHLETIC FIELDSDesign
D022031 HS FOR MEDICAL PROFESSIONS - K SCIENCE LAB UPGRADES
HS FOR MEDICAL PROFESSIONS - K 18RESO A SCIENCE LAB UPGRADE$1M - $4M2023/12SCIENCE LAB UPGRADESDesign
D022040 HS FOR MEDICAL PROFESSIONS - K ACCESSIBILITY
HS FOR MEDICAL PROFESSIONS - K 18PATH OF TRAVEL RESO A SCIENCE LAB UPGRADE$0 - $250K2023/12ACCESSIBILITYDesign
D021738 I.S. 162 - BROOKLYN ACCESSIBILITY
I.S. 162 - BROOKLYN 32FULL PROGRAM ACCESSIBILITY$4M OVER2024/03ACCESSIBILITYDesign
D021817 I.S. 246 - BROOKLYN LIBRARY UPGRADES
I.S. 246 - BROOKLYN 17RESO A LIBRARY UPGRADE$500K - $750K2023/11LIBRARY UPGRADESDesign
D021976 I.S. 246 - BROOKLYN ACCESSIBILITY
I.S. 246 - BROOKLYN 17PATH OF TRAVEL RESO A LIBRARY UPGRADE$0 - $250K2023/11ACCESSIBILITYDesign
D021819 I.S. 259 - BROOKLYN SCIENCE LAB UPGRADES
I.S. 259 - BROOKLYN 20RESO A SCIENCE LAB UPGRADE$750K - $1M2023/11SCIENCE LAB UPGRADESDesign
D021926 I.S. 259 - BROOKLYN ACCESSIBILITY
I.S. 259 - BROOKLYN 20PATH OF TRAVEL RESO A SCIENCE LAB UPGRADE$0 - $250K2023/11ACCESSIBILITYDesign
D021624 I.S. 281 - BROOKLYN EXT. WORK
I.S. 281 - BROOKLYN 21EXTERIOR MASONRY$4M OVER2024/02EXT. WORKDesign
I.S. 281 - BROOKLYN 21WINDOWS$4M OVER2024/02EXT. WORKDesign
I.S. 281 - BROOKLYN 21ROOFS$4M OVER2024/02EXT. WORKDesign
D020169 I.S. 285 - BROOKLYN SCIENCE LAB UPGRADES
I.S. 285 - BROOKLYN 18RESO A SCIENCE LAB UPGRADES$1M - $4M2024/02SCIENCE LAB UPGRADESDesign
D020170 I.S. 285 - BROOKLYN ACCESSIBILITY
I.S. 285 - BROOKLYN 18RESO A PATH OF TRAVEL SCIENCE LAB UPGRADES$0 - $250K2024/02ACCESSIBILITYDesign
D021062 I.S. 291 - BROOKLYN EXT. WORK
I.S. 291 - BROOKLYN 32IDA FLOOD ELIMINATION$4M OVER2023/11EXT. WORKDesign
I.S. 291 - BROOKLYN 32IDA INTERIOR SPACES$4M OVER2023/11INTERIORDesign
D021639 I.S. 291 - BROOKLYN ACCESSIBILITY
I.S. 291 - BROOKLYN 32PATH OF TRAVEL NON-IDA FLOOD ELIMINATION$0 - $250K2023/11ACCESSIBILITYDesign
D019438 I.S. 340 - BROOKLYN ELECTRICAL
I.S. 340 - BROOKLYN 13LOW VOLTAGE ELECTRICAL SYSTEMS$750K - $1M2023/11ELECTRICALDesign
D018437 I.S. 351 - BROOKLYN SCIENCE LAB UPGRADES
I.S. 351 - BROOKLYN 13RESO A COURTYARD GREENHOUSE$1M - $4M2023/11SCIENCE LAB UPGRADESDesign
D020638 I.S. 382 - BROOKLYN EXT. WORK
I.S. 382 - BROOKLYN 17PARAPET AND SIDE OF BUILDING DAMAGE @ K465$4M OVER2023/11EXT. WORKDesign
I.S. 382 - BROOKLYN 17EXTERIOR MASONRY$4M OVER2023/11EXT. WORKDesign
I.S. 382 - BROOKLYN 17ROOFS$4M OVER2023/11EXT. WORKDesign
I.S. 382 - BROOKLYN 17FLOOD ELIMINATION$4M OVER2023/11EXT. WORKDesign
I.S. 382 - BROOKLYN 17WINDOWS$4M OVER2023/11EXT. WORKDesign
D021857 I.S. 452 LIBRARY UPGRADES
I.S. 452 19RESO A LIBRARY UPGRADE$500K - $750K2023/12LIBRARY UPGRADESDesign
D021935 I.S. 452 ACCESSIBILITY
I.S. 452 19PATH OF TRAVEL RESO A LIBRARY UPGRADE$0 - $250K2024/01ACCESSIBILITYDesign
D021863 I.S. 518 - BROOKLYN AUDITORIUM UPGRADES
I.S. 518 - BROOKLYN 23RESO A AUDITORIUM UPGRADE$250K - $500K2023/12AUDITORIUM UPGRADESDesign
D022094 I.S. 577 - BROOKLYN ELECTRICAL
I.S. 577 - BROOKLYN 14IPDVS INSTALLATION$0 - $250K2024/01ELECTRICALDesign
D018776 I.S. 61 - BROOKLYN EXT. WORK
I.S. 61 - BROOKLYN 17ROOFS$4M OVER2024/01EXT. WORKDesign
I.S. 61 - BROOKLYN 17PARAPETS$4M OVER2024/01EXT. WORKDesign
I.S. 61 - BROOKLYN 17WINDOWS$4M OVER2024/01EXT. WORKDesign
I.S. 61 - BROOKLYN 17EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
I.S. 61 - BROOKLYN 17DOORS$4M OVER2024/01SCHOOL SAFETYDesign
I.S. 61 - BROOKLYN 17SIDEWALK ELEVATOR$4M OVER2024/01BUILDING SYSTEMSDesign
I.S. 61 - BROOKLYN 17HVAC UPGRADE FOR CLASSROOMS AND PA SPACES$4M OVER2024/01BUILDING SYSTEMSDesign
I.S. 61 - BROOKLYN 17ELECTRICAL UPGRADE$4M OVER2024/01ELECTRICALDesign
I.S. 61 - BROOKLYN 17HOT WATER HEATERS$4M OVER2024/01BOILER/HEAT PUMPDesign
I.S. 61 - BROOKLYN 17FIRE ALARM SYSTEM REPLACEMENT$4M OVER2024/01ELECTRICALDesign
D022171 I.S. 722 - BROOKLYN BUILDING SYSTEMS
I.S. 722 - BROOKLYN 17CHILLER REPLACEMENT @ K391$1M - $4M2024/04BUILDING SYSTEMSDesign
I.S. 722 - BROOKLYN 17FIRE ALARM SYSTEM$1M - $4M2024/04ELECTRICALDesign
D021248 I.S. 78 - BROOKLYN BOILER/HEAT PUMP
I.S. 78 - BROOKLYN 22PLANYC CLIMATE CONTROL$4M OVER2023/11BOILER/HEAT PUMPDesign
I.S. 78 - BROOKLYN 22PLANYC BOILER CONVERSION$4M OVER2023/11BOILER/HEAT PUMPDesign
I.S. 78 - BROOKLYN 22FIRE ALARM SYSTEM REPLACEMENT$4M OVER2023/11ELECTRICALDesign
D022264 IT TAKES A VILLAGE ACADEMY - K ELECTRICAL
IT TAKES A VILLAGE ACADEMY - K 18FIRE ALARM SYSTEM REPLACEMENT$1M - $4M2024/02ELECTRICALDesign
P026256 IT TAKES A VILLAGE ACADEMY - K ROOM CONVERSIONS/UPGRADES
IT TAKES A VILLAGE ACADEMY - K 18CAFETERIA UPGRADE$4M OVER2023/11ROOM CONVERSIONS/UPGRADESDesign
IT TAKES A VILLAGE ACADEMY - K 18PATH OF TRAVEL CAFETERIA UPGRADE$4M OVER2023/11ACCESSIBILITYDesign
D021897 J.H.S. 50 - BROOKLYN BUILDING SYSTEMS
J.H.S. 50 - BROOKLYN 14REINFORCING SUPPORT ELEMENTS$1M - $4M2023/12BUILDING SYSTEMSDesign
D021706 K036 SPED - BROOKLYN BUILDING SYSTEMS
K036 SPED - BROOKLYN 19ELEVATOR MODERNIZATION$1M - $4M2024/03BUILDING SYSTEMSDesign
K036 SPED - BROOKLYN 19FIRE ALARM SYSTEM REPLACEMENT$1M - $4M2024/03ELECTRICALDesign
K036 SPED - BROOKLYN 19ELECTRICAL SYSTEMS$1M - $4M2024/03ELECTRICALDesign
D021563 K370 SPED - BROOKLYN EXT. WORK
K370 SPED - BROOKLYN 21EXTERIOR MASONRY$1M - $4M2023/11EXT. WORKDesign
D022047 K372 SPED - BROOKLYN PLAYGROUNDS
K372 SPED - BROOKLYN 15PLAYGROUND UPGRADE$500K - $750K2024/01PLAYGROUNDSDesign
D021195 K721 SPED - BROOKLYN WALK-IN REFRIGERATORS AND FREEZERS
K721 SPED - BROOKLYN 21RESO A KITCHEN UPGRADE$1M - $4M2023/11WALK-IN REFRIGERATORS AND FREEZERSDesign
D021012 K753 SPED - BROOKLYN ACCESSIBILITY
K753 SPED - BROOKLYN 13FULL PROGRAM ACCESSIBILITY$1M - $4M2023/11ACCESSIBILITYDesign
D021570 K753 SPED - BROOKLYN EXT. WORK
K753 SPED - BROOKLYN 13ROOFS$4M OVER2023/11EXT. WORKDesign
K753 SPED - BROOKLYN 13PARAPETS$4M OVER2023/11EXT. WORKDesign
D019802 K811 SPED - BROOKLYN ACCESSIBILITY
K811 SPED - BROOKLYN 22FULL PROGRAM ACCESSIBILITY$4M OVER2023/12ACCESSIBILITYDesign
K811 SPED - BROOKLYN 22LOW VOLTAGE ELECTRICAL SYSTEM$4M OVER2023/12ELECTRICALDesign
D020898 LEADERS HIGH SCHOOL - K ACCESSIBILITY
LEADERS HIGH SCHOOL - K 21PATH OF TRAVEL RESO A LIBRARY UPGRADE$1M - $4M2023/11ACCESSIBILITYDesign
LEADERS HIGH SCHOOL - K 21RESO A LIBRARY UPGRADE$1M - $4M2023/11LIBRARY UPGRADESDesign
D021739 LIBERTY AVENUE MIDDLE SCHOOL ACCESSIBILITY
LIBERTY AVENUE MIDDLE SCHOOL 19FULL PROGRAM ACCESSIBILITY$4M OVER2024/03ACCESSIBILITYDesign
D020776 LOVE IN ACTION DAY CARE LEASES
LOVE IN ACTION DAY CARE 23ACS EARLY LEARN LEASE RENEWAL$250K - $500K2024/02LEASESDesign
D021305 MIDWOOD HS - BROOKLYN ATHLETIC FIELDS
MIDWOOD HS - BROOKLYN 21IDA FLOOD ELIMINATION$1M - $4M2023/11ATHLETIC FIELDSDesign
MIDWOOD HS - BROOKLYN 21IDA PAVED AREAS- BLACKTOP$1M - $4M2023/11SITEDesign
MIDWOOD HS - BROOKLYN 21IDA HEATING PLANT UPGRADE$1M - $4M2023/11BOILER/HEAT PUMPDesign
D021659 MOSDOTH DAY CARE CENTER, INC. LEASES
MOSDOTH DAY CARE CENTER, INC. 17ACS EARLY LEARN RENEWAL$250K - $500K2024/04LEASESDesign
D021503 P.S. 1 - BROOKLYN ACCESSIBILITY
P.S. 1 - BROOKLYN 15FULL PROGRAM ACCESSIBILITY$4M OVER2023/11ACCESSIBILITYDesign
P.S. 1 - BROOKLYN 15FIRE ALARM SYSTEM REPLACEMENT$4M OVER2023/11ELECTRICALDesign
D021552 P.S. 1 - BROOKLYN EXT. WORK
P.S. 1 - BROOKLYN 15ROOFS$1M - $4M2023/11EXT. WORKDesign
P.S. 1 - BROOKLYN 15PARAPETS$1M - $4M2023/11EXT. WORKDesign
P.S. 1 - BROOKLYN 15EXTERIOR MASONRY$1M - $4M2023/11EXT. WORKDesign
P026374 P.S. 101 - BROOKLYN ELECTRICAL
P.S. 101 - BROOKLYN 21RESO A IPDVS SYSTEM$250K - $500K2023/11ELECTRICALDesign
P.S. 199 - BROOKLYN 21IPDVS CAMERA INSTALLATION$250K - $500K2023/11ELECTRICALDesign
D021811 P.S. 107 - BROOKLYN PLAYGROUNDS
P.S. 107 - BROOKLYN 15RESO A PLAYGROUND UPGRADE$500K - $750K2024/02PLAYGROUNDSDesign
D021822 P.S. 115 - BROOKLYN LIBRARY UPGRADES
P.S. 115 - BROOKLYN 18RESO A LIBRARY UPGRADE$500K - $750K2024/02LIBRARY UPGRADESDesign
D020536 P.S. 120 - BROOKLYN ACCESSIBILITY
P.S. 120 - BROOKLYN 14FULL PROGRAM ACCESSIBILITY$4M OVER2023/11ACCESSIBILITYDesign
P.S. 120 - BROOKLYN 14LOW VOLTAGE ELECTRICAL SYSTEM$4M OVER2023/11ELECTRICALDesign
D021530 P.S. 120 - BROOKLYN EXT. WORK
P.S. 120 - BROOKLYN 14ROOFS$4M OVER2023/11EXT. WORKDesign
P.S. 120 - BROOKLYN 14PARAPETS$4M OVER2023/11EXT. WORKDesign
P.S. 120 - BROOKLYN 14EXTERIOR MASONRY$4M OVER2023/11EXT. WORKDesign
D021843 P.S. 139 - BROOKLYN AUDITORIUM UPGRADES
P.S. 139 - BROOKLYN 22RESO A AUDITORIUM UPGRADE$750K - $1M2023/11AUDITORIUM UPGRADESDesign
D021969 P.S. 139 - BROOKLYN ACCESSIBILITY
P.S. 139 - BROOKLYN 22PATH OF TRAVEL RESO A AUDITORIUM UPGRADE$0 - $250K2023/11ACCESSIBILITYDesign
D022074 P.S. 139 - BROOKLYN EXT. WORK
P.S. 139 - BROOKLYN 22EXTERIOR MASONRY$250K - $500K2024/03EXT. WORKDesign
D022102 P.S. 145 - BROOKLYN ELECTRICAL
P.S. 145 - BROOKLYN 32IPDVS CAMERA INSTALLATION$0 - $250K2024/03ELECTRICALDesign
D022093 P.S. 15 - BROOKLYN ELECTRICAL
P.S. 15 - BROOKLYN 15IPDVS CAMERA INSTALLATION$0 - $250K2024/01ELECTRICALDesign
D022103 P.S. 151 - BROOKLYN ELECTRICAL
P.S. 151 - BROOKLYN 32IPDVS CAMERA INSTALLATION$0 - $250K2024/01ELECTRICALDesign
D021812 P.S. 152 - BROOKLYN PLAYGROUNDS
P.S. 152 - BROOKLYN 22RESO A PLAYGROUND UPGRADE$500K - $750K2023/11PLAYGROUNDSDesign
P026370 P.S. 156 - BROOKLYN ELECTRICAL
P.S. 156 - BROOKLYN 23IPDVS CAMERA INSTALLATION$250K - $500K2023/11ELECTRICALDesign
P.S. 446 - BROOKLYN 23IPDVS INSTALLATION$250K - $500K2023/11ELECTRICALDesign
D019420 P.S. 157 - BROOKLYN EXT. WORK
P.S. 157 - BROOKLYN 14EXTERIOR MASONRY$4M OVER2023/11EXT. WORKDesign
P.S. 157 - BROOKLYN 14PARAPETS$4M OVER2023/11EXT. WORKDesign
P.S. 157 - BROOKLYN 14FLOOD ELIMINATION$4M OVER2023/11EXT. WORKDesign
P.S. 157 - BROOKLYN 14ROOFS$4M OVER2023/11EXT. WORKDesign
D022208 P.S. 157 - BROOKLYN WALK-IN REFRIGERATORS AND FREEZERS
P.S. 157 - BROOKLYN 14WALK-IN REFRIGERATORS AND FREEZERS$500K - $750K2024/03WALK-IN REFRIGERATORS AND FREEZERSDesign
D018658 P.S. 169 - BROOKLYN ACCESSIBILITY
P.S. 169 - BROOKLYN 15FULL PROGRAM ACCESSIBILITY$4M OVER2024/03ACCESSIBILITYDesign
P.S. 169 - BROOKLYN 15LOW VOLTAGE ELECTRICAL SYSTEM$4M OVER2024/03ELECTRICALDesign
D020186 P.S. 169 - BROOKLYN PLAYGROUNDS
P.S. 169 - BROOKLYN 15RESO A PLAYGROUND UPGRADE$500K - $750K2024/03PLAYGROUNDSDesign
D021554 P.S. 18 - BROOKLYN EXT. WORK
P.S. 18 - BROOKLYN 14ROOFS$4M OVER2024/02EXT. WORKDesign
P.S. 18 - BROOKLYN 14PARAPETS$4M OVER2024/02EXT. WORKDesign
P.S. 18 - BROOKLYN 14EXTERIOR MASONRY$4M OVER2024/02EXT. WORKDesign
P.S. 18 - BROOKLYN 14PLAYGROUND UPGRADE$4M OVER2024/02PLAYGROUNDSDesign
D022106 P.S. 190 - BROOKLYN ELECTRICAL
P.S. 190 - BROOKLYN 19IPDVS INSTALLATION$250K - $500K2024/03ELECTRICALDesign
D020630 P.S. 193 - BROOKLYN ACCESSIBILITY
P.S. 193 - BROOKLYN 22FULL PROGRAM ACCESSIBILITY$4M OVER2023/11ACCESSIBILITYDesign
P.S. 193 - BROOKLYN 22LOW VOLTAGE ELECTRICAL SYSTEM$4M OVER2023/11ELECTRICALDesign
D021559 P.S. 193 - BROOKLYN EXT. WORK
P.S. 193 - BROOKLYN 22PARAPETS$4M OVER2024/02EXT. WORKDesign
P.S. 193 - BROOKLYN 22EXTERIOR MASONRY$4M OVER2024/02EXT. WORKDesign
P.S. 193 - BROOKLYN 22ROOFS$4M OVER2024/02EXT. WORKDesign
D021221 P.S. 20 - BROOKLYN ACCESSIBILITY
P.S. 20 - BROOKLYN 13FULL PROGRAM ACCESSIBILITY$4M OVER2023/12ACCESSIBILITYDesign
P.S. 20 - BROOKLYN 13PLAYGROUND RENOVATION$4M OVER2023/12PLAYGROUNDSDesign
P.S. 20 - BROOKLYN 13FIRE ALARM SYSTEM$4M OVER2023/12ELECTRICALDesign
D021567 P.S. 20 - BROOKLYN EXT. WORK
P.S. 20 - BROOKLYN 13ROOFS$4M OVER2023/12EXT. WORKDesign
P.S. 20 - BROOKLYN 13PARAPETS$4M OVER2023/12EXT. WORKDesign
P.S. 20 - BROOKLYN 13EXTERIOR MASONRY$4M OVER2023/12EXT. WORKDesign
D021758 P.S. 209 - BROOKLYN PLAYGROUNDS
P.S. 209 - BROOKLYN 21TCU REMOVAL/PLAYGROUND REDEVELOPMENT$1M - $4M2023/11PLAYGROUNDSDesign
D021561 P.S. 221 - BROOKLYN EXT. WORK
P.S. 221 - BROOKLYN 17ROOFS$4M OVER2024/02EXT. WORKDesign
P.S. 221 - BROOKLYN 17PARAPETS$4M OVER2024/02EXT. WORKDesign
P.S. 221 - BROOKLYN 17EXTERIOR MASONRY$4M OVER2024/02EXT. WORKDesign
P.S. 221 - BROOKLYN 17FLOOD ELIMINATION$4M OVER2024/02EXT. WORKDesign
D020924 P.S. 222 - BROOKLYN PLAYGROUNDS
P.S. 222 - BROOKLYN 22RESO A PLAYGROUND UPGRADE$500K - $750K2024/01PLAYGROUNDSDesign
D022109 P.S. 222 - BROOKLYN ELECTRICAL
P.S. 222 - BROOKLYN 22IPDVS CAMERA INSTALLATION$0 - $250K2024/01ELECTRICALDesign
D019402 P.S. 224 - BROOKLYN EXT. WORK
P.S. 224 - BROOKLYN 19EXTERIOR MASONRY$4M OVER2023/11EXT. WORKDesign
P.S. 224 - BROOKLYN 19PARAPETS$4M OVER2023/11EXT. WORKDesign
P.S. 224 - BROOKLYN 19FLOOD ELIMINATION$4M OVER2023/11EXT. WORKDesign
P.S. 224 - BROOKLYN 19ROOFS$4M OVER2023/11EXT. WORKDesign
P.S. 224 - BROOKLYN 19AIR CONDENSING UNIT$4M OVER2023/11BUILDING SYSTEMSDesign
D021818 P.S. 229 - BROOKLYN LIBRARY UPGRADES
P.S. 229 - BROOKLYN 20RESO A LIBRARY UPGRADE$500K - $750K2023/11LIBRARY UPGRADESDesign
D019244 P.S. 235 - BROOKLYN BUILDING SYSTEMS
P.S. 235 - BROOKLYN 18REPLACE (3) ROOF TOP UNITS$1M - $4M2023/11BUILDING SYSTEMSDesign
P.S. 235 - BROOKLYN 18ROOFS$1M - $4M2023/11EXT. WORKDesign
D021876 P.S. 24 - BROOKLYN PLAYGROUNDS
P.S. 24 - BROOKLYN 15RESO A PLAYGROUND UPGRADE$500K - $750K2024/05PLAYGROUNDSScope
D022095 P.S. 24 - BROOKLYN ELECTRICAL
P.S. 24 - BROOKLYN 15IPDVS CAMERA INSTALLATION$0 - $250K2023/12ELECTRICALDesign
D021788 P.S. 251 - BROOKLYN LIBRARY UPGRADES
P.S. 251 - BROOKLYN 22RESO A (MA) LIBRARY UPGRADE$500K - $750K2023/11LIBRARY UPGRADESDesign
D021977 P.S. 251 - BROOKLYN ACCESSIBILITY
P.S. 251 - BROOKLYN 22PATH OF TRAVEL RESO A LIBRARY UPGRADE$0 - $250K2023/11ACCESSIBILITYDesign
D020446 P.S. 253 - BROOKLYN MISCELLANEOUS
P.S. 253 - BROOKLYN 21EXISTING BUILDING RENOVATION WORK$1M - $4M2023/11MISCELLANEOUSDesign
D022110 P.S. 255 - BROOKLYN ELECTRICAL
P.S. 255 - BROOKLYN 22IPDVS CAMERA INSTALLATION$0 - $250K2024/01ELECTRICALDesign
D021740 P.S. 257 - BROOKLYN ACCESSIBILITY
P.S. 257 - BROOKLYN 14FULL PROGRAM ACCESSIBILITY$4M OVER2024/02ACCESSIBILITYDesign
P.S. 257 - BROOKLYN 14LOW VOLTAGE ELECTRICAL SYSTEMS$4M OVER2024/02ELECTRICALDesign
D022111 P.S. 257 - BROOKLYN ELECTRICAL
P.S. 257 - BROOKLYN 14IPDVS CAMERA INSTALLATION$0 - $250K2024/02ELECTRICALDesign
D018694 P.S. 261 - BROOKLYN EXT. WORK
P.S. 261 - BROOKLYN 15FLOOD ELIMINATION$4M OVER2023/11EXT. WORKDesign
P.S. 261 - BROOKLYN 15PARAPETS$4M OVER2023/11EXT. WORKDesign
P.S. 261 - BROOKLYN 15ROOFS$4M OVER2023/11EXT. WORKDesign
P.S. 261 - BROOKLYN 15PLAYGROUND REDEVELOPMENT$4M OVER2023/11PLAYGROUNDSDesign
D021685 P.S. 261 - BROOKLYN PLAYGROUNDS
P.S. 261 - BROOKLYN 15TCU REMOVAL/PLAYGROUND REDEVELOPMENT$1M - $4M2024/01PLAYGROUNDSDesign
D021744 P.S. 261 - BROOKLYN ACCESSIBILITY
P.S. 261 - BROOKLYN 15PATH OF TRAVEL TCU REMOVAL/PLAYGROUND REDEVELOPMENT$0 - $250K2023/12ACCESSIBILITYDesign
D021814 P.S. 262 - BROOKLYN PLAYGROUNDS
P.S. 262 - BROOKLYN 16RESO A PLAYGROUND UPGRADE$1M - $4M2024/02PLAYGROUNDSDesign
D021849 P.S. 264 - BROOKLYN AUDITORIUM UPGRADES
P.S. 264 - BROOKLYN 20RESO A AUDITORIUM UPGRADE$250K - $500K2023/12AUDITORIUM UPGRADESDesign
D021816 P.S. 272 - BROOKLYN LIBRARY UPGRADES
P.S. 272 - BROOKLYN 18RESO A MULTIMEDIA CENTER$500K - $750K2023/11LIBRARY UPGRADESDesign
D021978 P.S. 272 - BROOKLYN ACCESSIBILITY
P.S. 272 - BROOKLYN 18PATH OF TRAVEL RESO A MULTIMEDIA CENTER$0 - $250K2023/11ACCESSIBILITYDesign
D017767 P.S. 284 - BROOKLYN MISCELLANEOUS
P.S. 284 - BROOKLYN 23SWIMMING POOL$4M OVER2024/03MISCELLANEOUSDesign
D020190 P.S. 284 - BROOKLYN ACCESSIBILITY
P.S. 284 - BROOKLYN 23RESO A PATH OF TRAVEL PLAYGROUND UPGRADE$0 - $250K2023/11ACCESSIBILITYDesign
D020192 P.S. 284 - BROOKLYN PLAYGROUNDS
P.S. 284 - BROOKLYN 23RESO A PLAYGROUND UPGRADE$250K - $500K2023/11PLAYGROUNDSDesign
D021524 P.S. 284 - BROOKLYN EXT. WORK
P.S. 284 - BROOKLYN 23ROOFS$4M OVER2023/11EXT. WORKDesign
P.S. 284 - BROOKLYN 23PARAPETS$4M OVER2023/11EXT. WORKDesign
P.S. 284 - BROOKLYN 23EXTERIOR MASONRY$4M OVER2023/11EXT. WORKDesign
P.S. 284 - BROOKLYN 23WINDOWS$4M OVER2023/11EXT. WORKDesign
P.S. 284 - BROOKLYN 23EXTERIOR DOORS$4M OVER2023/11SCHOOL SAFETYDesign
P.S. 284 - BROOKLYN 23FLOOD ELIMINATION$4M OVER2023/11EXT. WORKDesign
D022060 P.S. 284 - BROOKLYN ACCESSIBILITY
P.S. 284 - BROOKLYN 23PATH OF TRAVEL SWIMMING POOL$0 - $250K2023/12ACCESSIBILITYDesign
D021504 P.S. 29 - BROOKLYN ACCESSIBILITY
P.S. 29 - BROOKLYN 15FULL PROGRAM ACCESSIBILITY$4M OVER2023/11ACCESSIBILITYDesign
P.S. 29 - BROOKLYN 15LOW VOLTAGE ELECTRICAL SYSTEMS$4M OVER2023/11ELECTRICALDesign
D022112 P.S. 297 - BROOKLYN ELECTRICAL
P.S. 297 - BROOKLYN 14IPDVS CAMERA INSTALLATION$0 - $250K2024/04ELECTRICALDesign
D022113 P.S. 298 - BROOKLYN ELECTRICAL
P.S. 298 - BROOKLYN 23IPDVS INSTALLATION$0 - $250K2024/01ELECTRICALDesign
D020647 P.S. 299 - BROOKLYN ACCESSIBILITY
P.S. 299 - BROOKLYN 32FULL PROGRAM ACCESSIBILITY$4M OVER2023/11ACCESSIBILITYDesign
P.S. 299 - BROOKLYN 32PA SYSTEM REPLACEMENT$4M OVER2023/11ELECTRICALDesign
P026364 P.S. 307 - BROOKLYN ELECTRICAL
P.S. 307 - BROOKLYN 13IPDVS CAMERA INSTALLATION$500K - $750K2023/11ELECTRICALDesign
P.S. 93 - BROOKLYN 13IPDVS NSTALLATION$500K - $750K2023/11ELECTRICALDesign
D021710 P.S. 308 - BROOKLYN PLAYGROUNDS
P.S. 308 - BROOKLYN 16PLAYGROUND UPGRADE$1M - $4M2024/01PLAYGROUNDSDesign
D019397 P.S. 31 - BROOKLYN ACCESSIBILITY
P.S. 31 - BROOKLYN 14FULL PROGRAM ACCESSIBILITY$4M OVER2023/11ACCESSIBILITYDesign
D021824 P.S. 312 - BROOKLYN LIBRARY UPGRADES
P.S. 312 - BROOKLYN 22RESO A LIBRARY UPGRADE$1M - $4M2024/01LIBRARY UPGRADESDesign
D021823 P.S. 316 - BROOKLYN AUDITORIUM UPGRADES
P.S. 316 - BROOKLYN 17RESO A AUDITORIUM UPGRADE$250K - $500K2024/01AUDITORIUM UPGRADESDesign
D022190 P.S. 327 - BROOKLYN EXT. WORK
P.S. 327 - BROOKLYN 23ROOFS$4M OVER2024/03EXT. WORKDesign
P.S. 327 - BROOKLYN 23PARAPETS$4M OVER2024/03EXT. WORKDesign
P.S. 327 - BROOKLYN 23EXTERIOR MASONRY$4M OVER2024/03EXT. WORKDesign
D021562 P.S. 329 - BROOKLYN EXT. WORK
P.S. 329 - BROOKLYN 21ROOFS$4M OVER2024/01EXT. WORKDesign
P.S. 329 - BROOKLYN 21PARAPETS$4M OVER2024/01EXT. WORKDesign
P.S. 329 - BROOKLYN 21EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
D022115 P.S. 346 - BROOKLYN ELECTRICAL
P.S. 346 - BROOKLYN 19IPDVS INSTALLATION$250K - $500K2024/04ELECTRICALDesign
D019250 P.S. 384 - BROOKLYN EXT. WORK
P.S. 384 - BROOKLYN 32ROOF REPLACEMENT$4M OVER2023/12EXT. WORKDesign
D020535 P.S. 45 - BROOKLYN ACCESSIBILITY
P.S. 45 - BROOKLYN 32FULL PROGRAM ACCESSIBILITY$4M OVER2023/11ACCESSIBILITYDesign
D020761 P.S. 45 - BROOKLYN EXT. WORK
P.S. 45 - BROOKLYN 32ROOFS$4M OVER2023/11EXT. WORKDesign
P.S. 45 - BROOKLYN 32EXTERIOR MASONRY$4M OVER2023/11EXT. WORKDesign
P.S. 45 - BROOKLYN 32ROOFTOP EXHAUST FAN REPLACEMENT$4M OVER2023/11BUILDING SYSTEMSDesign
D021753 P.S. 503 - BROOKLYN BUILDING SYSTEMS
P.S. 503 - BROOKLYN 20CHILLER REPLACEMENT$4M OVER2023/11BUILDING SYSTEMSDesign
P.S. 503 - BROOKLYN 20AHU REPLACEMENT$4M OVER2023/11BUILDING SYSTEMSDesign
P.S. 503 - BROOKLYN 20BMS UPGRADE$4M OVER2023/11BOILER/HEAT PUMPDesign
D019398 P.S. 54 - BROOKLYN ACCESSIBILITY
P.S. 54 - BROOKLYN 13FULL PROGRAM ACCESSIBILITY$4M OVER2023/11ACCESSIBILITYDesign
P.S. 54 - BROOKLYN 13FIRE ALARM REPLACEMENT$4M OVER2023/11ELECTRICALDesign
D021846 P.S. 6 - BROOKLYN AUDITORIUM UPGRADES
P.S. 6 - BROOKLYN 17RESO A AUDITORIUM UPGRADE$250K - $500K2023/12AUDITORIUM UPGRADESDesign
D021515 P.S. 67 - BROOKLYN ACCESSIBILITY
P.S. 67 - BROOKLYN 13FULL PROGRAM ACCESSIBILITY$4M OVER2024/01ACCESSIBILITYDesign
P.S. 67 - BROOKLYN 13PA SYSTEM REPLACEMENT$4M OVER2024/01ELECTRICALDesign
D022207 P.S. 705 - BROOKLYN WALK-IN REFRIGERATORS AND FREEZERS
P.S. 705 - BROOKLYN 17WALK-IN REFRIGERATORS AND FREEZERS$500K - $750K2024/03WALK-IN REFRIGERATORS AND FREEZERSDesign
D021827 P.S. 748 - BROOKLYN ELECTRICAL
P.S. 748 - BROOKLYN 20RESO A ELECTRICAL UPGRADE$0 - $250K2024/03ELECTRICALDesign
D022170 P.S. 748 - BROOKLYN EXT. WORK
P.S. 748 - BROOKLYN 20EXTERIOR MASONRY$1M - $4M2024/03EXT. WORKDesign
P.S. 748 - BROOKLYN 20PARAPETS$1M - $4M2024/03EXT. WORKDesign
D021821 P.S. 8 - BROOKLYN PLAYGROUNDS
P.S. 8 - BROOKLYN 13RESO A PLAYGROUND UPGRADE$250K - $500K2023/12PLAYGROUNDSDesign
D021568 P.S. 81 - BROOKLYN EXT. WORK
P.S. 81 - BROOKLYN 16ROOFS$1M - $4M2024/02EXT. WORKDesign
P.S. 81 - BROOKLYN 16PARAPETS$1M - $4M2024/02EXT. WORKDesign
P.S. 81 - BROOKLYN 16EXTERIOR MASONRY$1M - $4M2024/02EXT. WORKDesign
P.S. 81 - BROOKLYN 16FLOOD ELIMINATION$1M - $4M2024/02EXT. WORKDesign
D020645 P.S. 84 - BROOKLYN ACCESSIBILITY
P.S. 84 - BROOKLYN 14FULL PROGRAM ACCESSIBILITY$4M OVER2023/11ACCESSIBILITYDesign
D021556 P.S. 86 - BROOKLYN EXT. WORK
P.S. 86 - BROOKLYN 32ROOFS$1M - $4M2023/11EXT. WORKDesign
P.S. 86 - BROOKLYN 32EXTERIOR MASONRY$1M - $4M2023/11EXT. WORKDesign
P.S. 86 - BROOKLYN 32FLOOD ELIMINATION$1M - $4M2023/11EXT. WORKDesign
D020806 P.S. 90 - BROOKLYN EXT. WORK
P.S. 90 - BROOKLYN 21FLOOD ELIMINATION$4M OVER2023/12EXT. WORKDesign
P.S. 90 - BROOKLYN 21ROOFS$4M OVER2023/12EXT. WORKDesign
P.S. 90 - BROOKLYN 21PARAPETS$4M OVER2023/12EXT. WORKDesign
P.S. 90 - BROOKLYN 21EXTERIOR MASONRY$4M OVER2023/12EXT. WORKDesign
D021142 P.S. 90 - BROOKLYN EXT. WORK
P.S. 90 - BROOKLYN 21RESO A ROOFTOP GARDEN$4M OVER2023/12EXT. WORKDesign
D021114 P.S. 94 - BROOKLYN BUILDING SYSTEMS
P.S. 94 - BROOKLYN 15VENTILATION$4M OVER2023/11BUILDING SYSTEMSDesign
P.S. 94 - BROOKLYN 15FIRE ALARM SYSTEM REPLACEMENT$4M OVER2023/11ELECTRICALDesign
P.S. 94 - BROOKLYN 15BMS UPGRADE$4M OVER2023/11BOILER/HEAT PUMPDesign
D017779 P.S. 97 - BROOKLYN BOILER/HEAT PUMP
P.S. 97 - BROOKLYN 21PLANYC BOILER CONVERSION$4M OVER2023/11BOILER/HEAT PUMPDesign
D018260 P.S. 97 - BROOKLYN BOILER/HEAT PUMP
P.S. 97 - BROOKLYN 21PLANYC CLIMATE CONTROL$1M - $4M2023/11BOILER/HEAT PUMPDesign
D022045 R. CARSON SCL OF COASTAL ST-K ROOM CONVERSIONS/UPGRADES
R. CARSON SCL OF COASTAL ST-K 21RESO A ROOM CONVERSIONS / PARTITIONING$500K - $750K2024/02ROOM CONVERSIONS/UPGRADESDesign
D022272 R. CARSON SCL OF COASTAL ST-K ACCESSIBILITY
R. CARSON SCL OF COASTAL ST-K 21PATH OF TRAVEL RESO A ROOM CONVERSIONS/PARTITIONING$0 - $250K2024/02ACCESSIBILITYDesign
D021842 RIVERDALE AVENUE MIDDLE SCHOOL AUDITORIUM UPGRADES
RIVERDALE AVENUE MIDDLE SCHOOL 23RESO A AUDITORIUM UPGRADE$500K - $750K2024/01AUDITORIUM UPGRADESDesign
D021971 RIVERDALE AVENUE MIDDLE SCHOOL ACCESSIBILITY
RIVERDALE AVENUE MIDDLE SCHOOL 23PATH OF TRAVEL RESO A AUDITORIUM UPGRADE$0 - $250K2023/12ACCESSIBILITYDesign
D021754 THE URBAN ASSEMBLY SCHOOL FOR COLLABORATIVE HEALTHCARE ACCESSIBILITY
THE URBAN ASSEMBLY SCHOOL FOR COLLABORATIVE HEALTHCARE 19ACCESSIBLE RAMP$1M - $4M2024/01ACCESSIBILITYDesign
D020777 URBAN STRATEGIES DAY CARE CENTER SITE 1 LEASES
URBAN STRATEGIES DAY CARE CENTER SITE 1 19ACS EARLY LEARN LEASE IMPROVEMENT$500K - $750K2023/12LEASESDesign
D022175 URBAN STRATEGIES DAY CARE CENTER SITE 1 ACCESSIBILITY
URBAN STRATEGIES DAY CARE CENTER SITE 1 19PATH OF TRAVEL$0 - $250K2024/01ACCESSIBILITYDesign
D021555 WHITELAW REID ACADEMY OF ARTS AND BUSINESS - BROOKLYN EXT. WORK
WHITELAW REID ACADEMY OF ARTS AND BUSINESS - BROOKLYN 16PARAPETS$4M OVER2024/01EXT. WORKDesign
WHITELAW REID ACADEMY OF ARTS AND BUSINESS - BROOKLYN 16EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
WHITELAW REID ACADEMY OF ARTS AND BUSINESS - BROOKLYN 16WINDOWS$4M OVER2024/01EXT. WORKDesign
WHITELAW REID ACADEMY OF ARTS AND BUSINESS - BROOKLYN 16PAVED AREAS- CONCRETE$4M OVER2024/01SITEDesign
D020890 WIILIAMSBURG PREP- BROOKLYN ELECTRICAL
WIILIAMSBURG PREP- BROOKLYN 14FIRE ALARM SYSTEM$1M - $4M2023/11ELECTRICALDesign
MANHATTAN
D019803 BERGTRAUM HS - MANHATTAN ATHLETIC FIELDS
BERGTRAUM HS - MANHATTAN 02ATHLETIC FIELD UPGRADE$4M OVER2023/12ATHLETIC FIELDSDesign
D021209 CENTRAL PARK EAST HS - MANHATTAN PLAYGROUNDS
CENTRAL PARK EAST HS - MANHATTAN 04NON-IDA PLAYGROUND UPGRADE$4M OVER2024/02PLAYGROUNDSDesign
P.S. 497 - MANHATTAN 04IDA FLOOD ELIMINATION$4M OVER2024/02EXT. WORKDesign
P.S. 497 - MANHATTAN 04IDA ELECTRICAL UPGRADE$4M OVER2024/02ELECTRICALDesign
P.S. 497 - MANHATTAN 04IDA ROOFS$4M OVER2024/02EXT. WORKDesign
P.S. 497 - MANHATTAN 04IDA HEATING PLANT UPGRADE$4M OVER2024/02BOILER/HEAT PUMPDesign
P.S. 497 - MANHATTAN 04IDA INTERIOR SPACES$4M OVER2024/02INTERIORDesign
D021519 EAST SIDE COMMUNITY SCHOOL BUILDING SYSTEMS
EAST SIDE COMMUNITY SCHOOL 01VENTILATION$4M OVER2023/11BUILDING SYSTEMSDesign
EAST SIDE COMMUNITY SCHOOL 01FIRE ALARM SYSTEM REPLACEMENT$4M OVER2023/11ELECTRICALDesign
D022161 FIORELLO LAGUARDIA HS - MANHATTAN INTERIOR
FIORELLO LAGUARDIA HS - MANHATTAN 03STAIRWELL WALLS$1M - $4M2024/03INTERIORDesign
D021715 FREDERICK DOUGLAS ACADEMY - M EXT. WORK
FREDERICK DOUGLAS ACADEMY - M 05ROOF LEAK$4M OVER2023/12EXT. WORKDesign
FREDERICK DOUGLAS ACADEMY - M 05EXTERIOR MASONRY$4M OVER2023/12EXT. WORKDesign
FREDERICK DOUGLAS ACADEMY - M 05WINDOWS$4M OVER2023/12EXT. WORKDesign
D021880 HAMILTON GRANGE MIDDLE SCHOOL AUDITORIUM UPGRADES
HAMILTON GRANGE MIDDLE SCHOOL 06RESO A AUDITORIUM UPGRADE$250K - $500K2024/01AUDITORIUM UPGRADESDesign
P026117 I.S. 104 - MANHATTAN GYMNASIUM
I.S. 104 - MANHATTAN 02RESO A (MA) FITNESS ROOM$750K - $1M2023/11GYMNASIUMDesign
I.S. 104 - MANHATTAN 02PATH OF TRAVEL RESO A FITNESS ROOM$750K - $1M2023/11ACCESSIBILITYDesign
D021908 I.S. 324 - MANHATTAN WALK-IN REFRIGERATORS AND FREEZERS
I.S. 324 - MANHATTAN 06WALK-IN REFRIGERATORS AND FREEZERS$500K - $750K2023/11WALK-IN REFRIGERATORS AND FREEZERSDesign
D021603 I.S. 328 - MANHATTAN EXT. WORK
I.S. 328 - MANHATTAN 06ROOFS$4M OVER2023/11EXT. WORKDesign
I.S. 328 - MANHATTAN 06PARAPETS$4M OVER2023/11EXT. WORKDesign
I.S. 328 - MANHATTAN 06EXTERIOR MASONRY$4M OVER2023/11EXT. WORKDesign
D021687 I.S. 328 - MANHATTAN SCIENCE LAB UPGRADES
I.S. 328 - MANHATTAN 06SCIENCE LAB UPGRADES$1M - $4M2023/12SCIENCE LAB UPGRADESDesign
D021900 I.S. 328 - MANHATTAN ACCESSIBILITY
I.S. 328 - MANHATTAN 06PATH OF TRAVEL SCIENCE LAB UPGRADE$0 - $250K2024/02ACCESSIBILITYDesign
D021636 I.S. 528 - MANHATTAN PLAYGROUNDS
I.S. 528 - MANHATTAN 06RESO A PLAYGROUND UPGRADE$500K - $750K2023/11PLAYGROUNDSDesign
D021858 I.S. 896 - MANHATTAN LIBRARY UPGRADES
I.S. 896 - MANHATTAN 02RESO A LIBRARY UPGRADE$250K - $500K2024/01LIBRARY UPGRADESDesign
D021936 I.S. 896 - MANHATTAN ACCESSIBILITY
I.S. 896 - MANHATTAN 02PATH OF TRAVEL RESO A LIBRARY UPGRADE$0 - $250K2024/02ACCESSIBILITYDesign
D018801 J. K. ONASSIS HS FOR INT CAREERS-M EXT. WORK
J. K. ONASSIS HS FOR INT CAREERS-M 02FLOOD ELIMINATION$4M OVER2023/11EXT. WORKDesign
J. K. ONASSIS HS FOR INT CAREERS-M 02PARAPETS$4M OVER2023/11EXT. WORKDesign
J. K. ONASSIS HS FOR INT CAREERS-M 02EXTERIOR MASONRY$4M OVER2023/11EXT. WORKDesign
J. K. ONASSIS HS FOR INT CAREERS-M 02ROOFS$4M OVER2023/11EXT. WORKDesign
J. K. ONASSIS HS FOR INT CAREERS-M 02WINDOWS$4M OVER2023/11EXT. WORKDesign
D020709 J.H.S. 292 - MANHATTAN ELECTRICAL
J.H.S. 292 - MANHATTAN 01LOW-VOLTAGE ELECTRICAL SYSTEM$1M - $4M2023/11ELECTRICALDesign
D017131 MURRAY HILL ACADEMY HS - M EXT. WORK
MURRAY HILL ACADEMY HS - M 02EXTERIOR MASONRY$4M OVER2023/11EXT. WORKDesign
MURRAY HILL ACADEMY HS - M 02FLOOD ELIMINATION$4M OVER2023/11EXT. WORKDesign
MURRAY HILL ACADEMY HS - M 02ROOFS$4M OVER2023/11EXT. WORKDesign
MURRAY HILL ACADEMY HS - M 02PARAPETS$4M OVER2023/11EXT. WORKDesign
MURRAY HILL ACADEMY HS - M 02WINDOWS$4M OVER2023/11EXT. WORKDesign
D021781 NEW DESIGN MIDDLE SCHOOL - MANHATTAN WALK-IN REFRIGERATORS AND FREEZERS
NEW DESIGN MIDDLE SCHOOL - MANHATTAN 05WALK-IN REFRIGERATORS AND FREEZERS$250K - $500K2023/11WALK-IN REFRIGERATORS AND FREEZERSDesign
D019271 NEW YORK HARBOR SCHOOL - MANHATTAN BUILDING SYSTEMS
NEW YORK HARBOR SCHOOL - MANHATTAN 02STRUCTURAL ISSUES$750K - $1M2023/11BUILDING SYSTEMSDesign
D022024 NEW YORK HARBOR SCHOOL - MANHATTAN ELECTRICAL
NEW YORK HARBOR SCHOOL - MANHATTAN 02IPDVS UPGRADE- EXISTING BUILDING$0 - $250K2023/12ELECTRICALDesign
D021643 NYC LAB MIDDLE SCHOOL - MANHATTAN GYMNASIUM
NYC LAB MIDDLE SCHOOL - MANHATTAN 02RESO A LOCKER ROOM UPGRADE$1M - $4M2024/05GYMNASIUMScope
D022213 P.S. 108 - MANHATTAN WALK-IN REFRIGERATORS AND FREEZERS
P.S. 108 - MANHATTAN 04WALK-IN REFRIGERATORS AND FREEZERS$250K - $500K2024/03WALK-IN REFRIGERATORS AND FREEZERSDesign
D022280 P.S. 11 - MANHATTAN PLAYGROUNDS
P.S. 11 - MANHATTAN 02RESO A PLAYGROUND UPGRADE$250K - $500K2024/05PLAYGROUNDSScope
D020990 P.S. 110 - MANHATTAN EXT. WORK
P.S. 110 - MANHATTAN 01FACADE REMEDIATION @M110$4M OVER2023/11EXT. WORKDesign
P.S. 110 - MANHATTAN 01PARAPETS$4M OVER2023/11EXT. WORKDesign
P.S. 110 - MANHATTAN 01ROOFS$4M OVER2023/11EXT. WORKDesign
P.S. 110 - MANHATTAN 01FLOOD ELIMINATION$4M OVER2023/11EXT. WORKDesign
D022123 P.S. 111 - MANHATTAN ELECTRICAL
P.S. 111 - MANHATTAN 02IPDVS CAMERA INSTALLATION$250K - $500K2024/02ELECTRICALDesign
D020321 P.S. 115 - MANHATTAN EXT. WORK
P.S. 115 - MANHATTAN 06FLOOD ELIMINATION$4M OVER2023/11EXT. WORKDesign
P.S. 115 - MANHATTAN 06PARAPETS$4M OVER2023/11EXT. WORKDesign
P.S. 115 - MANHATTAN 06EXTERIOR MASONRY$4M OVER2023/11EXT. WORKDesign
P.S. 115 - MANHATTAN 06WINDOWS$4M OVER2023/11EXT. WORKDesign
P.S. 115 - MANHATTAN 06ELECTRICAL UPGRADE$4M OVER2023/11ELECTRICALDesign
D021307 P.S. 116 - MANHATTAN PLAYGROUNDS
P.S. 116 - MANHATTAN 02RESO A PLAYGROUND UPGRADE$500K - $750K2024/04PLAYGROUNDSDesign
D021183 P.S. 124 - MANHATTAN PLAYGROUNDS
P.S. 124 - MANHATTAN 02RESO A PLAYGROUND UPGRADE$0 - $250K2024/01PLAYGROUNDSDesign
D021903 P.S. 125 - MANHATTAN ROOM CONVERSIONS/UPGRADES
P.S. 125 - MANHATTAN 05RESO A CAFETERIA UPGRADE$250K - $500K2024/01ROOM CONVERSIONS/UPGRADESDesign
D021904 P.S. 125 - MANHATTAN MISCELLANEOUS
P.S. 125 - MANHATTAN 05RESO A POOL UPGRADE$4M OVER2024/04MISCELLANEOUSDesign
D021972 P.S. 125 - MANHATTAN ACCESSIBILITY
P.S. 125 - MANHATTAN 05PATH OF TRAVEL RESO A POOL UPGRADE$0 - $250K2024/02ACCESSIBILITYDesign
D022263 P.S. 128 - MANHATTAN ELECTRICAL
P.S. 128 - MANHATTAN 06RESO A IPDVS CAMERA INSTALLATION$0 - $250K2024/04ELECTRICALDesign
D022124 P.S. 133 - MANHATTAN ELECTRICAL
P.S. 133 - MANHATTAN 05IPDVS CAMERA INSTALLATION$0 - $250K2023/11ELECTRICALDesign
D021572 P.S. 146 - MANHATTAN EXT. WORK
P.S. 146 - MANHATTAN 04ROOFS$4M OVER2023/11EXT. WORKDesign
P.S. 146 - MANHATTAN 04EXTERIOR MASONRY$4M OVER2023/11EXT. WORKDesign
P.S. 146 - MANHATTAN 04FLOOD ELIMINATION$4M OVER2023/11EXT. WORKDesign
D022214 P.S. 152 - MANHATTAN WALK-IN REFRIGERATORS AND FREEZERS
P.S. 152 - MANHATTAN 06WALK-IN REFRIGERATORS AND FREEZERS$250K - $500K2024/03WALK-IN REFRIGERATORS AND FREEZERSDesign
D021647 P.S. 154 - MANHATTAN ELECTRICAL
P.S. 154 - MANHATTAN 05FIRE ALARM SYSTEM REPLACEMENT$750K - $1M2023/11ELECTRICALDesign
D020677 P.S. 165 - MANHATTAN AUDITORIUM UPGRADES
P.S. 165 - MANHATTAN 03RESO A AUDITORIUM UPGRADE$1M - $4M2024/05AUDITORIUM UPGRADESScope
D021835 P.S. 165 - MANHATTAN GYMNASIUM
P.S. 165 - MANHATTAN 03RESO A GYMNASIUM UPGRADE$750K - $1M2024/03GYMNASIUMDesign
D021974 P.S. 187 - MANHATTAN ACCESSIBILITY
P.S. 187 - MANHATTAN 06PATH OF TRAVEL RESO A PLAYGROUND UPGRADE$0 - $250K2023/12ACCESSIBILITYDesign
D022119 P.S. 19 - MANHATTAN ELECTRICAL
P.S. 19 - MANHATTAN 01IPDVS CAMERA INSTALLATION$250K - $500K2023/12ELECTRICALDesign
D021741 P.S. 192 - MANHATTAN SITE
P.S. 192 - MANHATTAN 06OTHER TEMP STRUCTURE REMOVAL/PAVED AREA-CONCRETE$1M - $4M2023/12SITEDesign
P026133 P.S. 192 - MANHATTAN SITE
P.S. 192 - MANHATTAN 06PAVED AREAS - CONCRETE$1M - $4M2023/11SITEDesign
P.S. 192 - MANHATTAN 06EXTERIOR STAIRS$1M - $4M2023/11EXT. WORKDesign
D022129 P.S. 199 - MANHATTAN ELECTRICAL
P.S. 199 - MANHATTAN 03IPDVS CAMERA INSTALLATION$250K - $500K2024/01ELECTRICALDesign
D021796 P.S. 225 - MANHATTAN GYMNASIUM
P.S. 225 - MANHATTAN 02RESO A LOCKER ROOM UPGRADE$1M - $4M2023/12GYMNASIUMDesign
D021953 P.S. 225 - MANHATTAN ACCESSIBILITY
P.S. 225 - MANHATTAN 02PATH OF TRAVEL RESO A LOCKER ROOM UPGRADE$0 - $250K2023/12ACCESSIBILITYDesign
D022010 P.S. 28 - MANHATTAN EXT. WORK
P.S. 28 - MANHATTAN 06WATER INFILTRATION INTO ELECTRCIAL EQUIPMENT$1M - $4M2024/01EXT. WORKDesign
P.S. 28 - MANHATTAN 06FIRE ALARM SYSTEM REPLACEMENT$1M - $4M2024/01ELECTRICALDesign
D021655 P.S. 290 - MANHATTAN EXT. WORK
P.S. 290 - MANHATTAN 02RESO A ROOFTOP PLAYGROUND$4M OVER2023/11EXT. WORKDesign
P026376 P.S. 3 - MANHATTAN ELECTRICAL
P.S. 3 - MANHATTAN 02IPDVS CAMERA INSTALLATION$250K - $500K2023/11ELECTRICALDesign
P.S. 42 - MANHATTAN 02IPDVS CAMERA INSTALLATION$250K - $500K2023/11ELECTRICALDesign
D022215 P.S. 311 - MANHATTAN WALK-IN REFRIGERATORS AND FREEZERS
P.S. 311 - MANHATTAN 06WALK-IN REFRIGERATORS AND FREEZERS$250K - $500K2024/03WALK-IN REFRIGERATORS AND FREEZERSDesign
D019558 P.S. 333 - MANHATTAN ELECTRICAL
P.S. 333 - MANHATTAN 03RPZ BACKFLOW PREVENTION DEVICES$500K - $750K2023/11ELECTRICALDesign
D021766 P.S. 37 - MANHATTAN SITE
P.S. 37 - MANHATTAN 04SIDEWALK REPAIR$1M - $4M2023/12SITEDesign
D022068 P.S. 452 - MANHATTAN GYMNASIUM
P.S. 452 - MANHATTAN 03GYM CEILING RESTORATION- PERMANENT FIX$500K - $750K2024/01GYMNASIUMDesign
D022022 P.S. 46 - MANHATTAN PLAYGROUNDS
P.S. 46 - MANHATTAN 05OTHER TEMP STRUCTURE REMOVAL/PAVED AREA-CONCRETE$1M - $4M2024/02PLAYGROUNDSDesign
D017528 P.S. 48 - MANHATTAN ADMIN/CODE COMP
P.S. 48 - MANHATTAN 06CERTIFICATE OF OCCUPANCY$1M - $4M2023/11ADMIN/CODE COMPDesign
D021097 P.S. 48 - MANHATTAN ELECTRICAL
P.S. 48 - MANHATTAN 06FIRE ALARM$4M OVER2024/05ELECTRICALDesign
P.S. 48 - MANHATTAN 06ELECTRIFICATION/HEAT PUMP SYSTEMS$4M OVER2024/05BOILER ELECTRIFICATIONDesign
P.S. 48 - MANHATTAN 06WINDOWS$4M OVER2024/05EXT. WORKDesign
D021750 P.S. 497 - MANHATTAN ACCESSIBILITY
P.S. 497 - MANHATTAN 04PATH OF TRAVEL IDA FLOOD ELIMINATION$250K - $500K2024/02ACCESSIBILITYDesign
D019951 P.S. 64 - MANHATTAN PLAYGROUNDS
P.S. 64 - MANHATTAN 01RESO A PLAYGROUND UPGRADE$1M - $4M2023/12PLAYGROUNDSDesign
D020191 P.S. 64 - MANHATTAN ACCESSIBILITY
P.S. 64 - MANHATTAN 01RESO A PATH OF TRAVEL PLAYGROUND UPGRADE$0 - $250K2023/12ACCESSIBILITYDesign
D022121 P.S. 75 - MANHATTAN ELECTRICAL
P.S. 75 - MANHATTAN 03IPDVS CAMERA INSTALLATION$250K - $500K2024/01ELECTRICALDesign
D022122 P.S. 89 - MANHATTAN ELECTRICAL
P.S. 89 - MANHATTAN 02IPDVS CAMERA INSTALLATION$0 - $250K2024/02ELECTRICALDesign
D021751 P.S. 98 - MANHATTAN PLAYGROUNDS
P.S. 98 - MANHATTAN 06OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT:$1M - $4M2024/01PLAYGROUNDSDesign
D022054 P.S. 98 - MANHATTAN ACCESSIBILITY
P.S. 98 - MANHATTAN 06PATH OF TRAVEL-OTHER TEMP STRUCTURE REMOVAL$0 - $250K2023/12ACCESSIBILITYDesign
D021210 P.S./I.S. 276 - MANHATTAN INTERIOR
P.S./I.S. 276 - MANHATTAN 02IDA INTERIOR SPACES$750K - $1M2023/12INTERIORDesign
P.S./I.S. 276 - MANHATTAN 02IDA FLOOD ELIMINATION$750K - $1M2023/12EXT. WORKDesign
D020325 SCHOOL OF THE FUTURE - MANHATTAN EXT. WORK
SCHOOL OF THE FUTURE - MANHATTAN 02FLOOD ELIMINATION$1M - $4M2023/11EXT. WORKDesign
SCHOOL OF THE FUTURE - MANHATTAN 02WINDOWS$1M - $4M2023/11EXT. WORKDesign
SCHOOL OF THE FUTURE - MANHATTAN 02EXTERIOR MASONRY$1M - $4M2023/11EXT. WORKDesign
D020784 U.F.B.C.O. LEASES
U.F.B.C.O. 06ACS EARLY LEARN LEASE IMPROVEMENT$0 - $250K2024/04LEASESDesign
D021745 WADLEIGH SECONDARY SCHOOL FOR THE PERFORMING & VISUAL ARTS EXT. WORK
WADLEIGH SECONDARY SCHOOL FOR THE PERFORMING & VISUAL ARTS 03FLOOD ELIMINATION$1M - $4M2024/02EXT. WORKDesign
D022065 YOUNG WOMEN'S LEADERSHIP SCHOOL ELECTRICAL
YOUNG WOMEN'S LEADERSHIP SCHOOL 04IPDVS CAMERA INSTALLATION$0 - $250K2023/11ELECTRICALDesign
QUEENS
D021830 ACAD. OF MEDICAL TECHNOLOGY - Q ELECTRICAL
ACAD. OF MEDICAL TECHNOLOGY - Q 27RESO A ELECTRICAL UPGRADE$250K - $500K2024/05ELECTRICALScope
D021205 AVIATION HS - QUEENS EXT. WORK
AVIATION HS - QUEENS 24IDA FLOOD ELIMINATION$4M OVER2023/11EXT. WORKDesign
AVIATION HS - QUEENS 24IDA HEATING PLANT UPGRADE$4M OVER2023/11BOILER/HEAT PUMPDesign
AVIATION HS - QUEENS 24NON-IDA CLIMATE CONTROL$4M OVER2023/11BOILER/HEAT PUMPDesign
AVIATION HS - QUEENS 24IDA INTERIOR SPACES$4M OVER2023/11INTERIORDesign
D019607 BAYSIDE HIGH SCHOOL - QUEENS ROOM CONVERSIONS/UPGRADES
BAYSIDE HIGH SCHOOL - QUEENS 26RESO A ROOM CONVERSION$750K - $1M2023/11ROOM CONVERSIONS/UPGRADESDesign
D020024 BAYSIDE HIGH SCHOOL - QUEENS SCIENCE LAB UPGRADES
BAYSIDE HIGH SCHOOL - QUEENS 26RESO A GREENHOUSE$1M - $4M2024/02SCIENCE LAB UPGRADESDesign
D018886 BENJAMIN N. CARDOZO HS - QUEENS ELECTRICAL
BENJAMIN N. CARDOZO HS - QUEENS 26RPZ VALVES$500K - $750K2023/11ELECTRICALDesign
D021630 BUSINESS TECHNOLOGY EARLY COLLEGE HIGH SCHOOL ELECTRICAL
BUSINESS TECHNOLOGY EARLY COLLEGE HIGH SCHOOL 26LOW VOLTAGE ELECTRICAL SYSTEMS$4M OVER2024/01ELECTRICALDesign
MARTIN VAN BUREN HS - QUEENS 26FULL PROGRAM ACCESSIBILITY$4M OVER2024/01ACCESSIBILITYDesign
D019326 CHANNEL VIEW SCL FOR RESEARCH - Q SITE
CHANNEL VIEW SCL FOR RESEARCH - Q 27SEA WALL / BULKHEAD REPAIR$4M OVER2024/01SITEDesign
D020200 CHANNEL VIEW SCL FOR RESEARCH - Q GYMNASIUM
CHANNEL VIEW SCL FOR RESEARCH - Q 27RESO A WEIGHT ROOM$1M - $4M2024/02GYMNASIUMDesign
D021309 COLLEGE POINT COLLABORATIVE - QUEENS PLAYGROUNDS
COLLEGE POINT COLLABORATIVE - QUEENS 25RESO A PLAYGROUND UPGRADE$500K - $750K2023/12PLAYGROUNDSDesign
D022169 COLLEGE POINT COLLABORATIVE - QUEENS SCHOOL SAFETY
COLLEGE POINT COLLABORATIVE - QUEENS 25RESO A EXTERIOR DOOR$0 - $250K2024/03SCHOOL SAFETYDesign
D021658 DISTRICT 25 PRE-K CENTER ELECTRICAL
DISTRICT 25 PRE-K CENTER 25FIRE ALARM SYSTEM REPLACEMENT$1M - $4M2023/11ELECTRICALDesign
D021794 FLUSHING HS - QUEENS ATHLETIC FIELDS
FLUSHING HS - QUEENS 25RESO A ATHLETIC FIELD UPGRADE$4M OVER2024/03ATHLETIC FIELDSDesign
D021810 FLUSHING HS - QUEENS GYMNASIUM
FLUSHING HS - QUEENS 25RESO A GYMNASIUM UPGRADE$500K - $750K2024/05GYMNASIUMScope
D021872 FOREST HILLS HS - QUEENS AUDITORIUM UPGRADES
FOREST HILLS HS - QUEENS 28RESO A AUDITORIUM UPGRADE$1M - $4M2024/01AUDITORIUM UPGRADESDesign
D021266 FRANCIS LEWIS HS - QUEENS EXT. WORK
FRANCIS LEWIS HS - QUEENS 26IDA FLOOD ELIMINATION$4M OVER2023/11EXT. WORKDesign
FRANCIS LEWIS HS - QUEENS 26NON-IDA REINFORCE SUPPORT ELEMENTS$4M OVER2023/11BUILDING SYSTEMSDesign
FRANCIS LEWIS HS - QUEENS 26IDA HEATING PLANT UPGRADE$4M OVER2023/11BOILER/HEAT PUMPDesign
FRANCIS LEWIS HS - QUEENS 26IDA INTERIOR SPACES$4M OVER2023/11INTERIORDesign
D019994 HS FOR ARTS AND BUSINESS - QUEENS EXT. WORK
HS FOR ARTS AND BUSINESS - QUEENS 24EXTERIOR MASONRY$4M OVER2024/02EXT. WORKDesign
HS FOR ARTS AND BUSINESS - QUEENS 24PARAPETS$4M OVER2024/02EXT. WORKDesign
HS FOR ARTS AND BUSINESS - QUEENS 24ROOFS$4M OVER2024/02EXT. WORKDesign
HS FOR ARTS AND BUSINESS - QUEENS 24FLOOD ELIMINATION$4M OVER2024/02EXT. WORKDesign
D021241 I.S. 109 - QUEENS ELECTRICAL
I.S. 109 - QUEENS 29LOW VOLTAGE ELECTRICAL SYSTEM$1M - $4M2023/11ELECTRICALDesign
D021838 I.S. 119 - QUEENS ROOM CONVERSIONS/UPGRADES
I.S. 119 - QUEENS 24RESO A COMPUTER LAB UPGRADE$250K - $500K2024/02ROOM CONVERSIONS/UPGRADESDesign
D021837 I.S. 126 - QUEENS SCIENCE LAB UPGRADES
I.S. 126 - QUEENS 30RESO A SCIENCE LAB$500K - $750K2024/05SCIENCE LAB UPGRADESDesign
D020332 I.S. 202 - QUEENS EXT. WORK
I.S. 202 - QUEENS 27FLOOD ELIMINATION$4M OVER2023/11EXT. WORKDesign
I.S. 202 - QUEENS 27PARAPETS$4M OVER2023/11EXT. WORKDesign
I.S. 202 - QUEENS 27ROOFS$4M OVER2023/11EXT. WORKDesign
I.S. 202 - QUEENS 27EXTERIOR MASONRY$4M OVER2023/11EXT. WORKDesign
I.S. 202 - QUEENS 27SIDEWALK REPAIR$4M OVER2023/11SITEDesign
I.S. 202 - QUEENS 27WINDOWS$4M OVER2023/11EXT. WORKDesign
D022229 I.S. 202 - QUEENS WALK-IN REFRIGERATORS AND FREEZERS
I.S. 202 - QUEENS 27WALK-IN REFRIGERATORS AND FREEZERS$500K - $750K2024/03WALK-IN REFRIGERATORS AND FREEZERSDesign
D021008 I.S. 226 - QUEENS BUILDING SYSTEMS
I.S. 226 - QUEENS 27RTU REPLACEMENT$1M - $4M2023/11BUILDING SYSTEMSDesign
I.S. 226 - QUEENS 27ROOFS$1M - $4M2023/11EXT. WORKDesign
D020730 I.S. 294 - QUEENS AUDITORIUM UPGRADES
I.S. 294 - QUEENS 25RESO A AUDITORIUM UPGRADE$250K - $500K2023/11AUDITORIUM UPGRADESDesign
D021885 I.S. 5 - QUEENS PLAYGROUNDS
I.S. 5 - QUEENS 24RESO A PLAYGROUND UPGRADE$250K - $500K2023/11PLAYGROUNDSDesign
D022226 I.S. 53 - QUEENS WALK-IN REFRIGERATORS AND FREEZERS
I.S. 53 - QUEENS 27WALK-IN REFRIGERTAORS AND FREEZERS$500K - $750K2024/03WALK-IN REFRIGERATORS AND FREEZERSDesign
D021605 I.S. 59 - QUEENS EXT. WORK
I.S. 59 - QUEENS 29ROOFS$4M OVER2023/11EXT. WORKDesign
I.S. 59 - QUEENS 29PARAPETS$4M OVER2023/11EXT. WORKDesign
I.S. 59 - QUEENS 29EXTERIOR MASONRY$4M OVER2023/11EXT. WORKDesign
D019634 I.S. 73 - QUEENS ELECTRICAL
I.S. 73 - QUEENS 24SMOKE PURGE SYSTEM$750K - $1M2023/11ELECTRICALDesign
D021041 I.S. 74 - QUEENS EXT. WORK
I.S. 74 - QUEENS 26IDA FLOOD ELIMINATION$4M OVER2023/11EXT. WORKDesign
I.S. 74 - QUEENS 26IDA INTERIOR SPACES$4M OVER2023/11INTERIORDesign
I.S. 74 - QUEENS 26IDA DOMESTIC PIPING$4M OVER2023/11ELECTRICALDesign
I.S. 74 - QUEENS 26IDA ELECTRICAL SYSTEMS$4M OVER2023/11ELECTRICALDesign
I.S. 74 - QUEENS 26IDA CLIMATE CONTROL$4M OVER2023/11BOILER/HEAT PUMPDesign
D022025 J.H.S. 190 - QUEENS PLAYGROUNDS
J.H.S. 190 - QUEENS 28RESO A SCHOOLYARD UPGRADE$750K - $1M2024/02PLAYGROUNDSDesign
D021606 J.H.S. 67 - QUEENS EXT. WORK
J.H.S. 67 - QUEENS 26ROOFS$4M OVER2023/11EXT. WORKDesign
J.H.S. 67 - QUEENS 26PARAPETS$4M OVER2023/11EXT. WORKDesign
J.H.S. 67 - QUEENS 26EXTERIOR MASONRY$4M OVER2023/11EXT. WORKDesign
D022238 J.H.S. 72 - QUEENS BUILDING SYSTEMS
J.H.S. 72 - QUEENS 28RESO A SUPPLEMENTAL COOLING$1M - $4M2024/05BUILDING SYSTEMSScope
P026304 JAMAICA GATEWAY TO THE SCIENCES - Q SCIENCE LAB UPGRADES
JAMAICA GATEWAY TO THE SCIENCES - Q 28SCIENCE LAB UPGRADE$1M - $4M2023/11SCIENCE LAB UPGRADESDesign
QUEENS COLLEGIATE SCHOOL - QUEENS 28SCIENCE DEMO ROOM UPGRADES$1M - $4M2023/11SCIENCE LAB UPGRADESDesign
D021043 JOHN BOWNE HS - QUEENS EXT. WORK
JOHN BOWNE HS - QUEENS 25IDA FLOOD ELIMINATION$4M OVER2023/12EXT. WORKDesign
JOHN BOWNE HS - QUEENS 25IDA INTERIOR SPACES$4M OVER2023/12INTERIORDesign
D021471 JOHN BOWNE HS - QUEENS ACCESSIBILITY
JOHN BOWNE HS - QUEENS 25PATH OF TRAVEL IDA GYM FLOOR REPLACEMENT$0 - $250K2023/12ACCESSIBILITYDesign
D022256 JOHN BOWNE HS - QUEENS ACCESSIBILITY
JOHN BOWNE HS - QUEENS 25PATH OF TRAVEL IDA INTERIOR SPACES$0 - $250K2023/12ACCESSIBILITYDesign
D022273 JOHN BOWNE HS - QUEENS ELECTRICAL
JOHN BOWNE HS - QUEENS 25RPZ BACKFLOW PREVENTION DEVICES$1M - $4M2024/02ELECTRICALDesign
D022080 LONG ISLAND CITY HS - Q ELECTRICAL
LONG ISLAND CITY HS - Q 30PUBLIC ADDRESS SYSTEM REPLACEMENT$1M - $4M2024/02ELECTRICALDesign
D020346 M.S. 282 - QUEENS MISCELLANEOUS
M.S. 282 - QUEENS 27SWIMMING POOL$4M OVER2024/01MISCELLANEOUSDesign
D021182 NEWTOWN HS - QUEENS ROOM CONVERSIONS/UPGRADES
NEWTOWN HS - QUEENS 24RESO A CAFETERIA UPGRADE$250K - $500K2023/11ROOM CONVERSIONS/UPGRADESDesign
D022134 P.S. 107 - QUEENS ELECTRICAL
P.S. 107 - QUEENS 25IPDVS CAMERA INSTALLATION$0 - $250K2023/12ELECTRICALDesign
D021677 P.S. 110 - QUEENS ELECTRICAL
P.S. 110 - QUEENS 24RESO A IPDVS CAMERA INSTALLATION$0 - $250K2024/01ELECTRICALDesign
D021713 P.S. 116 - QUEENS MISCELLANEOUS
P.S. 116 - QUEENS 29EXISTING BUILDING-INTERIOR RENOVATION/PROGRAM ACCESSIBILITY$4M OVER2024/03MISCELLANEOUSDesign
D021608 P.S. 122 - QUEENS EXT. WORK
P.S. 122 - QUEENS 30ROOFS$4M OVER2023/12EXT. WORKDesign
P.S. 122 - QUEENS 30PARAPETS$4M OVER2023/12EXT. WORKDesign
P.S. 122 - QUEENS 30EXTERIOR MASONRY$4M OVER2023/12EXT. WORKDesign
P.S. 122 - QUEENS 30FLOOD ELIMINATION$4M OVER2023/12EXT. WORKDesign
D018395 P.S. 131 - QUEENS MISCELLANEOUS
P.S. 131 - QUEENS 29PHASE 4 EXISTING BUILDING WORK$500K - $750K2023/12MISCELLANEOUSDesign
D019982 P.S. 131 - QUEENS EXT. WORK
P.S. 131 - QUEENS 29WINDOWS$4M OVER2023/11EXT. WORKDesign
P.S. 131 - QUEENS 29EXTERIOR MASONRY$4M OVER2023/11EXT. WORKDesign
P.S. 131 - QUEENS 29FLOOD ELIMINATION$4M OVER2023/11EXT. WORKDesign
D021917 P.S. 131 - QUEENS SITE
P.S. 131 - QUEENS 29DRAINAGE$1M - $4M2024/01SITEDesign
D022254 P.S. 136 - QUEENS BOILER/HEAT PUMP
P.S. 136 - QUEENS 29LSP HOT WATER HEATER REPLACEMENT$250K - $500K2024/01BOILER/HEAT PUMPDesign
D021874 P.S. 14 - QUEENS ROOM CONVERSIONS/UPGRADES
P.S. 14 - QUEENS 24RESO A ROOM CONVERSION$0 - $250K2023/12ROOM CONVERSIONS/UPGRADESDesign
P026359 P.S. 14 - QUEENS ACCESSIBILITY
P.S. 14 - QUEENS 24RESO A PATH OF TRAVEL AUDITORIUM UPGRADE$500K - $750K2023/11ACCESSIBILITYDesign
P.S. 14 - QUEENS 24RESO A AUDITORIUM UPGRADE$500K - $750K2023/11AUDITORIUM UPGRADESDesign
D021609 P.S. 147 - QUEENS EXT. WORK
P.S. 147 - QUEENS 29ROOFS$4M OVER2023/12EXT. WORKDesign
P.S. 147 - QUEENS 29PARAPETS$4M OVER2023/12EXT. WORKDesign
P.S. 147 - QUEENS 29EXTERIOR MASONRY$4M OVER2023/12EXT. WORKDesign
D022249 P.S. 15 - QUEENS ELECTRICAL
P.S. 15 - QUEENS 29IPDVS CAMERA INSTALLATION$0 - $250K2024/03ELECTRICALDesign
D020851 P.S. 152 - QUEENS EXT. WORK
P.S. 152 - QUEENS 30ROOFS$4M OVER2023/11EXT. WORKDesign
P.S. 152 - QUEENS 30PARAPETS$4M OVER2023/11EXT. WORKDesign
P.S. 152 - QUEENS 30EXTERIOR MASONRY$4M OVER2023/11EXT. WORKDesign
P.S. 152 - QUEENS 30GYM WINDOWS$4M OVER2023/11EXT. WORKDesign
P.S. 152 - QUEENS 30RTU REPLACEMENT$4M OVER2023/11BUILDING SYSTEMSDesign
P.S. 152 - QUEENS 30FIRE ALARM REPLACEMENT$4M OVER2023/11ELECTRICALDesign
D021878 P.S. 156 - QUEENS ROOM CONVERSIONS/UPGRADES
P.S. 156 - QUEENS 29RESO A COMPUTER LAB UPGRADE$250K - $500K2023/12ROOM CONVERSIONS/UPGRADESDesign
D021925 P.S. 156 - QUEENS ACCESSIBILITY
P.S. 156 - QUEENS 29PATH OF TRAVEL RESO A COMPUTER LAB UPGRADE$0 - $250K2023/12ACCESSIBILITYDesign
D022063 P.S. 161 - QUEENS EXT. WORK
P.S. 161 - QUEENS 28WINDOWS$4M OVER2024/03EXT. WORKDesign
P.S. 161 - QUEENS 28PARAPETS$4M OVER2024/03EXT. WORKDesign
D020733 P.S. 162 - QUEENS PLAYGROUNDS
P.S. 162 - QUEENS 26PLAYGROUND REDEVELOPMENT$500K - $750K2024/03PLAYGROUNDSDesign
D022135 P.S. 165 - QUEENS ELECTRICAL
P.S. 165 - QUEENS 25IPDVS CAMERA INSTALLATION$0 - $250K2023/12ELECTRICALDesign
D021779 P.S. 169 - QUEENS BOILER ELECTRIFICATION
P.S. 169 - QUEENS 25ELECTRIFICATION/HEAT PUMP SYSTEMS$4M OVER2024/03BOILER ELECTRIFICATIONDesign
P.S. 169 - QUEENS 25ELECTRICAL UPGRADE$4M OVER2024/03ELECTRICALDesign
P.S. 169 - QUEENS 25WINDOWS$4M OVER2024/03EXT. WORKDesign
P.S. 169 - QUEENS 25ROOFS$4M OVER2024/03EXT. WORKDesign
P026367 P.S. 17 - QUEENS ELECTRICAL
P.S. 17 - QUEENS 30IPDVS CAMERA INSTALLATION$250K - $500K2023/11ELECTRICALDesign
P.S. 225 - QUEENS 27IPDVS CAMERA INSTALLATION$250K - $500K2023/11ELECTRICALDesign
D021020 P.S. 174 - QUEENS ELECTRICAL
P.S. 174 - QUEENS 28EXISTING BUILDING-PA/CLOCK SYSTEMS$1M - $4M2023/11ELECTRICALDesign
P.S. 174 - QUEENS 28EXISTING BUILDING-FIRE ALARM SYSTEM$1M - $4M2023/11ELECTRICALDesign
P.S. 174 - QUEENS 28EXISTING BUILDING- INTERIOR RENOVATIONS$1M - $4M2023/11MISCELLANEOUSDesign
P.S. 174 - QUEENS 28EXISTING BUILDING-AUDITORIUM$1M - $4M2023/11ACCESSIBILITYDesign
P.S. 174 - QUEENS 28EXISTING BUILDING-GYMNASIUM$1M - $4M2023/11ACCESSIBILITYDesign
D021610 P.S. 184 - QUEENS EXT. WORK
P.S. 184 - QUEENS 25ROOFS$4M OVER2024/02EXT. WORKDesign
P.S. 184 - QUEENS 25PARAPETS$4M OVER2024/02EXT. WORKDesign
P.S. 184 - QUEENS 25EXTERIOR MASONRY$4M OVER2024/02EXT. WORKDesign
D020067 P.S. 206 - QUEENS MISCELLANEOUS
P.S. 206 - QUEENS 28SSBA - EXISTING SCHOOL RENOVATION WORK$1M - $4M2023/11MISCELLANEOUSDesign
D021613 P.S. 206 - QUEENS EXT. WORK
P.S. 206 - QUEENS 28ROOFS$4M OVER2024/02EXT. WORKDesign
P.S. 206 - QUEENS 28PARAPETS$4M OVER2024/02EXT. WORKDesign
P.S. 206 - QUEENS 28EXTERIOR MASONRY$4M OVER2024/02EXT. WORKDesign
D021725 P.S. 206 - QUEENS PLAYGROUNDS
P.S. 206 - QUEENS 28SSBA - DEMOLITION OF TCU UNIT AND PLAYGROUND DEVELOPMENT$1M - $4M2023/12PLAYGROUNDSDesign
P026372 P.S. 207 - QUEENS LIBRARY UPGRADES
P.S. 207 - QUEENS 27RESO A LIBRARY UPGRADE$500K - $750K2023/11LIBRARY UPGRADESDesign
P.S. 207 - QUEENS 27PATH OF TRAVEL RESO A LIBRARY UPGRADE$500K - $750K2023/11ACCESSIBILITYDesign
D021575 P.S. 209 - QUEENS EXT. WORK
P.S. 209 - QUEENS 25ROOFS$4M OVER2024/01EXT. WORKDesign
P.S. 209 - QUEENS 25PARAPETS$4M OVER2024/01EXT. WORKDesign
P.S. 209 - QUEENS 25WINDOWS$4M OVER2024/01EXT. WORKDesign
P.S. 209 - QUEENS 25EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
D020344 P.S. 228 - QUEENS EXT. WORK
P.S. 228 - QUEENS 30PARAPETS$4M OVER2023/11EXT. WORKDesign
P.S. 228 - QUEENS 30ROOFS$4M OVER2023/11EXT. WORKDesign
P.S. 228 - QUEENS 30EXTERIOR MASONRY$4M OVER2023/11EXT. WORKDesign
D021583 P.S. 239 - QUEENS EXT. WORK
P.S. 239 - QUEENS 24EXTERIOR MASONRY$1M - $4M2023/11EXT. WORKDesign
D021866 P.S. 239 - QUEENS PLAYGROUNDS
P.S. 239 - QUEENS 24RESO A PLAYGROUND UPGRADE$250K - $500K2024/01PLAYGROUNDSDesign
D021198 P.S. 26 - QUEENS ACCESSIBILITY
P.S. 26 - QUEENS 26EXISTING BUILDING-GYMNASIUM$500K - $750K2023/11ACCESSIBILITYDesign
P.S. 26 - QUEENS 26EXISTING BUILDING-AUDITORIUM$500K - $750K2023/11ACCESSIBILITYDesign
D021264 P.S. 26 - QUEENS EXT. WORK
P.S. 26 - QUEENS 26IDA FLOOD ELIMINATION$1M - $4M2023/11EXT. WORKDesign
P.S. 26 - QUEENS 26IDA INTERIOR SPACES$1M - $4M2023/11INTERIORDesign
D021592 P.S. 268 - QUEENS EXT. WORK
P.S. 268 - QUEENS 29ROOFS$750K - $1M2024/02EXT. WORKDesign
P.S. 268 - QUEENS 29EXTERIOR MASONRY$750K - $1M2024/02EXT. WORKDesign
D020704 P.S. 32 - QUEENS OTHER
P.S. 32 - QUEENS 25EXISTING BUILDING WORK$4M OVER2023/11OTHERDesign
D021107 P.S. 40 - QUEENS EXT. WORK
P.S. 40 - QUEENS 28ROOF REPLACEMENT$4M OVER2023/11EXT. WORKDesign
D020447 P.S. 41 - QUEENS MISCELLANEOUS
P.S. 41 - QUEENS 26SSBA - WORK IN EXISTING BUILDING$1M - $4M2023/11MISCELLANEOUSDesign
D021893 P.S. 79 - QUEENS PLAYGROUNDS
P.S. 79 - QUEENS 25RESO A OUTDOOR CLASSROOM$250K - $500K2023/11PLAYGROUNDSDesign
D021847 P.S. 80 - QUEENS LIBRARY UPGRADES
P.S. 80 - QUEENS 28RESO A MULTIMEDIA CENTER$250K - $500K2023/12LIBRARY UPGRADESDesign
D019829 P.S. 84 - QUEENS BUILDING SYSTEMS
P.S. 84 - QUEENS 30STRUCTURAL REPAIRS$4M OVER2023/11BUILDING SYSTEMSDesign
D021573 P.S. 84 - QUEENS EXT. WORK
P.S. 84 - QUEENS 30ROOFS$4M OVER2023/12EXT. WORKDesign
P.S. 84 - QUEENS 30EXTERIOR MASONRY$4M OVER2023/12EXT. WORKDesign
P.S. 84 - QUEENS 30FLOOD ELIMINATION$4M OVER2023/12EXT. WORKDesign
P.S. 84 - QUEENS 30FIRE ALARM SYSTEM REPLACEMENT$4M OVER2023/12ELECTRICALDesign
P.S. 84 - QUEENS 30HVAC UPGRADES$4M OVER2023/12BUILDING SYSTEMSDesign
P.S. 84 - QUEENS 30WINDOWS$4M OVER2023/12EXT. WORKDesign
D021039 P.S. 87 - QUEENS EXT. WORK
P.S. 87 - QUEENS 24IDA FLOOD ELIMINATION$250K - $500K2023/11EXT. WORKDesign
P.S. 87 - QUEENS 24IDA INTERIOR SPACES$250K - $500K2023/11INTERIORDesign
D021870 P.S. 87 - QUEENS WALK-IN REFRIGERATORS AND FREEZERS
P.S. 87 - QUEENS 24RESO A KITCHEN UPGRADE$1M - $4M2024/01WALK-IN REFRIGERATORS AND FREEZERSDesign
D019337 P.S. 89 - QUEENS ELECTRICAL
P.S. 89 - QUEENS 24FIRE ALARM REPLACEMENT$4M OVER2023/11ELECTRICALDesign
P.S. 89 - QUEENS 24VENTILATION$4M OVER2023/11BUILDING SYSTEMSDesign
D021143 P.S. 92 - QUEENS PLAYGROUNDS
P.S. 92 - QUEENS 30PLAYGROUND UPGRADE$1M - $4M2024/01PLAYGROUNDSDesign
D021666 P.S. 95 - QUEENS MISCELLANEOUS
P.S. 95 - QUEENS 29EXISTING BUILDING-INTERIOR RENOVATION$1M - $4M2023/12MISCELLANEOUSDesign
D022245 Q811 SPED - QUEENS EXT. WORK
Q811 SPED - QUEENS 29ROOF REPLACEMENT$1M - $4M2023/12EXT. WORKDesign
D022146 QNS HS FOR INF. RESEARCH & TECH.-Q ROOM CONVERSIONS/UPGRADES
QNS HS FOR INF. RESEARCH & TECH.-Q 27RESO A RECORDING STUDIO$0 - $250K2024/05ROOM CONVERSIONS/UPGRADESScope
D022246 QNS HS OF TEACH., LIB. ARTS&SCI-Q MISCELLANEOUS
QNS HS OF TEACH., LIB. ARTS&SCI-Q 26UNION TPK BRIDGE OVER CROSS ISLAND PKWY IMPACT ON GLEN OAKS LIGHTING$250K - $500K2024/03MISCELLANEOUSDesign
D021854 QUEENS METROPOLITAN HIGH SCHOOL - QUEENS LIBRARY UPGRADES
QUEENS METROPOLITAN HIGH SCHOOL - QUEENS 28RESO A LIBRARY UPGRADE$250K - $500K2023/12LIBRARY UPGRADESDesign
D020736 THOMAS A. EDISON HS - Q SCIENCE LAB UPGRADES
THOMAS A. EDISON HS - Q 28PATH OF TRAVEL RESO A SCIENCE LAB UPGRADE$0 - $250K2024/02SCIENCE LAB UPGRADESDesign
D020961 THOMAS A. EDISON HS - Q SCIENCE LAB UPGRADES
THOMAS A. EDISON HS - Q 28RESO A SCIENCE LAB UPGRADE$750K - $1M2023/12SCIENCE LAB UPGRADESDesign
D020818 YOUNG WOMENS' LEADERSHIP SCHOOL - QUEENS EXT. WORK
YOUNG WOMENS' LEADERSHIP SCHOOL - QUEENS 28EXTERIOR MASONRY$1M - $4M2023/11EXT. WORKDesign
YOUNG WOMENS' LEADERSHIP SCHOOL - QUEENS 28ROOFS$1M - $4M2023/11EXT. WORKDesign
STATEN ISLAND
D021786 CONCORD HS - R ELECTRICAL
CONCORD HS - R 31RESO A ELECTRICAL UPGRADE$0 - $250K2024/03ELECTRICALDesign
D022227 I.S. 61 - STATEN ISLAND WALK-IN REFRIGERATORS AND FREEZERS
I.S. 61 - STATEN ISLAND 31WALK-IN REFRIGERATORS AND FREEZERS$500K - $750K2024/03WALK-IN REFRIGERATORS AND FREEZERSDesign
D021461 I.S. 72 - STATEN ISLAND EXT. WORK
I.S. 72 - STATEN ISLAND 31CONCRETE PARAPET WALL$4M OVER2023/11EXT. WORKDesign
I.S. 72 - STATEN ISLAND 31EXTERIOR MASONRY$4M OVER2023/11EXT. WORKDesign
I.S. 72 - STATEN ISLAND 31ROOFS$4M OVER2023/11EXT. WORKDesign
D020275 NEW DORP HS - STATEN ISLAND ATHLETIC FIELDS
NEW DORP HS - STATEN ISLAND 31RESO A FIELD UPGRADE$4M OVER2023/12ATHLETIC FIELDSDesign
D021853 P.S. 22 - STATEN ISLAND AUDITORIUM UPGRADES
P.S. 22 - STATEN ISLAND 31RESO A AUDITORIUM UPGRADE$250K - $500K2024/05AUDITORIUM UPGRADESScope
D021852 P.S. 23 - STATEN ISLAND GYMNASIUM
P.S. 23 - STATEN ISLAND 31RESO A GYMNASIUM UPGRADE$250K - $500K2024/01GYMNASIUMDesign
D021967 P.S. 23 - STATEN ISLAND ACCESSIBILITY
P.S. 23 - STATEN ISLAND 31PATH OF TRAVEL RESO A GYMNASIUM UPGRADE$0 - $250K2024/02ACCESSIBILITYDesign
D021702 P.S. 29 - STATEN ISLAND EXT. WORK
P.S. 29 - STATEN ISLAND 31EXTERIOR MASONRY$4M OVER2023/11EXT. WORKDesign
P.S. 29 - STATEN ISLAND 31PARAPETS$4M OVER2023/11EXT. WORKDesign
P.S. 29 - STATEN ISLAND 31ROOFS$4M OVER2023/11EXT. WORKDesign
D018509 P.S. 3 - STATEN ISLAND ADMIN/CODE COMP
P.S. 3 - STATEN ISLAND 31CERTIFICATE OF OCCUPANCY$1M - $4M2023/11ADMIN/CODE COMPDesign
D021191 P.S. 30 - STATEN ISLAND PLAYGROUNDS
P.S. 30 - STATEN ISLAND 31RESO A (MA) PLAYGROUND UPGRADE$250K - $500K2023/12PLAYGROUNDSDesign
D021618 P.S. 31 - STATEN ISLAND EXT. WORK
P.S. 31 - STATEN ISLAND 31ROOFS$4M OVER2024/01EXT. WORKDesign
P.S. 31 - STATEN ISLAND 31PARAPETS$4M OVER2024/01EXT. WORKDesign
P.S. 31 - STATEN ISLAND 31EXTERIOR MASONRY$4M OVER2024/01EXT. WORKDesign
D021480 P.S. 32 - STATEN ISLAND PLAYGROUNDS
P.S. 32 - STATEN ISLAND 31RESO A PLAYGROUND UPGRADE$500K - $750K2024/03PLAYGROUNDSDesign
D022288 P.S. 4 - STATEN ISLAND ELECTRICAL
P.S. 4 - STATEN ISLAND 31RESO A IPDVS UPGRADE$0 - $250K2024/04ELECTRICALDesign
D020892 P.S. 41 - STATEN ISLAND BOILER/HEAT PUMP
P.S. 41 - STATEN ISLAND 31PLANYC BOILER CONVERSION$4M OVER2023/12BOILER/HEAT PUMPDesign
P.S. 41 - STATEN ISLAND 31PLANYC CLIMATE CONTROL$4M OVER2023/12BOILER/HEAT PUMPDesign
D021597 P.S. 41 - STATEN ISLAND EXT. WORK
P.S. 41 - STATEN ISLAND 31ROOFS$4M OVER2023/12EXT. WORKDesign
P.S. 41 - STATEN ISLAND 31PARAPETS$4M OVER2023/12EXT. WORKDesign
P.S. 41 - STATEN ISLAND 31EXTERIOR MASONRY$4M OVER2023/12EXT. WORKDesign
P.S. 41 - STATEN ISLAND 31WINDOWS$4M OVER2023/12EXT. WORKDesign
D021716 P.S. 41 - STATEN ISLAND BOILER ELECTRIFICATION
P.S. 41 - STATEN ISLAND 31ELECTRIFICATION/HEAT PUMP SYSTEMS$4M OVER2023/11BOILER ELECTRIFICATIONDesign
P.S. 41 - STATEN ISLAND 31ELECTRICAL SERVICE UPGRADE$4M OVER2023/11ELECTRICALDesign
D018391 P.S. 42 - STATEN ISLAND PLAYGROUNDS
P.S. 42 - STATEN ISLAND 31RESO A PLAYGROUNDS$750K - $1M2023/11PLAYGROUNDSDesign
D020703 P.S. 5 - STATEN ISLAND OTHER
P.S. 5 - STATEN ISLAND 31EXISTING BUILDING WORK$1M - $4M2023/11OTHERDesign
P.S. 5 - STATEN ISLAND 31EXISTING BUILDING-AUD/GYM$1M - $4M2023/11ACCESSIBILITYDesign
D021689 P.S. 53 - STATEN ISLAND EXT. WORK
P.S. 53 - STATEN ISLAND 31FLOOD ELIMINATION$1M - $4M2023/12EXT. WORKDesign
D018009 P.S. 80 - STATEN ISLAND BUILDING SYSTEMS
P.S. 80 - STATEN ISLAND 31HVAC UPGRADES$4M OVER2023/11BUILDING SYSTEMSDesign
P.S. 80 - STATEN ISLAND 31EMERGENCY GENERATOR REPLACEMENT$4M OVER2023/11ELECTRICALDesign
P.S. 80 - STATEN ISLAND 31VENTILATION$4M OVER2023/11BUILDING SYSTEMSDesign
P.S. 80 - STATEN ISLAND 31BMS UPGRADE$4M OVER2023/11BOILER/HEAT PUMPDesign
D022228 P.S. 80 - STATEN ISLAND WALK-IN REFRIGERATORS AND FREEZERS
P.S. 80 - STATEN ISLAND 31WALK-IN REFRIGERATORS AND FREEZERS$750K - $1M2024/03WALK-IN REFRIGERATORS AND FREEZERSDesign
D022021 R000 - STATEN ISLAND PLAYGROUNDS
R000 - STATEN ISLAND 31OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT:$1M - $4M2023/12PLAYGROUNDSDesign
D021203 THE RICHMOND PRE-K CENTER EXT. WORK
THE RICHMOND PRE-K CENTER 31IDA FLOOD ELIMINATION$500K - $750K2023/11EXT. WORKDesign
THE RICHMOND PRE-K CENTER 31IDA INTERIOR SPACES$500K - $750K2023/11INTERIORDesign
D022275 THE RICHMOND PRE-K CENTER ACCESSIBILITY
THE RICHMOND PRE-K CENTER 31PATH OF TRAVEL IDA INTERIOR SPACES$0 - $250K2024/02ACCESSIBILITYDesign
D021214 TOTTENVILLE HS - STATEN ISLAND ATHLETIC FIELDS
TOTTENVILLE HS - STATEN ISLAND 31NEW FIELDHOUSE BUILDING$4M OVER2024/02ATHLETIC FIELDSDesign
D021218 TOTTENVILLE HS - STATEN ISLAND ACCESSIBILITY
TOTTENVILLE HS - STATEN ISLAND 31FULL PROGRAM ACCESSIBILITY$4M OVER2023/12ACCESSIBILITYDesign
TOTTENVILLE HS - STATEN ISLAND 31LOW VOLTAGE ELECTRICAL SYSTEMS$4M OVER2023/12ELECTRICALDesign
Xml: D022029 A SCHOOL WITHOUT WALLS BRONX 08 OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT $1M - $4M 2024/01 PLAYGROUNDS Design D022250 A SCHOOL WITHOUT WALLS BRONX 08 PATH OF TRAVEL-OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT $250K - $500K 2024/02 ACCESSIBILITY Design D021669 ALFRED E. SMITH HS - X BRONX 07 STRUCTURAL CONCRETE FAILURE @ X600 $750K - $1M 2023/11 EXT. WORK Design D022216 BRONX CNTR FOR SCIENCE & MATH - X BRONX 09 WALK-IN REFRIGERATORS AND FREEZERS $250K - $500K 2024/03 WALK-IN REFRIGERATORS AND FREEZERS Design D021848 BRONX HEALTH SCIENCES HS - X BRONX 11 RESO A CAFETERIA UPGRADE $500K - $750K 2024/01 ROOM CONVERSIONS/UPGRADES Design D021047 BRONX INTERNATIONAL - BRONX BRONX 09 TCU REMOVAL/PLAYGROUND REDEVELOPMENT $1M - $4M 2023/12 PLAYGROUNDS Design D021238 BRONX INTERNATIONAL - BRONX BRONX 09 PATH OF TRAVEL TCU REMOVAL/PLAYGROUND REDEVELOPMENT $0 - $250K 2023/12 ACCESSIBILITY Design D022072 BRONX INTERNATIONAL - BRONX BRONX 09 PATH OF TRAVEL SCIENCE LAB UPGRADES $0 - $250K 2024/01 ACCESSIBILITY Design D021042 BRONX LEADERSHIP ACADEMY II HS - BRONX BRONX 07 IDA INTERIOR SPACES $1M - $4M 2023/11 INTERIOR Design D021844 BRONX SCHOOL FOR LAW, GOVERNMENT AND JUSTICE BRONX 09 RESO A GYMNASIUM UPGRADE $250K - $500K 2023/12 GYMNASIUM Design D021826 CROTONA INTERNATIONAL HIGH SCHOOL - BRONX BRONX 10 RESO A PLAYGROUND UPGRADE $1M - $4M 2024/02 PLAYGROUNDS Design D021270 FAIRMONT NEIGHBORHOOD SCHOOL BRONX 12 EXTERIOR MASONRY $4M OVER 2023/11 EXT. WORK Design D021270 FAIRMONT NEIGHBORHOOD SCHOOL BRONX 12 ROOFS $4M OVER 2023/11 EXT. WORK Design D021270 FAIRMONT NEIGHBORHOOD SCHOOL BRONX 12 FLOOD ELIMINATION $4M OVER 2023/11 EXT. WORK Design D020065 FORDHAM HS FOR THE ARTS - BRONX BRONX 10 STRUCTURAL ELEMENTS UNDER POOL $4M OVER 2023/12 MISCELLANEOUS Design D021064 FORDHAM HS FOR THE ARTS - BRONX BRONX 10 PATH OF TRAVEL STRUCTURAL ELEMENTS UNDER POOL $1M - $4M 2023/12 ACCESSIBILITY Design D021604 GARDEN OF LEARNING AND DISCOVERY PRE-K CENTER BRONX 09 PARAPETS $1M - $4M 2024/03 EXT. WORK Design D021604 GARDEN OF LEARNING AND DISCOVERY PRE-K CENTER BRONX 09 WINDOWS $1M - $4M 2024/03 EXT. WORK Design D021604 GARDEN OF LEARNING AND DISCOVERY PRE-K CENTER BRONX 09 EXTERIOR MASONRY $1M - $4M 2024/03 EXT. WORK Design D021181 HARRY S. TRUMAN HS - X BRONX 11 PATH OF TRAVEL RESO A ATHLETIC FIELD $4M OVER 2024/02 ACCESSIBILITY Design D021181 HARRY S. TRUMAN HS - X BRONX 11 RESO A ATHLETIC FIELD UPGRADE $4M OVER 2024/02 ATHLETIC FIELDS Design D020591 HERBERT H. LEHMAN HS - X BRONX 08 VENTILATION @ X405 $4M OVER 2023/11 BUILDING SYSTEMS Design D018566 HOLCOMBE L. RUCKER SCHOOLOF COMMUNITY RESEARCH - BRONX BRONX 08 ELECTRIFICATION/HEAT PUMP SYSTEMS $4M OVER 2023/12 BOILER ELECTRIFICATION Design D021653 I.S. 118 - BRONX BRONX 10 OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT $1M - $4M 2024/04 PLAYGROUNDS Design D022033 I.S. 215 - BRONX BRONX 09 RESO A PLAYGROUND UPGRADE $250K - $500K 2024/05 PLAYGROUNDS Scope D021798 I.S. 303 - BRONX BRONX 09 RESO A LIBRARY UPGRADE $250K - $500K 2023/11 LIBRARY UPGRADES Design D022218 I.S. 339 - BRONX BRONX 09 WALK-IN REFRIGERATORS AND FREEZERS $250K - $500K 2024/03 WALK-IN REFRIGERATORS AND FREEZERS Design D021915 I.S. 390 - BRONX BRONX 10 FIRE ALARM SYSTEM REPLACEMENT $1M - $4M 2024/03 ELECTRICAL Design D021829 I.S. 391 - BRONX BRONX 10 RESO A PLAYGROUND UPGRADE $4M OVER 2024/01 PLAYGROUNDS Design P026375 I.S. 391 - BRONX BRONX 10 RESO A IPDVS CAMERA INSTALLATION $250K - $500K 2023/11 ELECTRICAL Design D021633 I.S. 424 - BRONX BRONX 08 RESO A AUDITORIUM UPGRADE $750K - $1M 2024/03 AUDITORIUM UPGRADES Design D021797 I.S. 562 - BRONX BRONX 08 RESO A AUDITORIUM UPGRADE $500K - $750K 2023/11 AUDITORIUM UPGRADES Design D021991 I.S. 562 - BRONX BRONX 08 PATH OF TRAVEL RESO A AUDITORIUM UPGRADE $0 - $250K 2023/11 ACCESSIBILITY Design D018566 LONGWOOD PREPARATORY ACADEMY BRONX 08 FIRE ALARM SYSTEM REPLACEMENT $4M OVER 2023/12 ELECTRICAL Design D018566 LONGWOOD PREPARATORY ACADEMY BRONX 08 ELECTRICAL SERVICE UPGRADE $4M OVER 2023/12 ELECTRICAL Design D020997 M.S. 363 - BRONX BRONX 10 SWIMMING POOL $1M - $4M 2023/11 MISCELLANEOUS Design D021085 M.S. 363 - BRONX BRONX 10 EXTERIOR MASONRY @ X115 $1M - $4M 2023/11 EXT. WORK Design D021085 M.S. 363 - BRONX BRONX 10 WINDOWS $1M - $4M 2023/11 EXT. WORK Design D022044 M.S. 363 - BRONX BRONX 10 GYM FLOOR REPLACEMENT $1M - $4M 2023/12 FLOORS Design D021476 M.S./H.S. 225 - BRONX BRONX 10 RESO A ROOM CONVERSION $750K - $1M 2024/01 ROOM CONVERSIONS/UPGRADES Design D022282 M.S./H.S. 225 - BRONX BRONX 10 PATH OF TRAVEL RESO A ROOM CONVERSION $0 - $250K 2024/03 ACCESSIBILITY Design D021474 M.S./H.S. 368 - BRONX BRONX 10 RESO A ATHLETIC FIELD UPGRADE $750K - $1M 2023/12 ATHLETIC FIELDS Design D021079 MORRIS COLLAB HS TECH & HUMAN - X BRONX 09 SCIENCE LAB UPGRADES $1M - $4M 2023/11 SCIENCE LAB UPGRADES Design D021454 P.S. 105 - BRONX BRONX 11 EXISTING BUILDING-AUDITORIUM $4M OVER 2024/04 ACCESSIBILITY Design D021454 P.S. 105 - BRONX BRONX 11 EXISTING BUILDING-INTERIOR RENOVATIONS $4M OVER 2024/04 MISCELLANEOUS Design D021454 P.S. 105 - BRONX BRONX 11 EXISTING BUILDING-IPDVS WORK $4M OVER 2024/04 ELECTRICAL Design D021454 P.S. 105 - BRONX BRONX 11 EXISTING BUILDING-FIRE ALARM WORK $4M OVER 2024/04 ELECTRICAL Design D021454 P.S. 105 - BRONX BRONX 11 EXISTING BUILDING-ELECTRICAL SYSTEMS $4M OVER 2024/04 ELECTRICAL Design D021454 P.S. 105 - BRONX BRONX 11 PARAPETS $4M OVER 2024/04 EXT. WORK Design D021454 P.S. 105 - BRONX BRONX 11 EXTERIOR MASONRY $4M OVER 2024/04 EXT. WORK Design D021660 P.S. 105 - BRONX BRONX 11 EXISTING BUILDING-GYMNASIUM $500K - $750K 2023/12 ACCESSIBILITY Design D021629 P.S. 107 - BRONX BRONX 08 EXTERIOR MASONRY $1M - $4M 2023/11 EXT. WORK Design D021629 P.S. 107 - BRONX BRONX 08 PARAPETS $1M - $4M 2023/11 EXT. WORK Design D021629 P.S. 107 - BRONX BRONX 08 ROOFS $1M - $4M 2023/11 EXT. WORK Design D021629 P.S. 107 - BRONX BRONX 08 FLOOD ELIMINATION $1M - $4M 2023/11 EXT. WORK Design D022217 P.S. 11 - BRONX BRONX 09 WALK-IN REFRIGERATORS AND FREEZERS $250K - $500K 2024/03 WALK-IN REFRIGERATORS AND FREEZERS Design D018712 P.S. 110 - BRONX BRONX 09 REPAIR RETAINING WALLS $1M - $4M 2023/11 EXT. WORK Design P026369 P.S. 110 - BRONX BRONX 09 IPDVS CAMERA INSTALLATION $250K - $500K 2023/11 ELECTRICAL Design D021889 P.S. 112 - BRONX BRONX 11 RESO A PLAYGROUND UPGRADE $1M - $4M 2024/05 PLAYGROUNDS Design P026369 P.S. 114 - BRONX BRONX 09 IPDVS CAMERA INSTALLATION $250K - $500K 2023/11 ELECTRICAL Design D021065 P.S. 126 - BRONX BRONX 09 FULL PROGRAM ACCESSIBILITY $4M OVER 2023/12 ACCESSIBILITY Design D021065 P.S. 126 - BRONX BRONX 09 LOW VOLTAGE ELECTRICAL SYSTEMS $4M OVER 2023/12 ELECTRICAL Design D020055 P.S. 138 - BRONX BRONX 08 PLANYC BOILER CONVERSION $4M OVER 2023/11 BOILER/HEAT PUMP Design D020056 P.S. 138 - BRONX BRONX 08 PLANYC CLIMATE CONTROL $1M - $4M 2023/12 BOILER/HEAT PUMP Design D021767 P.S. 138 - BRONX BRONX 08 EXISTING BUILDING-INTERIOR RENOVATIONS $1M - $4M 2024/05 MISCELLANEOUS Scope D022255 P.S. 15 - BRONX BRONX 10 RESO A GYMNASIUM UPGRADE $500K - $750K 2024/04 GYMNASIUM Scope D020239 P.S. 150 - BRONX BRONX 12 RESO A AUDITORIUM UPGRADE $750K - $1M 2023/11 AUDITORIUM UPGRADES Design D019502 P.S. 152 - BRONX BRONX 08 PARAPETS $4M OVER 2023/11 EXT. WORK Design D019502 P.S. 152 - BRONX BRONX 08 ROOFS $4M OVER 2023/11 EXT. WORK Design D019502 P.S. 152 - BRONX BRONX 08 EXTERIOR MASONRY $4M OVER 2023/11 EXT. WORK Design D019502 P.S. 152 - BRONX BRONX 08 CHILLER PLANT UPGRADE $4M OVER 2023/11 BUILDING SYSTEMS Design D019502 P.S. 152 - BRONX BRONX 08 FLOOD ELIMINATION $4M OVER 2023/11 EXT. WORK Design D020917 P.S. 154 - BRONX BRONX 07 RESO A AUDITORIUM UPGRADE $250K - $500K 2023/12 AUDITORIUM UPGRADES Design D021752 P.S. 195 - BRONX BRONX 12 OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT $1M - $4M 2024/01 PLAYGROUNDS Design D021073 P.S. 199 - BRONX BRONX 09 FULL PROGRAM ACCESSIBILITY $4M OVER 2024/01 ACCESSIBILITY Design D021619 P.S. 199 - BRONX BRONX 09 ROOFS $4M OVER 2024/03 EXT. WORK Design D021619 P.S. 199 - BRONX BRONX 09 PARAPETS $4M OVER 2024/03 EXT. WORK Design D021619 P.S. 199 - BRONX BRONX 09 EXTERIOR MASONRY $4M OVER 2024/03 EXT. WORK Design D021619 P.S. 199 - BRONX BRONX 09 WINDOWS $4M OVER 2024/03 EXT. WORK Design D021256 P.S. 20 - BRONX BRONX 10 HVAC AND BMS UPGRADE $4M OVER 2023/11 BOILER/HEAT PUMP Design D021256 P.S. 20 - BRONX BRONX 10 RTU REPLACEMENT $4M OVER 2023/11 BUILDING SYSTEMS Design D021256 P.S. 20 - BRONX BRONX 10 FIRE ALARM SYSTEM REPLACEMENT $4M OVER 2023/11 ELECTRICAL Design D022219 P.S. 214 - BRONX BRONX 12 WALK-IN REFRIGERATORS AND FREEZERS $250K - $500K 2024/03 WALK-IN REFRIGERATORS AND FREEZERS Design P026368 P.S. 23 - BRONX BRONX 10 IPDVS CAMERA INSTALLATION $250K - $500K 2023/11 ELECTRICAL Design D022139 P.S. 25 - BRONX BRONX 07 IPDVS CAMERA INSTALLATION $0 - $250K 2024/02 ELECTRICAL Design D021110 P.S. 279 - BRONX BRONX 10 PLAYGROUND UPGRADE $4M OVER 2024/02 PLAYGROUNDS Design D021654 P.S. 32 - BRONX BRONX 10 OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT: $1M - $4M 2024/05 PLAYGROUNDS Scope D021621 P.S. 54 - BRONX BRONX 10 PARAPETS $1M - $4M 2024/02 EXT. WORK Design D021621 P.S. 54 - BRONX BRONX 10 EXTERIOR MASONRY $1M - $4M 2024/02 EXT. WORK Design D021621 P.S. 54 - BRONX BRONX 10 ROOFS $1M - $4M 2024/02 EXT. WORK Design P026368 P.S. 54 - BRONX BRONX 10 RESO A IPDVS CAMERA INSTALLATION $250K - $500K 2023/11 ELECTRICAL Design D022140 P.S. 57 - BRONX BRONX 12 IPDVS CAMERA INSTALLATION $0 - $250K 2024/02 ELECTRICAL Design D020016 P.S. 67 - BRONX BRONX 12 KITCHEN ANSUL SYSTEM $500K - $750K 2023/11 SCHOOL SAFETY Design P026375 P.S. 68 - BRONX BRONX 11 IPDVS CAMERA INSTALLATION $250K - $500K 2023/11 ELECTRICAL Design D021648 P.S. 70 - BRONX BRONX 09 OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT $1M - $4M 2024/03 PLAYGROUNDS Design D021648 P.S. 70 - BRONX BRONX 09 PATH OF TRAVEL-OTHER TEMP STRUCTURE REMOVAL $1M - $4M 2024/03 ACCESSIBILITY Design D021272 P.S. 72 - BRONX BRONX 08 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design D021272 P.S. 72 - BRONX BRONX 08 WINDOWS $4M OVER 2024/01 EXT. WORK Design D021272 P.S. 72 - BRONX BRONX 08 PARAPETS $4M OVER 2024/01 EXT. WORK Design D022145 P.S. 73 - BRONX BRONX 09 OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT $1M - $4M 2024/05 PLAYGROUNDS Scope D022023 P.S. 85 - BRONX BRONX 10 OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT $4M OVER 2024/02 PLAYGROUNDS Design D022244 P.S. 85 - BRONX BRONX 10 PATH OF TRAVEL- OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDELOPMENT $0 - $250K 2024/01 ACCESSIBILITY Design D020893 P.S. 86 - BRONX BRONX 10 EXTERIOR WALLS $1M - $4M 2023/12 EXT. WORK Design D020893 P.S. 86 - BRONX BRONX 10 WINDOWS $1M - $4M 2023/12 EXT. WORK Design D020893 P.S. 86 - BRONX BRONX 10 ROOFS $1M - $4M 2023/12 EXT. WORK Design D021190 P.S. 91 - BRONX BRONX 10 RESO A PLAYGROUND UPGRADE $1M - $4M 2024/02 PLAYGROUNDS Design D021712 SCHOOL OF DIPLOMACY BRONX 11 AUDITORIUM UPGRADE $1M - $4M 2023/12 AUDITORIUM UPGRADES Design D022020 SCHOOL OF DIPLOMACY BRONX 11 PATH OF TRAVEL AUDITORIUM UPGRADE $250K - $500K 2023/11 ACCESSIBILITY Design P026325 SCHOOL OF DIPLOMACY BRONX 11 RESO A SCIENCE LAB UPGRADE $1M - $4M 2023/11 SCIENCE LAB UPGRADES Design P026325 SCHOOL OF DIPLOMACY BRONX 11 PATH OF TRAVEL RESO A SCIENCE LAB UPGRADE $1M - $4M 2023/11 ACCESSIBILITY Design D022057 THE WALTON AVENUE SCHOOL BRONX 09 TCU REMOVAL/PLAYGROUND REDEVELOPMENT $1M - $4M 2024/05 PLAYGROUNDS Scope D021042 X188 SPED - BRONX BRONX 07 IDA FLOOD ELIMINATION $1M - $4M 2023/11 EXT. WORK Design D021743 X721 SPED - BRONX BRONX 11 ROOF REPLACEMENT $1M - $4M 2024/05 EXT. WORK Scope D020782 200 CENTRAL AVENUE DAY CARE CENTER BROOKLYN 32 ACS EARLY LEARN LEASE RENEWAL $0 - $250K 2023/11 LEASES Design D022064 ABRAHAM LINCOLN HS - BROOKLYN BROOKLYN 21 ATHLETIC FIELD BLEACHERS C OF O $500K - $750K 2024/04 ADMIN/CODE COMP Design D022069 ACHIEVEMENT FIRST EAST NEW YORK CHARTER SCHOOL - K BROOKLYN 19 PERM FIX- EXTERIOR MASONRY @ K065 $4M OVER 2024/03 EXT. WORK Design D021756 BOYS & GIRLS HS - BROOKLYN BROOKLYN 16 GYM UPGRADE $1M - $4M 2023/12 GYMNASIUM Design D022055 BOYS & GIRLS HS - BROOKLYN BROOKLYN 16 PATH OF TRAVEL GYM UPGRADE $250K - $500K 2023/12 ACCESSIBILITY Design D022210 BROOKLYN ACADEMY HS - BROOKLYN BROOKLYN 13 WALK-IN REFRIGERATORS AND FREEZERS $750K - $1M 2024/03 WALK-IN REFRIGERATORS AND FREEZERS Design D022100 BROOKLYN LANDMARK ELEMENTARY SCHOOL BROOKLYN 23 IPDVS INSTALLATION $250K - $500K 2023/11 ELECTRICAL Design D021850 BROOKLYN SCIENCE AND ENGINEERING ACADEMY BROOKLYN 18 RESO A GYMNASIUM UPGRADE $1M - $4M 2023/12 GYMNASIUM Design D019572 CHRISTOPHER AVENUE COMMUNITY SCHOOL BROOKLYN 23 ROOFS $4M OVER 2023/11 EXT. WORK Design D019572 CHRISTOPHER AVENUE COMMUNITY SCHOOL BROOKLYN 23 PARAPETS $4M OVER 2023/11 EXT. WORK Design D019572 CHRISTOPHER AVENUE COMMUNITY SCHOOL BROOKLYN 23 EXTERIOR MASONRY $4M OVER 2023/11 EXT. WORK Design D019572 CHRISTOPHER AVENUE COMMUNITY SCHOOL BROOKLYN 23 ROOF TOP UNIT $4M OVER 2023/11 BUILDING SYSTEMS Design D019572 CHRISTOPHER AVENUE COMMUNITY SCHOOL BROOKLYN 23 PAVED AREAS- CONCRETE $4M OVER 2023/11 SITE Design D021584 COBBLE HILL SCHL OF AMER. STUD-K BROOKLYN 15 ROOFS $4M OVER 2023/11 EXT. WORK Design D021584 COBBLE HILL SCHL OF AMER. STUD-K BROOKLYN 15 PARAPETS $4M OVER 2023/11 EXT. WORK Design D021584 COBBLE HILL SCHL OF AMER. STUD-K BROOKLYN 15 EXTERIOR MASONRY $4M OVER 2023/11 EXT. WORK Design D021584 COBBLE HILL SCHL OF AMER. STUD-K BROOKLYN 15 FLOOD ELIMINATION $4M OVER 2023/11 EXT. WORK Design D020672 CULT ACAD ARTS AND SCI - BROOKLYN BROOKLYN 18 RESO A- CULINARY ARTS KITCHEN $1M - $4M 2024/02 ROOM CONVERSIONS/UPGRADES Design D021038 EDWARD R. MURROW HS - K BROOKLYN 21 IDA FLOOD ELIMINATION $1M - $4M 2023/11 EXT. WORK Design D021038 EDWARD R. MURROW HS - K BROOKLYN 21 IDA GYM PARTITION REPLACEMENT $1M - $4M 2023/11 GYMNASIUM Design P026371 FORT GREENE PREPARATORY ACADEMY - BROOKLYN BROOKLYN 13 IPDVS INSTALLATION $500K - $750K 2023/11 ELECTRICAL Design D019498 FORT HAMILTON HS - K BROOKLYN 20 REPLACE 6' FIRE DOMESTIC WATER MAIN VALVES $250K - $500K 2023/11 ELECTRICAL Design D021215 FORT HAMILTON HS - K BROOKLYN 20 IDA FLOOD ELIMINATION $4M OVER 2023/12 EXT. WORK Design D021215 FORT HAMILTON HS - K BROOKLYN 20 IDA HEATING PLANT UPGRADE $4M OVER 2023/12 BOILER/HEAT PUMP Design D021215 FORT HAMILTON HS - K BROOKLYN 20 IDA CLIMATE CONTROL $4M OVER 2023/12 BOILER/HEAT PUMP Design D021215 FORT HAMILTON HS - K BROOKLYN 20 NON-IDA CLIMATE CONTROL $4M OVER 2023/12 BOILER/HEAT PUMP Design D021215 FORT HAMILTON HS - K BROOKLYN 20 IDA INTERIOR SPACES $4M OVER 2023/12 INTERIOR Design D021215 FORT HAMILTON HS - K BROOKLYN 20 IDA POOL BOILER $4M OVER 2023/12 BOILER/HEAT PUMP Design D021215 FORT HAMILTON HS - K BROOKLYN 20 IDA ELECTRICAL SYSTEMS $4M OVER 2023/12 ELECTRICAL Design D021565 FRANKLIN D. ROOSEVELT HS - K BROOKLYN 20 ROOFS $4M OVER 2023/12 EXT. WORK Design D021565 FRANKLIN D. ROOSEVELT HS - K BROOKLYN 20 PARAPETS $4M OVER 2023/12 EXT. WORK Design D021565 FRANKLIN D. ROOSEVELT HS - K BROOKLYN 20 EXTERIOR MASONRY $4M OVER 2023/12 EXT. WORK Design D021565 FRANKLIN D. ROOSEVELT HS - K BROOKLYN 20 WINDOWS $4M OVER 2023/12 EXT. WORK Design D022340 HIGH SCHOOL FOR CIVIL RIGHTS - K BROOKLYN 19 EARLY DEMO PACKAGE $4M OVER 2024/02 ATHLETIC FIELDS Design D022031 HS FOR MEDICAL PROFESSIONS - K BROOKLYN 18 RESO A SCIENCE LAB UPGRADE $1M - $4M 2023/12 SCIENCE LAB UPGRADES Design D022040 HS FOR MEDICAL PROFESSIONS - K BROOKLYN 18 PATH OF TRAVEL RESO A SCIENCE LAB UPGRADE $0 - $250K 2023/12 ACCESSIBILITY Design D021738 I.S. 162 - BROOKLYN BROOKLYN 32 FULL PROGRAM ACCESSIBILITY $4M OVER 2024/03 ACCESSIBILITY Design D021817 I.S. 246 - BROOKLYN BROOKLYN 17 RESO A LIBRARY UPGRADE $500K - $750K 2023/11 LIBRARY UPGRADES Design D021976 I.S. 246 - BROOKLYN BROOKLYN 17 PATH OF TRAVEL RESO A LIBRARY UPGRADE $0 - $250K 2023/11 ACCESSIBILITY Design D021819 I.S. 259 - BROOKLYN BROOKLYN 20 RESO A SCIENCE LAB UPGRADE $750K - $1M 2023/11 SCIENCE LAB UPGRADES Design D021926 I.S. 259 - BROOKLYN BROOKLYN 20 PATH OF TRAVEL RESO A SCIENCE LAB UPGRADE $0 - $250K 2023/11 ACCESSIBILITY Design D021624 I.S. 281 - BROOKLYN BROOKLYN 21 EXTERIOR MASONRY $4M OVER 2024/02 EXT. WORK Design D021624 I.S. 281 - BROOKLYN BROOKLYN 21 WINDOWS $4M OVER 2024/02 EXT. WORK Design D021624 I.S. 281 - BROOKLYN BROOKLYN 21 ROOFS $4M OVER 2024/02 EXT. WORK Design D020169 I.S. 285 - BROOKLYN BROOKLYN 18 RESO A SCIENCE LAB UPGRADES $1M - $4M 2024/02 SCIENCE LAB UPGRADES Design D020170 I.S. 285 - BROOKLYN BROOKLYN 18 RESO A PATH OF TRAVEL SCIENCE LAB UPGRADES $0 - $250K 2024/02 ACCESSIBILITY Design D021062 I.S. 291 - BROOKLYN BROOKLYN 32 IDA FLOOD ELIMINATION $4M OVER 2023/11 EXT. WORK Design D021062 I.S. 291 - BROOKLYN BROOKLYN 32 IDA INTERIOR SPACES $4M OVER 2023/11 INTERIOR Design D021639 I.S. 291 - BROOKLYN BROOKLYN 32 PATH OF TRAVEL NON-IDA FLOOD ELIMINATION $0 - $250K 2023/11 ACCESSIBILITY Design D019438 I.S. 340 - BROOKLYN BROOKLYN 13 LOW VOLTAGE ELECTRICAL SYSTEMS $750K - $1M 2023/11 ELECTRICAL Design D018437 I.S. 351 - BROOKLYN BROOKLYN 13 RESO A COURTYARD GREENHOUSE $1M - $4M 2023/11 SCIENCE LAB UPGRADES Design D020638 I.S. 382 - BROOKLYN BROOKLYN 17 PARAPET AND SIDE OF BUILDING DAMAGE @ K465 $4M OVER 2023/11 EXT. WORK Design D020638 I.S. 382 - BROOKLYN BROOKLYN 17 EXTERIOR MASONRY $4M OVER 2023/11 EXT. WORK Design D020638 I.S. 382 - BROOKLYN BROOKLYN 17 ROOFS $4M OVER 2023/11 EXT. WORK Design D020638 I.S. 382 - BROOKLYN BROOKLYN 17 FLOOD ELIMINATION $4M OVER 2023/11 EXT. WORK Design D020638 I.S. 382 - BROOKLYN BROOKLYN 17 WINDOWS $4M OVER 2023/11 EXT. WORK Design D021857 I.S. 452 BROOKLYN 19 RESO A LIBRARY UPGRADE $500K - $750K 2023/12 LIBRARY UPGRADES Design D021935 I.S. 452 BROOKLYN 19 PATH OF TRAVEL RESO A LIBRARY UPGRADE $0 - $250K 2024/01 ACCESSIBILITY Design D021863 I.S. 518 - BROOKLYN BROOKLYN 23 RESO A AUDITORIUM UPGRADE $250K - $500K 2023/12 AUDITORIUM UPGRADES Design D022094 I.S. 577 - BROOKLYN BROOKLYN 14 IPDVS INSTALLATION $0 - $250K 2024/01 ELECTRICAL Design D018776 I.S. 61 - BROOKLYN BROOKLYN 17 ROOFS $4M OVER 2024/01 EXT. WORK Design D018776 I.S. 61 - BROOKLYN BROOKLYN 17 PARAPETS $4M OVER 2024/01 EXT. WORK Design D018776 I.S. 61 - BROOKLYN BROOKLYN 17 WINDOWS $4M OVER 2024/01 EXT. WORK Design D018776 I.S. 61 - BROOKLYN BROOKLYN 17 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design D018776 I.S. 61 - BROOKLYN BROOKLYN 17 DOORS $4M OVER 2024/01 SCHOOL SAFETY Design D018776 I.S. 61 - BROOKLYN BROOKLYN 17 SIDEWALK ELEVATOR $4M OVER 2024/01 BUILDING SYSTEMS Design D018776 I.S. 61 - BROOKLYN BROOKLYN 17 HVAC UPGRADE FOR CLASSROOMS AND PA SPACES $4M OVER 2024/01 BUILDING SYSTEMS Design D018776 I.S. 61 - BROOKLYN BROOKLYN 17 ELECTRICAL UPGRADE $4M OVER 2024/01 ELECTRICAL Design D018776 I.S. 61 - BROOKLYN BROOKLYN 17 HOT WATER HEATERS $4M OVER 2024/01 BOILER/HEAT PUMP Design D018776 I.S. 61 - BROOKLYN BROOKLYN 17 FIRE ALARM SYSTEM REPLACEMENT $4M OVER 2024/01 ELECTRICAL Design D022171 I.S. 722 - BROOKLYN BROOKLYN 17 CHILLER REPLACEMENT @ K391 $1M - $4M 2024/04 BUILDING SYSTEMS Design D022171 I.S. 722 - BROOKLYN BROOKLYN 17 FIRE ALARM SYSTEM $1M - $4M 2024/04 ELECTRICAL Design D021248 I.S. 78 - BROOKLYN BROOKLYN 22 PLANYC CLIMATE CONTROL $4M OVER 2023/11 BOILER/HEAT PUMP Design D021248 I.S. 78 - BROOKLYN BROOKLYN 22 PLANYC BOILER CONVERSION $4M OVER 2023/11 BOILER/HEAT PUMP Design D021248 I.S. 78 - BROOKLYN BROOKLYN 22 FIRE ALARM SYSTEM REPLACEMENT $4M OVER 2023/11 ELECTRICAL Design D022264 IT TAKES A VILLAGE ACADEMY - K BROOKLYN 18 FIRE ALARM SYSTEM REPLACEMENT $1M - $4M 2024/02 ELECTRICAL Design P026256 IT TAKES A VILLAGE ACADEMY - K BROOKLYN 18 CAFETERIA UPGRADE $4M OVER 2023/11 ROOM CONVERSIONS/UPGRADES Design P026256 IT TAKES A VILLAGE ACADEMY - K BROOKLYN 18 PATH OF TRAVEL CAFETERIA UPGRADE $4M OVER 2023/11 ACCESSIBILITY Design D021897 J.H.S. 50 - BROOKLYN BROOKLYN 14 REINFORCING SUPPORT ELEMENTS $1M - $4M 2023/12 BUILDING SYSTEMS Design D021706 K036 SPED - BROOKLYN BROOKLYN 19 ELEVATOR MODERNIZATION $1M - $4M 2024/03 BUILDING SYSTEMS Design D021706 K036 SPED - BROOKLYN BROOKLYN 19 FIRE ALARM SYSTEM REPLACEMENT $1M - $4M 2024/03 ELECTRICAL Design D021706 K036 SPED - BROOKLYN BROOKLYN 19 ELECTRICAL SYSTEMS $1M - $4M 2024/03 ELECTRICAL Design D021563 K370 SPED - BROOKLYN BROOKLYN 21 EXTERIOR MASONRY $1M - $4M 2023/11 EXT. WORK Design D022047 K372 SPED - BROOKLYN BROOKLYN 15 PLAYGROUND UPGRADE $500K - $750K 2024/01 PLAYGROUNDS Design D021195 K721 SPED - BROOKLYN BROOKLYN 21 RESO A KITCHEN UPGRADE $1M - $4M 2023/11 WALK-IN REFRIGERATORS AND FREEZERS Design D021012 K753 SPED - BROOKLYN BROOKLYN 13 FULL PROGRAM ACCESSIBILITY $1M - $4M 2023/11 ACCESSIBILITY Design D021570 K753 SPED - BROOKLYN BROOKLYN 13 ROOFS $4M OVER 2023/11 EXT. WORK Design D021570 K753 SPED - BROOKLYN BROOKLYN 13 PARAPETS $4M OVER 2023/11 EXT. WORK Design D019802 K811 SPED - BROOKLYN BROOKLYN 22 FULL PROGRAM ACCESSIBILITY $4M OVER 2023/12 ACCESSIBILITY Design D019802 K811 SPED - BROOKLYN BROOKLYN 22 LOW VOLTAGE ELECTRICAL SYSTEM $4M OVER 2023/12 ELECTRICAL Design D020898 LEADERS HIGH SCHOOL - K BROOKLYN 21 PATH OF TRAVEL RESO A LIBRARY UPGRADE $1M - $4M 2023/11 ACCESSIBILITY Design D020898 LEADERS HIGH SCHOOL - K BROOKLYN 21 RESO A LIBRARY UPGRADE $1M - $4M 2023/11 LIBRARY UPGRADES Design D021739 LIBERTY AVENUE MIDDLE SCHOOL BROOKLYN 19 FULL PROGRAM ACCESSIBILITY $4M OVER 2024/03 ACCESSIBILITY Design D020776 LOVE IN ACTION DAY CARE BROOKLYN 23 ACS EARLY LEARN LEASE RENEWAL $250K - $500K 2024/02 LEASES Design D021305 MIDWOOD HS - BROOKLYN BROOKLYN 21 IDA FLOOD ELIMINATION $1M - $4M 2023/11 ATHLETIC FIELDS Design D021305 MIDWOOD HS - BROOKLYN BROOKLYN 21 IDA PAVED AREAS- BLACKTOP $1M - $4M 2023/11 SITE Design D021305 MIDWOOD HS - BROOKLYN BROOKLYN 21 IDA HEATING PLANT UPGRADE $1M - $4M 2023/11 BOILER/HEAT PUMP Design D021659 MOSDOTH DAY CARE CENTER, INC. BROOKLYN 17 ACS EARLY LEARN RENEWAL $250K - $500K 2024/04 LEASES Design D021503 P.S. 1 - BROOKLYN BROOKLYN 15 FULL PROGRAM ACCESSIBILITY $4M OVER 2023/11 ACCESSIBILITY Design D021503 P.S. 1 - BROOKLYN BROOKLYN 15 FIRE ALARM SYSTEM REPLACEMENT $4M OVER 2023/11 ELECTRICAL Design D021552 P.S. 1 - BROOKLYN BROOKLYN 15 ROOFS $1M - $4M 2023/11 EXT. WORK Design D021552 P.S. 1 - BROOKLYN BROOKLYN 15 PARAPETS $1M - $4M 2023/11 EXT. WORK Design D021552 P.S. 1 - BROOKLYN BROOKLYN 15 EXTERIOR MASONRY $1M - $4M 2023/11 EXT. WORK Design P026374 P.S. 101 - BROOKLYN BROOKLYN 21 RESO A IPDVS SYSTEM $250K - $500K 2023/11 ELECTRICAL Design D021811 P.S. 107 - BROOKLYN BROOKLYN 15 RESO A PLAYGROUND UPGRADE $500K - $750K 2024/02 PLAYGROUNDS Design D021822 P.S. 115 - BROOKLYN BROOKLYN 18 RESO A LIBRARY UPGRADE $500K - $750K 2024/02 LIBRARY UPGRADES Design D020536 P.S. 120 - BROOKLYN BROOKLYN 14 FULL PROGRAM ACCESSIBILITY $4M OVER 2023/11 ACCESSIBILITY Design D020536 P.S. 120 - BROOKLYN BROOKLYN 14 LOW VOLTAGE ELECTRICAL SYSTEM $4M OVER 2023/11 ELECTRICAL Design D021530 P.S. 120 - BROOKLYN BROOKLYN 14 ROOFS $4M OVER 2023/11 EXT. WORK Design D021530 P.S. 120 - BROOKLYN BROOKLYN 14 PARAPETS $4M OVER 2023/11 EXT. WORK Design D021530 P.S. 120 - BROOKLYN BROOKLYN 14 EXTERIOR MASONRY $4M OVER 2023/11 EXT. WORK Design D021843 P.S. 139 - BROOKLYN BROOKLYN 22 RESO A AUDITORIUM UPGRADE $750K - $1M 2023/11 AUDITORIUM UPGRADES Design D021969 P.S. 139 - BROOKLYN BROOKLYN 22 PATH OF TRAVEL RESO A AUDITORIUM UPGRADE $0 - $250K 2023/11 ACCESSIBILITY Design D022074 P.S. 139 - BROOKLYN BROOKLYN 22 EXTERIOR MASONRY $250K - $500K 2024/03 EXT. WORK Design D022102 P.S. 145 - BROOKLYN BROOKLYN 32 IPDVS CAMERA INSTALLATION $0 - $250K 2024/03 ELECTRICAL Design D022093 P.S. 15 - BROOKLYN BROOKLYN 15 IPDVS CAMERA INSTALLATION $0 - $250K 2024/01 ELECTRICAL Design D022103 P.S. 151 - BROOKLYN BROOKLYN 32 IPDVS CAMERA INSTALLATION $0 - $250K 2024/01 ELECTRICAL Design D021812 P.S. 152 - BROOKLYN BROOKLYN 22 RESO A PLAYGROUND UPGRADE $500K - $750K 2023/11 PLAYGROUNDS Design P026370 P.S. 156 - BROOKLYN BROOKLYN 23 IPDVS CAMERA INSTALLATION $250K - $500K 2023/11 ELECTRICAL Design D019420 P.S. 157 - BROOKLYN BROOKLYN 14 EXTERIOR MASONRY $4M OVER 2023/11 EXT. WORK Design D019420 P.S. 157 - BROOKLYN BROOKLYN 14 PARAPETS $4M OVER 2023/11 EXT. WORK Design D019420 P.S. 157 - BROOKLYN BROOKLYN 14 FLOOD ELIMINATION $4M OVER 2023/11 EXT. WORK Design D019420 P.S. 157 - BROOKLYN BROOKLYN 14 ROOFS $4M OVER 2023/11 EXT. WORK Design D022208 P.S. 157 - BROOKLYN BROOKLYN 14 WALK-IN REFRIGERATORS AND FREEZERS $500K - $750K 2024/03 WALK-IN REFRIGERATORS AND FREEZERS Design D018658 P.S. 169 - BROOKLYN BROOKLYN 15 FULL PROGRAM ACCESSIBILITY $4M OVER 2024/03 ACCESSIBILITY Design D018658 P.S. 169 - BROOKLYN BROOKLYN 15 LOW VOLTAGE ELECTRICAL SYSTEM $4M OVER 2024/03 ELECTRICAL Design D020186 P.S. 169 - BROOKLYN BROOKLYN 15 RESO A PLAYGROUND UPGRADE $500K - $750K 2024/03 PLAYGROUNDS Design D021554 P.S. 18 - BROOKLYN BROOKLYN 14 ROOFS $4M OVER 2024/02 EXT. WORK Design D021554 P.S. 18 - BROOKLYN BROOKLYN 14 PARAPETS $4M OVER 2024/02 EXT. WORK Design D021554 P.S. 18 - BROOKLYN BROOKLYN 14 EXTERIOR MASONRY $4M OVER 2024/02 EXT. WORK Design D021554 P.S. 18 - BROOKLYN BROOKLYN 14 PLAYGROUND UPGRADE $4M OVER 2024/02 PLAYGROUNDS Design D022106 P.S. 190 - BROOKLYN BROOKLYN 19 IPDVS INSTALLATION $250K - $500K 2024/03 ELECTRICAL Design D020630 P.S. 193 - BROOKLYN BROOKLYN 22 FULL PROGRAM ACCESSIBILITY $4M OVER 2023/11 ACCESSIBILITY Design D020630 P.S. 193 - BROOKLYN BROOKLYN 22 LOW VOLTAGE ELECTRICAL SYSTEM $4M OVER 2023/11 ELECTRICAL Design D021559 P.S. 193 - BROOKLYN BROOKLYN 22 PARAPETS $4M OVER 2024/02 EXT. WORK Design D021559 P.S. 193 - BROOKLYN BROOKLYN 22 EXTERIOR MASONRY $4M OVER 2024/02 EXT. WORK Design D021559 P.S. 193 - BROOKLYN BROOKLYN 22 ROOFS $4M OVER 2024/02 EXT. WORK Design P026374 P.S. 199 - BROOKLYN BROOKLYN 21 IPDVS CAMERA INSTALLATION $250K - $500K 2023/11 ELECTRICAL Design D021221 P.S. 20 - BROOKLYN BROOKLYN 13 FULL PROGRAM ACCESSIBILITY $4M OVER 2023/12 ACCESSIBILITY Design D021221 P.S. 20 - BROOKLYN BROOKLYN 13 PLAYGROUND RENOVATION $4M OVER 2023/12 PLAYGROUNDS Design D021221 P.S. 20 - BROOKLYN BROOKLYN 13 FIRE ALARM SYSTEM $4M OVER 2023/12 ELECTRICAL Design D021567 P.S. 20 - BROOKLYN BROOKLYN 13 ROOFS $4M OVER 2023/12 EXT. WORK Design D021567 P.S. 20 - BROOKLYN BROOKLYN 13 PARAPETS $4M OVER 2023/12 EXT. WORK Design D021567 P.S. 20 - BROOKLYN BROOKLYN 13 EXTERIOR MASONRY $4M OVER 2023/12 EXT. WORK Design D021758 P.S. 209 - BROOKLYN BROOKLYN 21 TCU REMOVAL/PLAYGROUND REDEVELOPMENT $1M - $4M 2023/11 PLAYGROUNDS Design D021561 P.S. 221 - BROOKLYN BROOKLYN 17 ROOFS $4M OVER 2024/02 EXT. WORK Design D021561 P.S. 221 - BROOKLYN BROOKLYN 17 PARAPETS $4M OVER 2024/02 EXT. WORK Design D021561 P.S. 221 - BROOKLYN BROOKLYN 17 EXTERIOR MASONRY $4M OVER 2024/02 EXT. WORK Design D021561 P.S. 221 - BROOKLYN BROOKLYN 17 FLOOD ELIMINATION $4M OVER 2024/02 EXT. WORK Design D020924 P.S. 222 - BROOKLYN BROOKLYN 22 RESO A PLAYGROUND UPGRADE $500K - $750K 2024/01 PLAYGROUNDS Design D022109 P.S. 222 - BROOKLYN BROOKLYN 22 IPDVS CAMERA INSTALLATION $0 - $250K 2024/01 ELECTRICAL Design D019402 P.S. 224 - BROOKLYN BROOKLYN 19 EXTERIOR MASONRY $4M OVER 2023/11 EXT. WORK Design D019402 P.S. 224 - BROOKLYN BROOKLYN 19 PARAPETS $4M OVER 2023/11 EXT. WORK Design D019402 P.S. 224 - BROOKLYN BROOKLYN 19 FLOOD ELIMINATION $4M OVER 2023/11 EXT. WORK Design D019402 P.S. 224 - BROOKLYN BROOKLYN 19 ROOFS $4M OVER 2023/11 EXT. WORK Design D019402 P.S. 224 - BROOKLYN BROOKLYN 19 AIR CONDENSING UNIT $4M OVER 2023/11 BUILDING SYSTEMS Design D021818 P.S. 229 - BROOKLYN BROOKLYN 20 RESO A LIBRARY UPGRADE $500K - $750K 2023/11 LIBRARY UPGRADES Design D019244 P.S. 235 - BROOKLYN BROOKLYN 18 REPLACE (3) ROOF TOP UNITS $1M - $4M 2023/11 BUILDING SYSTEMS Design D019244 P.S. 235 - BROOKLYN BROOKLYN 18 ROOFS $1M - $4M 2023/11 EXT. WORK Design D021876 P.S. 24 - BROOKLYN BROOKLYN 15 RESO A PLAYGROUND UPGRADE $500K - $750K 2024/05 PLAYGROUNDS Scope D022095 P.S. 24 - BROOKLYN BROOKLYN 15 IPDVS CAMERA INSTALLATION $0 - $250K 2023/12 ELECTRICAL Design D021788 P.S. 251 - BROOKLYN BROOKLYN 22 RESO A (MA) LIBRARY UPGRADE $500K - $750K 2023/11 LIBRARY UPGRADES Design D021977 P.S. 251 - BROOKLYN BROOKLYN 22 PATH OF TRAVEL RESO A LIBRARY UPGRADE $0 - $250K 2023/11 ACCESSIBILITY Design D020446 P.S. 253 - BROOKLYN BROOKLYN 21 EXISTING BUILDING RENOVATION WORK $1M - $4M 2023/11 MISCELLANEOUS Design D022110 P.S. 255 - BROOKLYN BROOKLYN 22 IPDVS CAMERA INSTALLATION $0 - $250K 2024/01 ELECTRICAL Design D021740 P.S. 257 - BROOKLYN BROOKLYN 14 FULL PROGRAM ACCESSIBILITY $4M OVER 2024/02 ACCESSIBILITY Design D021740 P.S. 257 - BROOKLYN BROOKLYN 14 LOW VOLTAGE ELECTRICAL SYSTEMS $4M OVER 2024/02 ELECTRICAL Design D022111 P.S. 257 - BROOKLYN BROOKLYN 14 IPDVS CAMERA INSTALLATION $0 - $250K 2024/02 ELECTRICAL Design D018694 P.S. 261 - BROOKLYN BROOKLYN 15 FLOOD ELIMINATION $4M OVER 2023/11 EXT. WORK Design D018694 P.S. 261 - BROOKLYN BROOKLYN 15 PARAPETS $4M OVER 2023/11 EXT. WORK Design D018694 P.S. 261 - BROOKLYN BROOKLYN 15 ROOFS $4M OVER 2023/11 EXT. WORK Design D018694 P.S. 261 - BROOKLYN BROOKLYN 15 PLAYGROUND REDEVELOPMENT $4M OVER 2023/11 PLAYGROUNDS Design D021685 P.S. 261 - BROOKLYN BROOKLYN 15 TCU REMOVAL/PLAYGROUND REDEVELOPMENT $1M - $4M 2024/01 PLAYGROUNDS Design D021744 P.S. 261 - BROOKLYN BROOKLYN 15 PATH OF TRAVEL TCU REMOVAL/PLAYGROUND REDEVELOPMENT $0 - $250K 2023/12 ACCESSIBILITY Design D021814 P.S. 262 - BROOKLYN BROOKLYN 16 RESO A PLAYGROUND UPGRADE $1M - $4M 2024/02 PLAYGROUNDS Design D021849 P.S. 264 - BROOKLYN BROOKLYN 20 RESO A AUDITORIUM UPGRADE $250K - $500K 2023/12 AUDITORIUM UPGRADES Design D021816 P.S. 272 - BROOKLYN BROOKLYN 18 RESO A MULTIMEDIA CENTER $500K - $750K 2023/11 LIBRARY UPGRADES Design D021978 P.S. 272 - BROOKLYN BROOKLYN 18 PATH OF TRAVEL RESO A MULTIMEDIA CENTER $0 - $250K 2023/11 ACCESSIBILITY Design D017767 P.S. 284 - BROOKLYN BROOKLYN 23 SWIMMING POOL $4M OVER 2024/03 MISCELLANEOUS Design D020190 P.S. 284 - BROOKLYN BROOKLYN 23 RESO A PATH OF TRAVEL PLAYGROUND UPGRADE $0 - $250K 2023/11 ACCESSIBILITY Design D020192 P.S. 284 - BROOKLYN BROOKLYN 23 RESO A PLAYGROUND UPGRADE $250K - $500K 2023/11 PLAYGROUNDS Design D021524 P.S. 284 - BROOKLYN BROOKLYN 23 ROOFS $4M OVER 2023/11 EXT. WORK Design D021524 P.S. 284 - BROOKLYN BROOKLYN 23 PARAPETS $4M OVER 2023/11 EXT. WORK Design D021524 P.S. 284 - BROOKLYN BROOKLYN 23 EXTERIOR MASONRY $4M OVER 2023/11 EXT. WORK Design D021524 P.S. 284 - BROOKLYN BROOKLYN 23 WINDOWS $4M OVER 2023/11 EXT. WORK Design D021524 P.S. 284 - BROOKLYN BROOKLYN 23 EXTERIOR DOORS $4M OVER 2023/11 SCHOOL SAFETY Design D021524 P.S. 284 - BROOKLYN BROOKLYN 23 FLOOD ELIMINATION $4M OVER 2023/11 EXT. WORK Design D022060 P.S. 284 - BROOKLYN BROOKLYN 23 PATH OF TRAVEL SWIMMING POOL $0 - $250K 2023/12 ACCESSIBILITY Design D021504 P.S. 29 - BROOKLYN BROOKLYN 15 FULL PROGRAM ACCESSIBILITY $4M OVER 2023/11 ACCESSIBILITY Design D021504 P.S. 29 - BROOKLYN BROOKLYN 15 LOW VOLTAGE ELECTRICAL SYSTEMS $4M OVER 2023/11 ELECTRICAL Design D022112 P.S. 297 - BROOKLYN BROOKLYN 14 IPDVS CAMERA INSTALLATION $0 - $250K 2024/04 ELECTRICAL Design D022113 P.S. 298 - BROOKLYN BROOKLYN 23 IPDVS INSTALLATION $0 - $250K 2024/01 ELECTRICAL Design D020647 P.S. 299 - BROOKLYN BROOKLYN 32 FULL PROGRAM ACCESSIBILITY $4M OVER 2023/11 ACCESSIBILITY Design D020647 P.S. 299 - BROOKLYN BROOKLYN 32 PA SYSTEM REPLACEMENT $4M OVER 2023/11 ELECTRICAL Design P026364 P.S. 307 - BROOKLYN BROOKLYN 13 IPDVS CAMERA INSTALLATION $500K - $750K 2023/11 ELECTRICAL Design D021710 P.S. 308 - BROOKLYN BROOKLYN 16 PLAYGROUND UPGRADE $1M - $4M 2024/01 PLAYGROUNDS Design D019397 P.S. 31 - BROOKLYN BROOKLYN 14 FULL PROGRAM ACCESSIBILITY $4M OVER 2023/11 ACCESSIBILITY Design D021824 P.S. 312 - BROOKLYN BROOKLYN 22 RESO A LIBRARY UPGRADE $1M - $4M 2024/01 LIBRARY UPGRADES Design D021823 P.S. 316 - BROOKLYN BROOKLYN 17 RESO A AUDITORIUM UPGRADE $250K - $500K 2024/01 AUDITORIUM UPGRADES Design D022190 P.S. 327 - BROOKLYN BROOKLYN 23 ROOFS $4M OVER 2024/03 EXT. WORK Design D022190 P.S. 327 - BROOKLYN BROOKLYN 23 PARAPETS $4M OVER 2024/03 EXT. WORK Design D022190 P.S. 327 - BROOKLYN BROOKLYN 23 EXTERIOR MASONRY $4M OVER 2024/03 EXT. WORK Design D021562 P.S. 329 - BROOKLYN BROOKLYN 21 ROOFS $4M OVER 2024/01 EXT. WORK Design D021562 P.S. 329 - BROOKLYN BROOKLYN 21 PARAPETS $4M OVER 2024/01 EXT. WORK Design D021562 P.S. 329 - BROOKLYN BROOKLYN 21 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design D022115 P.S. 346 - BROOKLYN BROOKLYN 19 IPDVS INSTALLATION $250K - $500K 2024/04 ELECTRICAL Design D019250 P.S. 384 - BROOKLYN BROOKLYN 32 ROOF REPLACEMENT $4M OVER 2023/12 EXT. WORK Design P026370 P.S. 446 - BROOKLYN BROOKLYN 23 IPDVS INSTALLATION $250K - $500K 2023/11 ELECTRICAL Design D020535 P.S. 45 - BROOKLYN BROOKLYN 32 FULL PROGRAM ACCESSIBILITY $4M OVER 2023/11 ACCESSIBILITY Design D020761 P.S. 45 - BROOKLYN BROOKLYN 32 ROOFS $4M OVER 2023/11 EXT. WORK Design D020761 P.S. 45 - BROOKLYN BROOKLYN 32 EXTERIOR MASONRY $4M OVER 2023/11 EXT. WORK Design D020761 P.S. 45 - BROOKLYN BROOKLYN 32 ROOFTOP EXHAUST FAN REPLACEMENT $4M OVER 2023/11 BUILDING SYSTEMS Design D021753 P.S. 503 - BROOKLYN BROOKLYN 20 CHILLER REPLACEMENT $4M OVER 2023/11 BUILDING SYSTEMS Design D021753 P.S. 503 - BROOKLYN BROOKLYN 20 AHU REPLACEMENT $4M OVER 2023/11 BUILDING SYSTEMS Design D021753 P.S. 503 - BROOKLYN BROOKLYN 20 BMS UPGRADE $4M OVER 2023/11 BOILER/HEAT PUMP Design D019398 P.S. 54 - BROOKLYN BROOKLYN 13 FULL PROGRAM ACCESSIBILITY $4M OVER 2023/11 ACCESSIBILITY Design D019398 P.S. 54 - BROOKLYN BROOKLYN 13 FIRE ALARM REPLACEMENT $4M OVER 2023/11 ELECTRICAL Design P026371 P.S. 56 - BROOKLYN BROOKLYN 13 IPDVS INSTALLATION $500K - $750K 2023/11 ELECTRICAL Design D021846 P.S. 6 - BROOKLYN BROOKLYN 17 RESO A AUDITORIUM UPGRADE $250K - $500K 2023/12 AUDITORIUM UPGRADES Design D021515 P.S. 67 - BROOKLYN BROOKLYN 13 FULL PROGRAM ACCESSIBILITY $4M OVER 2024/01 ACCESSIBILITY Design D021515 P.S. 67 - BROOKLYN BROOKLYN 13 PA SYSTEM REPLACEMENT $4M OVER 2024/01 ELECTRICAL Design D022207 P.S. 705 - BROOKLYN BROOKLYN 17 WALK-IN REFRIGERATORS AND FREEZERS $500K - $750K 2024/03 WALK-IN REFRIGERATORS AND FREEZERS Design D021827 P.S. 748 - BROOKLYN BROOKLYN 20 RESO A ELECTRICAL UPGRADE $0 - $250K 2024/03 ELECTRICAL Design D022170 P.S. 748 - BROOKLYN BROOKLYN 20 EXTERIOR MASONRY $1M - $4M 2024/03 EXT. WORK Design D022170 P.S. 748 - BROOKLYN BROOKLYN 20 PARAPETS $1M - $4M 2024/03 EXT. WORK Design D021821 P.S. 8 - BROOKLYN BROOKLYN 13 RESO A PLAYGROUND UPGRADE $250K - $500K 2023/12 PLAYGROUNDS Design D021568 P.S. 81 - BROOKLYN BROOKLYN 16 ROOFS $1M - $4M 2024/02 EXT. WORK Design D021568 P.S. 81 - BROOKLYN BROOKLYN 16 PARAPETS $1M - $4M 2024/02 EXT. WORK Design D021568 P.S. 81 - BROOKLYN BROOKLYN 16 EXTERIOR MASONRY $1M - $4M 2024/02 EXT. WORK Design D021568 P.S. 81 - BROOKLYN BROOKLYN 16 FLOOD ELIMINATION $1M - $4M 2024/02 EXT. WORK Design D020645 P.S. 84 - BROOKLYN BROOKLYN 14 FULL PROGRAM ACCESSIBILITY $4M OVER 2023/11 ACCESSIBILITY Design D021556 P.S. 86 - BROOKLYN BROOKLYN 32 ROOFS $1M - $4M 2023/11 EXT. WORK Design D021556 P.S. 86 - BROOKLYN BROOKLYN 32 EXTERIOR MASONRY $1M - $4M 2023/11 EXT. WORK Design D021556 P.S. 86 - BROOKLYN BROOKLYN 32 FLOOD ELIMINATION $1M - $4M 2023/11 EXT. WORK Design D020806 P.S. 90 - BROOKLYN BROOKLYN 21 FLOOD ELIMINATION $4M OVER 2023/12 EXT. WORK Design D020806 P.S. 90 - BROOKLYN BROOKLYN 21 ROOFS $4M OVER 2023/12 EXT. WORK Design D020806 P.S. 90 - BROOKLYN BROOKLYN 21 PARAPETS $4M OVER 2023/12 EXT. WORK Design D020806 P.S. 90 - BROOKLYN BROOKLYN 21 EXTERIOR MASONRY $4M OVER 2023/12 EXT. WORK Design D021142 P.S. 90 - BROOKLYN BROOKLYN 21 RESO A ROOFTOP GARDEN $4M OVER 2023/12 EXT. WORK Design P026364 P.S. 93 - BROOKLYN BROOKLYN 13 IPDVS NSTALLATION $500K - $750K 2023/11 ELECTRICAL Design D021114 P.S. 94 - BROOKLYN BROOKLYN 15 VENTILATION $4M OVER 2023/11 BUILDING SYSTEMS Design D021114 P.S. 94 - BROOKLYN BROOKLYN 15 FIRE ALARM SYSTEM REPLACEMENT $4M OVER 2023/11 ELECTRICAL Design D021114 P.S. 94 - BROOKLYN BROOKLYN 15 BMS UPGRADE $4M OVER 2023/11 BOILER/HEAT PUMP Design D017779 P.S. 97 - BROOKLYN BROOKLYN 21 PLANYC BOILER CONVERSION $4M OVER 2023/11 BOILER/HEAT PUMP Design D018260 P.S. 97 - BROOKLYN BROOKLYN 21 PLANYC CLIMATE CONTROL $1M - $4M 2023/11 BOILER/HEAT PUMP Design D022045 R. CARSON SCL OF COASTAL ST-K BROOKLYN 21 RESO A ROOM CONVERSIONS / PARTITIONING $500K - $750K 2024/02 ROOM CONVERSIONS/UPGRADES Design D022272 R. CARSON SCL OF COASTAL ST-K BROOKLYN 21 PATH OF TRAVEL RESO A ROOM CONVERSIONS/PARTITIONING $0 - $250K 2024/02 ACCESSIBILITY Design D021842 RIVERDALE AVENUE MIDDLE SCHOOL BROOKLYN 23 RESO A AUDITORIUM UPGRADE $500K - $750K 2024/01 AUDITORIUM UPGRADES Design D021971 RIVERDALE AVENUE MIDDLE SCHOOL BROOKLYN 23 PATH OF TRAVEL RESO A AUDITORIUM UPGRADE $0 - $250K 2023/12 ACCESSIBILITY Design D021754 THE URBAN ASSEMBLY SCHOOL FOR COLLABORATIVE HEALTHCARE BROOKLYN 19 ACCESSIBLE RAMP $1M - $4M 2024/01 ACCESSIBILITY Design D020777 URBAN STRATEGIES DAY CARE CENTER SITE 1 BROOKLYN 19 ACS EARLY LEARN LEASE IMPROVEMENT $500K - $750K 2023/12 LEASES Design D022175 URBAN STRATEGIES DAY CARE CENTER SITE 1 BROOKLYN 19 PATH OF TRAVEL $0 - $250K 2024/01 ACCESSIBILITY Design D021555 WHITELAW REID ACADEMY OF ARTS AND BUSINESS - BROOKLYN BROOKLYN 16 PARAPETS $4M OVER 2024/01 EXT. WORK Design D021555 WHITELAW REID ACADEMY OF ARTS AND BUSINESS - BROOKLYN BROOKLYN 16 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design D021555 WHITELAW REID ACADEMY OF ARTS AND BUSINESS - BROOKLYN BROOKLYN 16 WINDOWS $4M OVER 2024/01 EXT. WORK Design D021555 WHITELAW REID ACADEMY OF ARTS AND BUSINESS - BROOKLYN BROOKLYN 16 PAVED AREAS- CONCRETE $4M OVER 2024/01 SITE Design D020890 WIILIAMSBURG PREP- BROOKLYN BROOKLYN 14 FIRE ALARM SYSTEM $1M - $4M 2023/11 ELECTRICAL Design D019803 BERGTRAUM HS - MANHATTAN MANHATTAN 02 ATHLETIC FIELD UPGRADE $4M OVER 2023/12 ATHLETIC FIELDS Design D021209 CENTRAL PARK EAST HS - MANHATTAN MANHATTAN 04 NON-IDA PLAYGROUND UPGRADE $4M OVER 2024/02 PLAYGROUNDS Design D021519 EAST SIDE COMMUNITY SCHOOL MANHATTAN 01 VENTILATION $4M OVER 2023/11 BUILDING SYSTEMS Design D021519 EAST SIDE COMMUNITY SCHOOL MANHATTAN 01 FIRE ALARM SYSTEM REPLACEMENT $4M OVER 2023/11 ELECTRICAL Design D022161 FIORELLO LAGUARDIA HS - MANHATTAN MANHATTAN 03 STAIRWELL WALLS $1M - $4M 2024/03 INTERIOR Design D021715 FREDERICK DOUGLAS ACADEMY - M MANHATTAN 05 ROOF LEAK $4M OVER 2023/12 EXT. WORK Design D021715 FREDERICK DOUGLAS ACADEMY - M MANHATTAN 05 EXTERIOR MASONRY $4M OVER 2023/12 EXT. WORK Design D021715 FREDERICK DOUGLAS ACADEMY - M MANHATTAN 05 WINDOWS $4M OVER 2023/12 EXT. WORK Design D021880 HAMILTON GRANGE MIDDLE SCHOOL MANHATTAN 06 RESO A AUDITORIUM UPGRADE $250K - $500K 2024/01 AUDITORIUM UPGRADES Design P026117 I.S. 104 - MANHATTAN MANHATTAN 02 RESO A (MA) FITNESS ROOM $750K - $1M 2023/11 GYMNASIUM Design P026117 I.S. 104 - MANHATTAN MANHATTAN 02 PATH OF TRAVEL RESO A FITNESS ROOM $750K - $1M 2023/11 ACCESSIBILITY Design D021908 I.S. 324 - MANHATTAN MANHATTAN 06 WALK-IN REFRIGERATORS AND FREEZERS $500K - $750K 2023/11 WALK-IN REFRIGERATORS AND FREEZERS Design D021603 I.S. 328 - MANHATTAN MANHATTAN 06 ROOFS $4M OVER 2023/11 EXT. WORK Design D021603 I.S. 328 - MANHATTAN MANHATTAN 06 PARAPETS $4M OVER 2023/11 EXT. WORK Design D021603 I.S. 328 - MANHATTAN MANHATTAN 06 EXTERIOR MASONRY $4M OVER 2023/11 EXT. WORK Design D021687 I.S. 328 - MANHATTAN MANHATTAN 06 SCIENCE LAB UPGRADES $1M - $4M 2023/12 SCIENCE LAB UPGRADES Design D021900 I.S. 328 - MANHATTAN MANHATTAN 06 PATH OF TRAVEL SCIENCE LAB UPGRADE $0 - $250K 2024/02 ACCESSIBILITY Design D021636 I.S. 528 - MANHATTAN MANHATTAN 06 RESO A PLAYGROUND UPGRADE $500K - $750K 2023/11 PLAYGROUNDS Design D021858 I.S. 896 - MANHATTAN MANHATTAN 02 RESO A LIBRARY UPGRADE $250K - $500K 2024/01 LIBRARY UPGRADES Design D021936 I.S. 896 - MANHATTAN MANHATTAN 02 PATH OF TRAVEL RESO A LIBRARY UPGRADE $0 - $250K 2024/02 ACCESSIBILITY Design D018801 J. K. ONASSIS HS FOR INT CAREERS-M MANHATTAN 02 FLOOD ELIMINATION $4M OVER 2023/11 EXT. WORK Design D018801 J. K. ONASSIS HS FOR INT CAREERS-M MANHATTAN 02 PARAPETS $4M OVER 2023/11 EXT. WORK Design D018801 J. K. ONASSIS HS FOR INT CAREERS-M MANHATTAN 02 EXTERIOR MASONRY $4M OVER 2023/11 EXT. WORK Design D018801 J. K. ONASSIS HS FOR INT CAREERS-M MANHATTAN 02 ROOFS $4M OVER 2023/11 EXT. WORK Design D018801 J. K. ONASSIS HS FOR INT CAREERS-M MANHATTAN 02 WINDOWS $4M OVER 2023/11 EXT. WORK Design D020709 J.H.S. 292 - MANHATTAN MANHATTAN 01 LOW-VOLTAGE ELECTRICAL SYSTEM $1M - $4M 2023/11 ELECTRICAL Design D017131 MURRAY HILL ACADEMY HS - M MANHATTAN 02 EXTERIOR MASONRY $4M OVER 2023/11 EXT. WORK Design D017131 MURRAY HILL ACADEMY HS - M MANHATTAN 02 FLOOD ELIMINATION $4M OVER 2023/11 EXT. WORK Design D017131 MURRAY HILL ACADEMY HS - M MANHATTAN 02 ROOFS $4M OVER 2023/11 EXT. WORK Design D017131 MURRAY HILL ACADEMY HS - M MANHATTAN 02 PARAPETS $4M OVER 2023/11 EXT. WORK Design D017131 MURRAY HILL ACADEMY HS - M MANHATTAN 02 WINDOWS $4M OVER 2023/11 EXT. WORK Design D021781 NEW DESIGN MIDDLE SCHOOL - MANHATTAN MANHATTAN 05 WALK-IN REFRIGERATORS AND FREEZERS $250K - $500K 2023/11 WALK-IN REFRIGERATORS AND FREEZERS Design D019271 NEW YORK HARBOR SCHOOL - MANHATTAN MANHATTAN 02 STRUCTURAL ISSUES $750K - $1M 2023/11 BUILDING SYSTEMS Design D022024 NEW YORK HARBOR SCHOOL - MANHATTAN MANHATTAN 02 IPDVS UPGRADE- EXISTING BUILDING $0 - $250K 2023/12 ELECTRICAL Design D021643 NYC LAB MIDDLE SCHOOL - MANHATTAN MANHATTAN 02 RESO A LOCKER ROOM UPGRADE $1M - $4M 2024/05 GYMNASIUM Scope D022213 P.S. 108 - MANHATTAN MANHATTAN 04 WALK-IN REFRIGERATORS AND FREEZERS $250K - $500K 2024/03 WALK-IN REFRIGERATORS AND FREEZERS Design D022280 P.S. 11 - MANHATTAN MANHATTAN 02 RESO A PLAYGROUND UPGRADE $250K - $500K 2024/05 PLAYGROUNDS Scope D020990 P.S. 110 - MANHATTAN MANHATTAN 01 FACADE REMEDIATION @M110 $4M OVER 2023/11 EXT. WORK Design D020990 P.S. 110 - MANHATTAN MANHATTAN 01 PARAPETS $4M OVER 2023/11 EXT. WORK Design D020990 P.S. 110 - MANHATTAN MANHATTAN 01 ROOFS $4M OVER 2023/11 EXT. WORK Design D020990 P.S. 110 - MANHATTAN MANHATTAN 01 FLOOD ELIMINATION $4M OVER 2023/11 EXT. WORK Design D022123 P.S. 111 - MANHATTAN MANHATTAN 02 IPDVS CAMERA INSTALLATION $250K - $500K 2024/02 ELECTRICAL Design D020321 P.S. 115 - MANHATTAN MANHATTAN 06 FLOOD ELIMINATION $4M OVER 2023/11 EXT. WORK Design D020321 P.S. 115 - MANHATTAN MANHATTAN 06 PARAPETS $4M OVER 2023/11 EXT. WORK Design D020321 P.S. 115 - MANHATTAN MANHATTAN 06 EXTERIOR MASONRY $4M OVER 2023/11 EXT. WORK Design D020321 P.S. 115 - MANHATTAN MANHATTAN 06 WINDOWS $4M OVER 2023/11 EXT. WORK Design D020321 P.S. 115 - MANHATTAN MANHATTAN 06 ELECTRICAL UPGRADE $4M OVER 2023/11 ELECTRICAL Design D021307 P.S. 116 - MANHATTAN MANHATTAN 02 RESO A PLAYGROUND UPGRADE $500K - $750K 2024/04 PLAYGROUNDS Design D021183 P.S. 124 - MANHATTAN MANHATTAN 02 RESO A PLAYGROUND UPGRADE $0 - $250K 2024/01 PLAYGROUNDS Design D021903 P.S. 125 - MANHATTAN MANHATTAN 05 RESO A CAFETERIA UPGRADE $250K - $500K 2024/01 ROOM CONVERSIONS/UPGRADES Design D021904 P.S. 125 - MANHATTAN MANHATTAN 05 RESO A POOL UPGRADE $4M OVER 2024/04 MISCELLANEOUS Design D021972 P.S. 125 - MANHATTAN MANHATTAN 05 PATH OF TRAVEL RESO A POOL UPGRADE $0 - $250K 2024/02 ACCESSIBILITY Design D022263 P.S. 128 - MANHATTAN MANHATTAN 06 RESO A IPDVS CAMERA INSTALLATION $0 - $250K 2024/04 ELECTRICAL Design D022124 P.S. 133 - MANHATTAN MANHATTAN 05 IPDVS CAMERA INSTALLATION $0 - $250K 2023/11 ELECTRICAL Design D021572 P.S. 146 - MANHATTAN MANHATTAN 04 ROOFS $4M OVER 2023/11 EXT. WORK Design D021572 P.S. 146 - MANHATTAN MANHATTAN 04 EXTERIOR MASONRY $4M OVER 2023/11 EXT. WORK Design D021572 P.S. 146 - MANHATTAN MANHATTAN 04 FLOOD ELIMINATION $4M OVER 2023/11 EXT. WORK Design D022214 P.S. 152 - MANHATTAN MANHATTAN 06 WALK-IN REFRIGERATORS AND FREEZERS $250K - $500K 2024/03 WALK-IN REFRIGERATORS AND FREEZERS Design D021647 P.S. 154 - MANHATTAN MANHATTAN 05 FIRE ALARM SYSTEM REPLACEMENT $750K - $1M 2023/11 ELECTRICAL Design D020677 P.S. 165 - MANHATTAN MANHATTAN 03 RESO A AUDITORIUM UPGRADE $1M - $4M 2024/05 AUDITORIUM UPGRADES Scope D021835 P.S. 165 - MANHATTAN MANHATTAN 03 RESO A GYMNASIUM UPGRADE $750K - $1M 2024/03 GYMNASIUM Design D021974 P.S. 187 - MANHATTAN MANHATTAN 06 PATH OF TRAVEL RESO A PLAYGROUND UPGRADE $0 - $250K 2023/12 ACCESSIBILITY Design D022119 P.S. 19 - MANHATTAN MANHATTAN 01 IPDVS CAMERA INSTALLATION $250K - $500K 2023/12 ELECTRICAL Design D021741 P.S. 192 - MANHATTAN MANHATTAN 06 OTHER TEMP STRUCTURE REMOVAL/PAVED AREA-CONCRETE $1M - $4M 2023/12 SITE Design P026133 P.S. 192 - MANHATTAN MANHATTAN 06 PAVED AREAS - CONCRETE $1M - $4M 2023/11 SITE Design P026133 P.S. 192 - MANHATTAN MANHATTAN 06 EXTERIOR STAIRS $1M - $4M 2023/11 EXT. WORK Design D022129 P.S. 199 - MANHATTAN MANHATTAN 03 IPDVS CAMERA INSTALLATION $250K - $500K 2024/01 ELECTRICAL Design D021796 P.S. 225 - MANHATTAN MANHATTAN 02 RESO A LOCKER ROOM UPGRADE $1M - $4M 2023/12 GYMNASIUM Design D021953 P.S. 225 - MANHATTAN MANHATTAN 02 PATH OF TRAVEL RESO A LOCKER ROOM UPGRADE $0 - $250K 2023/12 ACCESSIBILITY Design D022010 P.S. 28 - MANHATTAN MANHATTAN 06 WATER INFILTRATION INTO ELECTRCIAL EQUIPMENT $1M - $4M 2024/01 EXT. WORK Design D022010 P.S. 28 - MANHATTAN MANHATTAN 06 FIRE ALARM SYSTEM REPLACEMENT $1M - $4M 2024/01 ELECTRICAL Design D021655 P.S. 290 - MANHATTAN MANHATTAN 02 RESO A ROOFTOP PLAYGROUND $4M OVER 2023/11 EXT. WORK Design P026376 P.S. 3 - MANHATTAN MANHATTAN 02 IPDVS CAMERA INSTALLATION $250K - $500K 2023/11 ELECTRICAL Design D022215 P.S. 311 - MANHATTAN MANHATTAN 06 WALK-IN REFRIGERATORS AND FREEZERS $250K - $500K 2024/03 WALK-IN REFRIGERATORS AND FREEZERS Design D019558 P.S. 333 - MANHATTAN MANHATTAN 03 RPZ BACKFLOW PREVENTION DEVICES $500K - $750K 2023/11 ELECTRICAL Design D021766 P.S. 37 - MANHATTAN MANHATTAN 04 SIDEWALK REPAIR $1M - $4M 2023/12 SITE Design P026376 P.S. 42 - MANHATTAN MANHATTAN 02 IPDVS CAMERA INSTALLATION $250K - $500K 2023/11 ELECTRICAL Design D022068 P.S. 452 - MANHATTAN MANHATTAN 03 GYM CEILING RESTORATION- PERMANENT FIX $500K - $750K 2024/01 GYMNASIUM Design D022022 P.S. 46 - MANHATTAN MANHATTAN 05 OTHER TEMP STRUCTURE REMOVAL/PAVED AREA-CONCRETE $1M - $4M 2024/02 PLAYGROUNDS Design D017528 P.S. 48 - MANHATTAN MANHATTAN 06 CERTIFICATE OF OCCUPANCY $1M - $4M 2023/11 ADMIN/CODE COMP Design D021097 P.S. 48 - MANHATTAN MANHATTAN 06 FIRE ALARM $4M OVER 2024/05 ELECTRICAL Design D021097 P.S. 48 - MANHATTAN MANHATTAN 06 ELECTRIFICATION/HEAT PUMP SYSTEMS $4M OVER 2024/05 BOILER ELECTRIFICATION Design D021097 P.S. 48 - MANHATTAN MANHATTAN 06 WINDOWS $4M OVER 2024/05 EXT. WORK Design D021209 P.S. 497 - MANHATTAN MANHATTAN 04 IDA FLOOD ELIMINATION $4M OVER 2024/02 EXT. WORK Design D021209 P.S. 497 - MANHATTAN MANHATTAN 04 IDA ELECTRICAL UPGRADE $4M OVER 2024/02 ELECTRICAL Design D021209 P.S. 497 - MANHATTAN MANHATTAN 04 IDA ROOFS $4M OVER 2024/02 EXT. WORK Design D021209 P.S. 497 - MANHATTAN MANHATTAN 04 IDA HEATING PLANT UPGRADE $4M OVER 2024/02 BOILER/HEAT PUMP Design D021209 P.S. 497 - MANHATTAN MANHATTAN 04 IDA INTERIOR SPACES $4M OVER 2024/02 INTERIOR Design D021750 P.S. 497 - MANHATTAN MANHATTAN 04 PATH OF TRAVEL IDA FLOOD ELIMINATION $250K - $500K 2024/02 ACCESSIBILITY Design D019951 P.S. 64 - MANHATTAN MANHATTAN 01 RESO A PLAYGROUND UPGRADE $1M - $4M 2023/12 PLAYGROUNDS Design D020191 P.S. 64 - MANHATTAN MANHATTAN 01 RESO A PATH OF TRAVEL PLAYGROUND UPGRADE $0 - $250K 2023/12 ACCESSIBILITY Design D022121 P.S. 75 - MANHATTAN MANHATTAN 03 IPDVS CAMERA INSTALLATION $250K - $500K 2024/01 ELECTRICAL Design D022122 P.S. 89 - MANHATTAN MANHATTAN 02 IPDVS CAMERA INSTALLATION $0 - $250K 2024/02 ELECTRICAL Design D021751 P.S. 98 - MANHATTAN MANHATTAN 06 OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT: $1M - $4M 2024/01 PLAYGROUNDS Design D022054 P.S. 98 - MANHATTAN MANHATTAN 06 PATH OF TRAVEL-OTHER TEMP STRUCTURE REMOVAL $0 - $250K 2023/12 ACCESSIBILITY Design D021210 P.S./I.S. 276 - MANHATTAN MANHATTAN 02 IDA INTERIOR SPACES $750K - $1M 2023/12 INTERIOR Design D021210 P.S./I.S. 276 - MANHATTAN MANHATTAN 02 IDA FLOOD ELIMINATION $750K - $1M 2023/12 EXT. WORK Design D020325 SCHOOL OF THE FUTURE - MANHATTAN MANHATTAN 02 FLOOD ELIMINATION $1M - $4M 2023/11 EXT. WORK Design D020325 SCHOOL OF THE FUTURE - MANHATTAN MANHATTAN 02 WINDOWS $1M - $4M 2023/11 EXT. WORK Design D020325 SCHOOL OF THE FUTURE - MANHATTAN MANHATTAN 02 EXTERIOR MASONRY $1M - $4M 2023/11 EXT. WORK Design D020784 U.F.B.C.O. MANHATTAN 06 ACS EARLY LEARN LEASE IMPROVEMENT $0 - $250K 2024/04 LEASES Design D021745 WADLEIGH SECONDARY SCHOOL FOR THE PERFORMING & VISUAL ARTS MANHATTAN 03 FLOOD ELIMINATION $1M - $4M 2024/02 EXT. WORK Design D022065 YOUNG WOMEN'S LEADERSHIP SCHOOL MANHATTAN 04 IPDVS CAMERA INSTALLATION $0 - $250K 2023/11 ELECTRICAL Design D021830 ACAD. OF MEDICAL TECHNOLOGY - Q QUEENS 27 RESO A ELECTRICAL UPGRADE $250K - $500K 2024/05 ELECTRICAL Scope D021205 AVIATION HS - QUEENS QUEENS 24 IDA FLOOD ELIMINATION $4M OVER 2023/11 EXT. WORK Design D021205 AVIATION HS - QUEENS QUEENS 24 IDA HEATING PLANT UPGRADE $4M OVER 2023/11 BOILER/HEAT PUMP Design D021205 AVIATION HS - QUEENS QUEENS 24 NON-IDA CLIMATE CONTROL $4M OVER 2023/11 BOILER/HEAT PUMP Design D021205 AVIATION HS - QUEENS QUEENS 24 IDA INTERIOR SPACES $4M OVER 2023/11 INTERIOR Design D019607 BAYSIDE HIGH SCHOOL - QUEENS QUEENS 26 RESO A ROOM CONVERSION $750K - $1M 2023/11 ROOM CONVERSIONS/UPGRADES Design D020024 BAYSIDE HIGH SCHOOL - QUEENS QUEENS 26 RESO A GREENHOUSE $1M - $4M 2024/02 SCIENCE LAB UPGRADES Design D018886 BENJAMIN N. CARDOZO HS - QUEENS QUEENS 26 RPZ VALVES $500K - $750K 2023/11 ELECTRICAL Design D021630 BUSINESS TECHNOLOGY EARLY COLLEGE HIGH SCHOOL QUEENS 26 LOW VOLTAGE ELECTRICAL SYSTEMS $4M OVER 2024/01 ELECTRICAL Design D019326 CHANNEL VIEW SCL FOR RESEARCH - Q QUEENS 27 SEA WALL / BULKHEAD REPAIR $4M OVER 2024/01 SITE Design D020200 CHANNEL VIEW SCL FOR RESEARCH - Q QUEENS 27 RESO A WEIGHT ROOM $1M - $4M 2024/02 GYMNASIUM Design D021309 COLLEGE POINT COLLABORATIVE - QUEENS QUEENS 25 RESO A PLAYGROUND UPGRADE $500K - $750K 2023/12 PLAYGROUNDS Design D022169 COLLEGE POINT COLLABORATIVE - QUEENS QUEENS 25 RESO A EXTERIOR DOOR $0 - $250K 2024/03 SCHOOL SAFETY Design D021658 DISTRICT 25 PRE-K CENTER QUEENS 25 FIRE ALARM SYSTEM REPLACEMENT $1M - $4M 2023/11 ELECTRICAL Design D021794 FLUSHING HS - QUEENS QUEENS 25 RESO A ATHLETIC FIELD UPGRADE $4M OVER 2024/03 ATHLETIC FIELDS Design D021810 FLUSHING HS - QUEENS QUEENS 25 RESO A GYMNASIUM UPGRADE $500K - $750K 2024/05 GYMNASIUM Scope D021872 FOREST HILLS HS - QUEENS QUEENS 28 RESO A AUDITORIUM UPGRADE $1M - $4M 2024/01 AUDITORIUM UPGRADES Design D021266 FRANCIS LEWIS HS - QUEENS QUEENS 26 IDA FLOOD ELIMINATION $4M OVER 2023/11 EXT. WORK Design D021266 FRANCIS LEWIS HS - QUEENS QUEENS 26 NON-IDA REINFORCE SUPPORT ELEMENTS $4M OVER 2023/11 BUILDING SYSTEMS Design D021266 FRANCIS LEWIS HS - QUEENS QUEENS 26 IDA HEATING PLANT UPGRADE $4M OVER 2023/11 BOILER/HEAT PUMP Design D021266 FRANCIS LEWIS HS - QUEENS QUEENS 26 IDA INTERIOR SPACES $4M OVER 2023/11 INTERIOR Design D019994 HS FOR ARTS AND BUSINESS - QUEENS QUEENS 24 EXTERIOR MASONRY $4M OVER 2024/02 EXT. WORK Design D019994 HS FOR ARTS AND BUSINESS - QUEENS QUEENS 24 PARAPETS $4M OVER 2024/02 EXT. WORK Design D019994 HS FOR ARTS AND BUSINESS - QUEENS QUEENS 24 ROOFS $4M OVER 2024/02 EXT. WORK Design D019994 HS FOR ARTS AND BUSINESS - QUEENS QUEENS 24 FLOOD ELIMINATION $4M OVER 2024/02 EXT. WORK Design D021241 I.S. 109 - QUEENS QUEENS 29 LOW VOLTAGE ELECTRICAL SYSTEM $1M - $4M 2023/11 ELECTRICAL Design D021838 I.S. 119 - QUEENS QUEENS 24 RESO A COMPUTER LAB UPGRADE $250K - $500K 2024/02 ROOM CONVERSIONS/UPGRADES Design D021837 I.S. 126 - QUEENS QUEENS 30 RESO A SCIENCE LAB $500K - $750K 2024/05 SCIENCE LAB UPGRADES Design D020332 I.S. 202 - QUEENS QUEENS 27 FLOOD ELIMINATION $4M OVER 2023/11 EXT. WORK Design D020332 I.S. 202 - QUEENS QUEENS 27 PARAPETS $4M OVER 2023/11 EXT. WORK Design D020332 I.S. 202 - QUEENS QUEENS 27 ROOFS $4M OVER 2023/11 EXT. WORK Design D020332 I.S. 202 - QUEENS QUEENS 27 EXTERIOR MASONRY $4M OVER 2023/11 EXT. WORK Design D020332 I.S. 202 - QUEENS QUEENS 27 SIDEWALK REPAIR $4M OVER 2023/11 SITE Design D020332 I.S. 202 - QUEENS QUEENS 27 WINDOWS $4M OVER 2023/11 EXT. WORK Design D022229 I.S. 202 - QUEENS QUEENS 27 WALK-IN REFRIGERATORS AND FREEZERS $500K - $750K 2024/03 WALK-IN REFRIGERATORS AND FREEZERS Design D021008 I.S. 226 - QUEENS QUEENS 27 RTU REPLACEMENT $1M - $4M 2023/11 BUILDING SYSTEMS Design D021008 I.S. 226 - QUEENS QUEENS 27 ROOFS $1M - $4M 2023/11 EXT. WORK Design D020730 I.S. 294 - QUEENS QUEENS 25 RESO A AUDITORIUM UPGRADE $250K - $500K 2023/11 AUDITORIUM UPGRADES Design D021885 I.S. 5 - QUEENS QUEENS 24 RESO A PLAYGROUND UPGRADE $250K - $500K 2023/11 PLAYGROUNDS Design D022226 I.S. 53 - QUEENS QUEENS 27 WALK-IN REFRIGERTAORS AND FREEZERS $500K - $750K 2024/03 WALK-IN REFRIGERATORS AND FREEZERS Design D021605 I.S. 59 - QUEENS QUEENS 29 ROOFS $4M OVER 2023/11 EXT. WORK Design D021605 I.S. 59 - QUEENS QUEENS 29 PARAPETS $4M OVER 2023/11 EXT. WORK Design D021605 I.S. 59 - QUEENS QUEENS 29 EXTERIOR MASONRY $4M OVER 2023/11 EXT. WORK Design D019634 I.S. 73 - QUEENS QUEENS 24 SMOKE PURGE SYSTEM $750K - $1M 2023/11 ELECTRICAL Design D021041 I.S. 74 - QUEENS QUEENS 26 IDA FLOOD ELIMINATION $4M OVER 2023/11 EXT. WORK Design D021041 I.S. 74 - QUEENS QUEENS 26 IDA INTERIOR SPACES $4M OVER 2023/11 INTERIOR Design D021041 I.S. 74 - QUEENS QUEENS 26 IDA DOMESTIC PIPING $4M OVER 2023/11 ELECTRICAL Design D021041 I.S. 74 - QUEENS QUEENS 26 IDA ELECTRICAL SYSTEMS $4M OVER 2023/11 ELECTRICAL Design D021041 I.S. 74 - QUEENS QUEENS 26 IDA CLIMATE CONTROL $4M OVER 2023/11 BOILER/HEAT PUMP Design D022025 J.H.S. 190 - QUEENS QUEENS 28 RESO A SCHOOLYARD UPGRADE $750K - $1M 2024/02 PLAYGROUNDS Design D021606 J.H.S. 67 - QUEENS QUEENS 26 ROOFS $4M OVER 2023/11 EXT. WORK Design D021606 J.H.S. 67 - QUEENS QUEENS 26 PARAPETS $4M OVER 2023/11 EXT. WORK Design D021606 J.H.S. 67 - QUEENS QUEENS 26 EXTERIOR MASONRY $4M OVER 2023/11 EXT. WORK Design D022238 J.H.S. 72 - QUEENS QUEENS 28 RESO A SUPPLEMENTAL COOLING $1M - $4M 2024/05 BUILDING SYSTEMS Scope P026304 JAMAICA GATEWAY TO THE SCIENCES - Q QUEENS 28 SCIENCE LAB UPGRADE $1M - $4M 2023/11 SCIENCE LAB UPGRADES Design D021043 JOHN BOWNE HS - QUEENS QUEENS 25 IDA FLOOD ELIMINATION $4M OVER 2023/12 EXT. WORK Design D021043 JOHN BOWNE HS - QUEENS QUEENS 25 IDA INTERIOR SPACES $4M OVER 2023/12 INTERIOR Design D021471 JOHN BOWNE HS - QUEENS QUEENS 25 PATH OF TRAVEL IDA GYM FLOOR REPLACEMENT $0 - $250K 2023/12 ACCESSIBILITY Design D022256 JOHN BOWNE HS - QUEENS QUEENS 25 PATH OF TRAVEL IDA INTERIOR SPACES $0 - $250K 2023/12 ACCESSIBILITY Design D022273 JOHN BOWNE HS - QUEENS QUEENS 25 RPZ BACKFLOW PREVENTION DEVICES $1M - $4M 2024/02 ELECTRICAL Design D022080 LONG ISLAND CITY HS - Q QUEENS 30 PUBLIC ADDRESS SYSTEM REPLACEMENT $1M - $4M 2024/02 ELECTRICAL Design D020346 M.S. 282 - QUEENS QUEENS 27 SWIMMING POOL $4M OVER 2024/01 MISCELLANEOUS Design D021630 MARTIN VAN BUREN HS - QUEENS QUEENS 26 FULL PROGRAM ACCESSIBILITY $4M OVER 2024/01 ACCESSIBILITY Design D021182 NEWTOWN HS - QUEENS QUEENS 24 RESO A CAFETERIA UPGRADE $250K - $500K 2023/11 ROOM CONVERSIONS/UPGRADES Design D022134 P.S. 107 - QUEENS QUEENS 25 IPDVS CAMERA INSTALLATION $0 - $250K 2023/12 ELECTRICAL Design D021677 P.S. 110 - QUEENS QUEENS 24 RESO A IPDVS CAMERA INSTALLATION $0 - $250K 2024/01 ELECTRICAL Design D021713 P.S. 116 - QUEENS QUEENS 29 EXISTING BUILDING-INTERIOR RENOVATION/PROGRAM ACCESSIBILITY $4M OVER 2024/03 MISCELLANEOUS Design D021608 P.S. 122 - QUEENS QUEENS 30 ROOFS $4M OVER 2023/12 EXT. WORK Design D021608 P.S. 122 - QUEENS QUEENS 30 PARAPETS $4M OVER 2023/12 EXT. WORK Design D021608 P.S. 122 - QUEENS QUEENS 30 EXTERIOR MASONRY $4M OVER 2023/12 EXT. WORK Design D021608 P.S. 122 - QUEENS QUEENS 30 FLOOD ELIMINATION $4M OVER 2023/12 EXT. WORK Design D018395 P.S. 131 - QUEENS QUEENS 29 PHASE 4 EXISTING BUILDING WORK $500K - $750K 2023/12 MISCELLANEOUS Design D019982 P.S. 131 - QUEENS QUEENS 29 WINDOWS $4M OVER 2023/11 EXT. WORK Design D019982 P.S. 131 - QUEENS QUEENS 29 EXTERIOR MASONRY $4M OVER 2023/11 EXT. WORK Design D019982 P.S. 131 - QUEENS QUEENS 29 FLOOD ELIMINATION $4M OVER 2023/11 EXT. WORK Design D021917 P.S. 131 - QUEENS QUEENS 29 DRAINAGE $1M - $4M 2024/01 SITE Design D022254 P.S. 136 - QUEENS QUEENS 29 LSP HOT WATER HEATER REPLACEMENT $250K - $500K 2024/01 BOILER/HEAT PUMP Design D021874 P.S. 14 - QUEENS QUEENS 24 RESO A ROOM CONVERSION $0 - $250K 2023/12 ROOM CONVERSIONS/UPGRADES Design P026359 P.S. 14 - QUEENS QUEENS 24 RESO A PATH OF TRAVEL AUDITORIUM UPGRADE $500K - $750K 2023/11 ACCESSIBILITY Design P026359 P.S. 14 - QUEENS QUEENS 24 RESO A AUDITORIUM UPGRADE $500K - $750K 2023/11 AUDITORIUM UPGRADES Design D021609 P.S. 147 - QUEENS QUEENS 29 ROOFS $4M OVER 2023/12 EXT. WORK Design D021609 P.S. 147 - QUEENS QUEENS 29 PARAPETS $4M OVER 2023/12 EXT. WORK Design D021609 P.S. 147 - QUEENS QUEENS 29 EXTERIOR MASONRY $4M OVER 2023/12 EXT. WORK Design D022249 P.S. 15 - QUEENS QUEENS 29 IPDVS CAMERA INSTALLATION $0 - $250K 2024/03 ELECTRICAL Design D020851 P.S. 152 - QUEENS QUEENS 30 ROOFS $4M OVER 2023/11 EXT. WORK Design D020851 P.S. 152 - QUEENS QUEENS 30 PARAPETS $4M OVER 2023/11 EXT. WORK Design D020851 P.S. 152 - QUEENS QUEENS 30 EXTERIOR MASONRY $4M OVER 2023/11 EXT. WORK Design D020851 P.S. 152 - QUEENS QUEENS 30 GYM WINDOWS $4M OVER 2023/11 EXT. WORK Design D020851 P.S. 152 - QUEENS QUEENS 30 RTU REPLACEMENT $4M OVER 2023/11 BUILDING SYSTEMS Design D020851 P.S. 152 - QUEENS QUEENS 30 FIRE ALARM REPLACEMENT $4M OVER 2023/11 ELECTRICAL Design D021878 P.S. 156 - QUEENS QUEENS 29 RESO A COMPUTER LAB UPGRADE $250K - $500K 2023/12 ROOM CONVERSIONS/UPGRADES Design D021925 P.S. 156 - QUEENS QUEENS 29 PATH OF TRAVEL RESO A COMPUTER LAB UPGRADE $0 - $250K 2023/12 ACCESSIBILITY Design D022063 P.S. 161 - QUEENS QUEENS 28 WINDOWS $4M OVER 2024/03 EXT. WORK Design D022063 P.S. 161 - QUEENS QUEENS 28 PARAPETS $4M OVER 2024/03 EXT. WORK Design D020733 P.S. 162 - QUEENS QUEENS 26 PLAYGROUND REDEVELOPMENT $500K - $750K 2024/03 PLAYGROUNDS Design D022135 P.S. 165 - QUEENS QUEENS 25 IPDVS CAMERA INSTALLATION $0 - $250K 2023/12 ELECTRICAL Design D021779 P.S. 169 - QUEENS QUEENS 25 ELECTRIFICATION/HEAT PUMP SYSTEMS $4M OVER 2024/03 BOILER ELECTRIFICATION Design D021779 P.S. 169 - QUEENS QUEENS 25 ELECTRICAL UPGRADE $4M OVER 2024/03 ELECTRICAL Design D021779 P.S. 169 - QUEENS QUEENS 25 WINDOWS $4M OVER 2024/03 EXT. WORK Design D021779 P.S. 169 - QUEENS QUEENS 25 ROOFS $4M OVER 2024/03 EXT. WORK Design P026367 P.S. 17 - QUEENS QUEENS 30 IPDVS CAMERA INSTALLATION $250K - $500K 2023/11 ELECTRICAL Design D021020 P.S. 174 - QUEENS QUEENS 28 EXISTING BUILDING-PA/CLOCK SYSTEMS $1M - $4M 2023/11 ELECTRICAL Design D021020 P.S. 174 - QUEENS QUEENS 28 EXISTING BUILDING-FIRE ALARM SYSTEM $1M - $4M 2023/11 ELECTRICAL Design D021020 P.S. 174 - QUEENS QUEENS 28 EXISTING BUILDING- INTERIOR RENOVATIONS $1M - $4M 2023/11 MISCELLANEOUS Design D021020 P.S. 174 - QUEENS QUEENS 28 EXISTING BUILDING-AUDITORIUM $1M - $4M 2023/11 ACCESSIBILITY Design D021020 P.S. 174 - QUEENS QUEENS 28 EXISTING BUILDING-GYMNASIUM $1M - $4M 2023/11 ACCESSIBILITY Design D021610 P.S. 184 - QUEENS QUEENS 25 ROOFS $4M OVER 2024/02 EXT. WORK Design D021610 P.S. 184 - QUEENS QUEENS 25 PARAPETS $4M OVER 2024/02 EXT. WORK Design D021610 P.S. 184 - QUEENS QUEENS 25 EXTERIOR MASONRY $4M OVER 2024/02 EXT. WORK Design D020067 P.S. 206 - QUEENS QUEENS 28 SSBA - EXISTING SCHOOL RENOVATION WORK $1M - $4M 2023/11 MISCELLANEOUS Design D021613 P.S. 206 - QUEENS QUEENS 28 ROOFS $4M OVER 2024/02 EXT. WORK Design D021613 P.S. 206 - QUEENS QUEENS 28 PARAPETS $4M OVER 2024/02 EXT. WORK Design D021613 P.S. 206 - QUEENS QUEENS 28 EXTERIOR MASONRY $4M OVER 2024/02 EXT. WORK Design D021725 P.S. 206 - QUEENS QUEENS 28 SSBA - DEMOLITION OF TCU UNIT AND PLAYGROUND DEVELOPMENT $1M - $4M 2023/12 PLAYGROUNDS Design P026372 P.S. 207 - QUEENS QUEENS 27 RESO A LIBRARY UPGRADE $500K - $750K 2023/11 LIBRARY UPGRADES Design P026372 P.S. 207 - QUEENS QUEENS 27 PATH OF TRAVEL RESO A LIBRARY UPGRADE $500K - $750K 2023/11 ACCESSIBILITY Design D021575 P.S. 209 - QUEENS QUEENS 25 ROOFS $4M OVER 2024/01 EXT. WORK Design D021575 P.S. 209 - QUEENS QUEENS 25 PARAPETS $4M OVER 2024/01 EXT. WORK Design D021575 P.S. 209 - QUEENS QUEENS 25 WINDOWS $4M OVER 2024/01 EXT. WORK Design D021575 P.S. 209 - QUEENS QUEENS 25 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design P026367 P.S. 225 - QUEENS QUEENS 27 IPDVS CAMERA INSTALLATION $250K - $500K 2023/11 ELECTRICAL Design D020344 P.S. 228 - QUEENS QUEENS 30 PARAPETS $4M OVER 2023/11 EXT. WORK Design D020344 P.S. 228 - QUEENS QUEENS 30 ROOFS $4M OVER 2023/11 EXT. WORK Design D020344 P.S. 228 - QUEENS QUEENS 30 EXTERIOR MASONRY $4M OVER 2023/11 EXT. WORK Design D021583 P.S. 239 - QUEENS QUEENS 24 EXTERIOR MASONRY $1M - $4M 2023/11 EXT. WORK Design D021866 P.S. 239 - QUEENS QUEENS 24 RESO A PLAYGROUND UPGRADE $250K - $500K 2024/01 PLAYGROUNDS Design D021198 P.S. 26 - QUEENS QUEENS 26 EXISTING BUILDING-GYMNASIUM $500K - $750K 2023/11 ACCESSIBILITY Design D021198 P.S. 26 - QUEENS QUEENS 26 EXISTING BUILDING-AUDITORIUM $500K - $750K 2023/11 ACCESSIBILITY Design D021264 P.S. 26 - QUEENS QUEENS 26 IDA FLOOD ELIMINATION $1M - $4M 2023/11 EXT. WORK Design D021264 P.S. 26 - QUEENS QUEENS 26 IDA INTERIOR SPACES $1M - $4M 2023/11 INTERIOR Design D021592 P.S. 268 - QUEENS QUEENS 29 ROOFS $750K - $1M 2024/02 EXT. WORK Design D021592 P.S. 268 - QUEENS QUEENS 29 EXTERIOR MASONRY $750K - $1M 2024/02 EXT. WORK Design D020704 P.S. 32 - QUEENS QUEENS 25 EXISTING BUILDING WORK $4M OVER 2023/11 OTHER Design D021107 P.S. 40 - QUEENS QUEENS 28 ROOF REPLACEMENT $4M OVER 2023/11 EXT. WORK Design D020447 P.S. 41 - QUEENS QUEENS 26 SSBA - WORK IN EXISTING BUILDING $1M - $4M 2023/11 MISCELLANEOUS Design D021893 P.S. 79 - QUEENS QUEENS 25 RESO A OUTDOOR CLASSROOM $250K - $500K 2023/11 PLAYGROUNDS Design D021847 P.S. 80 - QUEENS QUEENS 28 RESO A MULTIMEDIA CENTER $250K - $500K 2023/12 LIBRARY UPGRADES Design D019829 P.S. 84 - QUEENS QUEENS 30 STRUCTURAL REPAIRS $4M OVER 2023/11 BUILDING SYSTEMS Design D021573 P.S. 84 - QUEENS QUEENS 30 ROOFS $4M OVER 2023/12 EXT. WORK Design D021573 P.S. 84 - QUEENS QUEENS 30 EXTERIOR MASONRY $4M OVER 2023/12 EXT. WORK Design D021573 P.S. 84 - QUEENS QUEENS 30 FLOOD ELIMINATION $4M OVER 2023/12 EXT. WORK Design D021573 P.S. 84 - QUEENS QUEENS 30 FIRE ALARM SYSTEM REPLACEMENT $4M OVER 2023/12 ELECTRICAL Design D021573 P.S. 84 - QUEENS QUEENS 30 HVAC UPGRADES $4M OVER 2023/12 BUILDING SYSTEMS Design D021573 P.S. 84 - QUEENS QUEENS 30 WINDOWS $4M OVER 2023/12 EXT. WORK Design D021039 P.S. 87 - QUEENS QUEENS 24 IDA FLOOD ELIMINATION $250K - $500K 2023/11 EXT. WORK Design D021039 P.S. 87 - QUEENS QUEENS 24 IDA INTERIOR SPACES $250K - $500K 2023/11 INTERIOR Design D021870 P.S. 87 - QUEENS QUEENS 24 RESO A KITCHEN UPGRADE $1M - $4M 2024/01 WALK-IN REFRIGERATORS AND FREEZERS Design D019337 P.S. 89 - QUEENS QUEENS 24 FIRE ALARM REPLACEMENT $4M OVER 2023/11 ELECTRICAL Design D019337 P.S. 89 - QUEENS QUEENS 24 VENTILATION $4M OVER 2023/11 BUILDING SYSTEMS Design D021143 P.S. 92 - QUEENS QUEENS 30 PLAYGROUND UPGRADE $1M - $4M 2024/01 PLAYGROUNDS Design D021666 P.S. 95 - QUEENS QUEENS 29 EXISTING BUILDING-INTERIOR RENOVATION $1M - $4M 2023/12 MISCELLANEOUS Design D022245 Q811 SPED - QUEENS QUEENS 29 ROOF REPLACEMENT $1M - $4M 2023/12 EXT. WORK Design D022146 QNS HS FOR INF. RESEARCH & TECH.-Q QUEENS 27 RESO A RECORDING STUDIO $0 - $250K 2024/05 ROOM CONVERSIONS/UPGRADES Scope D022246 QNS HS OF TEACH., LIB. ARTS&SCI-Q QUEENS 26 UNION TPK BRIDGE OVER CROSS ISLAND PKWY IMPACT ON GLEN OAKS LIGHTING $250K - $500K 2024/03 MISCELLANEOUS Design P026304 QUEENS COLLEGIATE SCHOOL - QUEENS QUEENS 28 SCIENCE DEMO ROOM UPGRADES $1M - $4M 2023/11 SCIENCE LAB UPGRADES Design D021854 QUEENS METROPOLITAN HIGH SCHOOL - QUEENS QUEENS 28 RESO A LIBRARY UPGRADE $250K - $500K 2023/12 LIBRARY UPGRADES Design D020736 THOMAS A. EDISON HS - Q QUEENS 28 PATH OF TRAVEL RESO A SCIENCE LAB UPGRADE $0 - $250K 2024/02 SCIENCE LAB UPGRADES Design D020961 THOMAS A. EDISON HS - Q QUEENS 28 RESO A SCIENCE LAB UPGRADE $750K - $1M 2023/12 SCIENCE LAB UPGRADES Design D020818 YOUNG WOMENS' LEADERSHIP SCHOOL - QUEENS QUEENS 28 EXTERIOR MASONRY $1M - $4M 2023/11 EXT. WORK Design D020818 YOUNG WOMENS' LEADERSHIP SCHOOL - QUEENS QUEENS 28 ROOFS $1M - $4M 2023/11 EXT. WORK Design D021786 CONCORD HS - R STATEN ISLAND 31 RESO A ELECTRICAL UPGRADE $0 - $250K 2024/03 ELECTRICAL Design D022227 I.S. 61 - STATEN ISLAND STATEN ISLAND 31 WALK-IN REFRIGERATORS AND FREEZERS $500K - $750K 2024/03 WALK-IN REFRIGERATORS AND FREEZERS Design D021461 I.S. 72 - STATEN ISLAND STATEN ISLAND 31 CONCRETE PARAPET WALL $4M OVER 2023/11 EXT. WORK Design D021461 I.S. 72 - STATEN ISLAND STATEN ISLAND 31 EXTERIOR MASONRY $4M OVER 2023/11 EXT. WORK Design D021461 I.S. 72 - STATEN ISLAND STATEN ISLAND 31 ROOFS $4M OVER 2023/11 EXT. WORK Design D020275 NEW DORP HS - STATEN ISLAND STATEN ISLAND 31 RESO A FIELD UPGRADE $4M OVER 2023/12 ATHLETIC FIELDS Design D021853 P.S. 22 - STATEN ISLAND STATEN ISLAND 31 RESO A AUDITORIUM UPGRADE $250K - $500K 2024/05 AUDITORIUM UPGRADES Scope D021852 P.S. 23 - STATEN ISLAND STATEN ISLAND 31 RESO A GYMNASIUM UPGRADE $250K - $500K 2024/01 GYMNASIUM Design D021967 P.S. 23 - STATEN ISLAND STATEN ISLAND 31 PATH OF TRAVEL RESO A GYMNASIUM UPGRADE $0 - $250K 2024/02 ACCESSIBILITY Design D021702 P.S. 29 - STATEN ISLAND STATEN ISLAND 31 EXTERIOR MASONRY $4M OVER 2023/11 EXT. WORK Design D021702 P.S. 29 - STATEN ISLAND STATEN ISLAND 31 PARAPETS $4M OVER 2023/11 EXT. WORK Design D021702 P.S. 29 - STATEN ISLAND STATEN ISLAND 31 ROOFS $4M OVER 2023/11 EXT. WORK Design D018509 P.S. 3 - STATEN ISLAND STATEN ISLAND 31 CERTIFICATE OF OCCUPANCY $1M - $4M 2023/11 ADMIN/CODE COMP Design D021191 P.S. 30 - STATEN ISLAND STATEN ISLAND 31 RESO A (MA) PLAYGROUND UPGRADE $250K - $500K 2023/12 PLAYGROUNDS Design D021618 P.S. 31 - STATEN ISLAND STATEN ISLAND 31 ROOFS $4M OVER 2024/01 EXT. WORK Design D021618 P.S. 31 - STATEN ISLAND STATEN ISLAND 31 PARAPETS $4M OVER 2024/01 EXT. WORK Design D021618 P.S. 31 - STATEN ISLAND STATEN ISLAND 31 EXTERIOR MASONRY $4M OVER 2024/01 EXT. WORK Design D021480 P.S. 32 - STATEN ISLAND STATEN ISLAND 31 RESO A PLAYGROUND UPGRADE $500K - $750K 2024/03 PLAYGROUNDS Design D022288 P.S. 4 - STATEN ISLAND STATEN ISLAND 31 RESO A IPDVS UPGRADE $0 - $250K 2024/04 ELECTRICAL Design D020892 P.S. 41 - STATEN ISLAND STATEN ISLAND 31 PLANYC BOILER CONVERSION $4M OVER 2023/12 BOILER/HEAT PUMP Design D020892 P.S. 41 - STATEN ISLAND STATEN ISLAND 31 PLANYC CLIMATE CONTROL $4M OVER 2023/12 BOILER/HEAT PUMP Design D021597 P.S. 41 - STATEN ISLAND STATEN ISLAND 31 ROOFS $4M OVER 2023/12 EXT. WORK Design D021597 P.S. 41 - STATEN ISLAND STATEN ISLAND 31 PARAPETS $4M OVER 2023/12 EXT. WORK Design D021597 P.S. 41 - STATEN ISLAND STATEN ISLAND 31 EXTERIOR MASONRY $4M OVER 2023/12 EXT. WORK Design D021597 P.S. 41 - STATEN ISLAND STATEN ISLAND 31 WINDOWS $4M OVER 2023/12 EXT. WORK Design D021716 P.S. 41 - STATEN ISLAND STATEN ISLAND 31 ELECTRIFICATION/HEAT PUMP SYSTEMS $4M OVER 2023/11 BOILER ELECTRIFICATION Design D021716 P.S. 41 - STATEN ISLAND STATEN ISLAND 31 ELECTRICAL SERVICE UPGRADE $4M OVER 2023/11 ELECTRICAL Design D018391 P.S. 42 - STATEN ISLAND STATEN ISLAND 31 RESO A PLAYGROUNDS $750K - $1M 2023/11 PLAYGROUNDS Design D020703 P.S. 5 - STATEN ISLAND STATEN ISLAND 31 EXISTING BUILDING WORK $1M - $4M 2023/11 OTHER Design D020703 P.S. 5 - STATEN ISLAND STATEN ISLAND 31 EXISTING BUILDING-AUD/GYM $1M - $4M 2023/11 ACCESSIBILITY Design D021689 P.S. 53 - STATEN ISLAND STATEN ISLAND 31 FLOOD ELIMINATION $1M - $4M 2023/12 EXT. WORK Design D018009 P.S. 80 - STATEN ISLAND STATEN ISLAND 31 HVAC UPGRADES $4M OVER 2023/11 BUILDING SYSTEMS Design D018009 P.S. 80 - STATEN ISLAND STATEN ISLAND 31 EMERGENCY GENERATOR REPLACEMENT $4M OVER 2023/11 ELECTRICAL Design D018009 P.S. 80 - STATEN ISLAND STATEN ISLAND 31 VENTILATION $4M OVER 2023/11 BUILDING SYSTEMS Design D018009 P.S. 80 - STATEN ISLAND STATEN ISLAND 31 BMS UPGRADE $4M OVER 2023/11 BOILER/HEAT PUMP Design D022228 P.S. 80 - STATEN ISLAND STATEN ISLAND 31 WALK-IN REFRIGERATORS AND FREEZERS $750K - $1M 2024/03 WALK-IN REFRIGERATORS AND FREEZERS Design D022021 R000 - STATEN ISLAND STATEN ISLAND 31 OTHER TEMP STRUCTURE REMOVAL/PLAYGROUND REDEVELOPMENT: $1M - $4M 2023/12 PLAYGROUNDS Design D021203 THE RICHMOND PRE-K CENTER STATEN ISLAND 31 IDA FLOOD ELIMINATION $500K - $750K 2023/11 EXT. WORK Design D021203 THE RICHMOND PRE-K CENTER STATEN ISLAND 31 IDA INTERIOR SPACES $500K - $750K 2023/11 INTERIOR Design D022275 THE RICHMOND PRE-K CENTER STATEN ISLAND 31 PATH OF TRAVEL IDA INTERIOR SPACES $0 - $250K 2024/02 ACCESSIBILITY Design D021214 TOTTENVILLE HS - STATEN ISLAND STATEN ISLAND 31 NEW FIELDHOUSE BUILDING $4M OVER 2024/02 ATHLETIC FIELDS Design D021218 TOTTENVILLE HS - STATEN ISLAND STATEN ISLAND 31 FULL PROGRAM ACCESSIBILITY $4M OVER 2023/12 ACCESSIBILITY Design D021218 TOTTENVILLE HS - STATEN ISLAND STATEN ISLAND 31 LOW VOLTAGE ELECTRICAL SYSTEMS $4M OVER 2023/12 ELECTRICAL Design